pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Title: pp2pp analysis
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
Agenda:
1. Results with new transport - Kin
2. Discussion - all
Time | Talk | Presenter |
---|---|---|
14:00 | Results from the new transport matrices ( 00:20 ) 1 file | Kin Yip |
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Title: pp2pp analysis
Agenda: Systematic errors in 2003 and 2002 data - Stephen
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
Agenda:
1. Magnet information for Run 9- Steve
2. Trigger counter effciency - Kin
3. Systematic errors Run 2002/2003 - Stephen (to be confirmed)
4. The path forward - all
Time | Talk | Presenter |
---|---|---|
14:00 | BPM Trim Run 9 ( 00:30 ) 1 file | Phil Pile |
14:30 | SUMS and triggers ( 00:20 ) 1 file | Kin Yip |
pp2pp weekly
Physics 1-189, at 18:00 (GMT), duration : 01:30
TPC Voltage issue and discussion #3
1-189, at 18:00 (GMT), duration : 01:00
Meetings are being set to discuss and converge as far as the TPC voltage issue is concerned.
This is the third of this kind.
TPC Voltage issue and discussion #2
1-189, at 15:00 (GMT), duration : 01:00
This meeting is the second of this kind. Meetings are being set to discuss and converge as far as the TPC voltage issue is concerned.
Several action items and discussions were started since the first meeting (see especially this thread).
Level 2 and Level 3 milestones
Updated on Tue, 2011-01-18 17:26. Originally created by matis on 2011-01-18 17:26.SSD Phone Meeting - EVO
Updated on Tue, 2011-01-18 17:29. Originally created by matis on 2011-01-18 17:25.Universe: Title = STAR SSD upgrade (password needed), at 13:00 (GMT), duration : 00:00
1) News
2) Ladder Debug Board - Christophe
3) RDO FPGA work - Christophe
4) RDO board FPGA - Micheal
5) Ladder Board Assembly - Micheal
6) Cooling Documentation, Costs, and Schedule, Cooling TDR - Jim
7) Level 2 and Level 3 milestones (see spreadsheet below) - Howard
8) Visit of Nu (and Flemming?) to Nantes? - Jim
8) AOB
Time | Talk | Presenter |
---|---|---|
05:00 | Level 2 and Level 3 milestones ( 00:20 ) 1 file | Howard M. |
05:20 | Cooling ( 00:20 ) 1 file | Jim Thomas |
PYTHIA simulation in p+p collisions at 200 GeV using run5 geometry with JP2
Updated on Fri, 2011-07-15 09:07 by jwebb. Originally created by ruanlj on 2011-01-18 12:26.PYTHIA simulation in p+p collisions at 200 GeV using run5 geometry
Updated on Tue, 2011-02-22 11:36 by lbhajdu. Originally created by ruanlj on 2011-01-18 12:09.Track pT filter for minimum bias event :
The filter is to have a event with the maximum track pT larger than 2.5 GeV/c.
We would request 3M filtered events, which need cpu time ∼7200 hours and disk ∼100G for *MuDst.root, *minimc.root, and *starsim.log files (for counting how many really mb events are generated).
Chain options: "trs fss y2005h Idst IAna l0 tpcI fcf ftpc Tree logger ITTF Sti VFPPV NoSvtIt NoSsdIt bbcSim tofsim tags emcY2 EEfs evout IdTruth geantout big fzin MiniMcMk eemcDb beamLine clearmem sdt20050727"
Library: DEV
The details are at webpage
http://www.star.bnl.gov/protected/lfspectra/xuyichun/webs/simRun5/simFilter.htm
Request ID | 2011301 |
Priority: EC | 0 |
Priority: pwg | High |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | ruanlj |
Contact email(s) | ruanlj@rcf.rhic.bnl.gov, xuyichun@rcf.rhic.bnl.gov |
Contact phone(s) | 631-344-7635, 631-344-8028 |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
Request type: | Event generator simulation, with filtering |
Number of events | 3000000 = 3 M |
Magnetic Field | Full-Field |
Collision Type | pp 200GeV |
Centrality | ---- SELECT CENTRALITY ---- |
BFC tags | trs, fss, y2005h, Idst, IAna, l0, tpcI, fcf, ftpc, Tree, logger, ITTF, Sti, VFPPV, NoSvtIt, NoSsdIt, bbcSim, tofsim, tags, emcY2, EEfs, evout, IdTruth, geantout, big, fzin, MiniMcMk, eemcDb, beamLine, clearmem, sdt20050727 |
Production | ---- SELECT PRODUCTION TAG ---- |
Geometry: simu | y2005i |
Geometry: reco | y2005i |
Library | SL11a |
Vertex option | ---- SELECT VERTEX OPTION ---- |
Pileup option | No |
Detector Set |
Event generator | Pythia |
Extra options | mcfilt: highpt with PtCUT = 2.5 GeV and EtaCUT = 1.2. tune 329 ! (Perugia 0 + Prof. tune) |
Vertex Z, cm | -200 < Vertex < 200 |
Gaussian sigma in X,Y,Z (cm) if applicable | 0, 0, 60 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -6 < η < 6 |
Pt bin, GeV | 0 < Pt < 0 |
Macro file | /star/u/xuyichun/bnl/ppPID/Filters/tmp/runFilteredStarsim.kumac; /star/u/xuyichun/bnl/ppPID/Filters/tmp/StRoot/* |
TPC Voltage issue and discussion #1
1-189, at 21:30 (GMT), duration : 01:00
Meeting was set to discuss on was to converge with the TPC voltage issue. This is the first of a serie of meetings with the diverse experts.
Run 11 preparation meeting #8
1-189, EVO, at 19:00 (GMT), duration : 01:00
Minutes
Attendees: Wayne B., Leve H., Jérôme L., Gene V.B.
ShiftLog [Leve]:
- New server:
- Ready:
- App copied to new server (Wayne)
- Successfully passed stability tests (pounding on it)
- All WARs deployed
- Scripts ready to flush cache and re-copy WARs
- App copied to new server (Wayne)
- To do:
- Will re-check links to and from RunLog
- Watcher script not on yet
- Verify Offline QA Shift Report connections
- Ready:
Online infrastructure [Wayne]:
- New web server:
- Links on homepage checked
- Some issues with DB access and privilege from current node name (dean2)
- New jpgraph version installed in same location as the old one
- Disk exports are not in place, so content isn't being updated currently
- Will do another sync over the weekend or early next week, in addition to the final one when we swap servers
- Ganglia to be installed
- User accounts to be added
- Links on homepage checked
- New web server backup:
- Configuration kept the same as main new web server
- ...but content isn't sync-ed
- Password rotation completed
- mysql-devel installed on online linux nodes (RT 2068)
- Two online disk failures (on onl09 (non-critical) RT 2065 and on onlldap (critical) RT 2067)
- RAID still providing for the file systems in the interim
- ITD network backups failing (RT 2069), but resolution from ITD may have just come through
- Machine replacements:
- emcsc ready (needs either deployed by tomorrow or ITD block needs postponed)
- emcspin ready (Monday)
- starutilities awaiting C-AD software
FastOffline [Jerome]:
- Many files coming into the system, but all are tests, pulsers, etc., so not being processed
- Some missing detector setup, beam energy, etc. information: could mean misconfiguration, or potentially not properly propagated data
QA [Gene]:
- OnlinePlots switched back to newer EVP server
- Switching steps still undocumented
- Pre-combining of FastOffline files still needs tested and configured to be the default