HFT Hardware Meeting

2011-01-27 10:30
2011-01-27 11:30
America/Los Angeles
Thursday, 27 January 2011
Phone: +1 510 486 7333, at 15:30 (GMT), duration : 01:00

News - Flemming

Pixel Mechanical - Howard W.

Pixel Electrical - Leo

IST - Gerrit

SSD - Howard

Integration - Dana

AOB

TimeTalkPresenter
07:30Pixel Grounding ( 00:20 ) 1 fileLeo
07:50IST Grounding ( 00:20 ) 0 filesGerrit
08:10SSD Grounding ( 00:20 ) 1 fileHoward M.
08:30Mechanical Grounding ( 00:20 ) 0 filesEric
08:50Radiation Monitoring ( 00:20 ) 2 filesHoward M.

HFT Hardware Meeting

2011-01-20 10:30
2011-01-20 11:30
America/Los Angeles
Thursday, 20 January 2011
Phone: +1 510 486 7333, at 15:30 (GMT), duration : 01:00

 

News - Flemming

Pixel Mechanical - Howard W.

Pixel Electrical - Leo

IST - Gerrit

SSD - Howard

Integration - Dana

AOB

 

TimeTalkPresenter
10:30Technical support documentation for PXL ( 00:20 ) 2 filesLeo Greiner
10:50Cooling the SSD circa 2011 ( 00:20 ) 1 fileJim Thomas

Run 11 preparation meeting #6

2010-12-17 14:00
2010-12-17 15:00
America/New York
Friday, 17 December 2010
1-189, EVO, at 19:00 (GMT), duration : 01:00

 Minutes

Attendees: Kefeng, Wayne B., Leve H., Gene V.B., Dmitry A.

 

ShiftLog [Leve]:

  • Manual changes have been reviewed (by Jerome) and committed
  • Re-deployed

 

Databases [Dmitry]:

  • cdev enabled (by C-AD), so parameter propagation has begun
    • Some data is still empty (e.g. beam species) and may not be filled for several weeks (when beams actually start)
      • Might be possible to enter some default values for now
    • Numbers are meaningless, so not useful for FastOffline testing
  • Testing new hardware nodes now (2 are available)
    • Configuration of new nodes in discussion

 

Online Infrastructure [Wayne]:

  • STAR login environment needs to be able to handle SL5.5 (which was installed on some nodes)
    • Will follow up with Jerome
  • Online linux pool is losing roughly 1 node a day (rebooting)
    • Hit a few with network scans, but response was OK, so no clues
  • Spin request (for Pibero):
    • User has access to the nodes and is waiting for directory structures and mount points
      • Expect to complete within a few days
  • Condor installation on for rterm-like access to online pool from gateway
    • Installed on the gateway
    • Components for the pool nodes is to be done
  • Slowness on evp
    • Only occurred yesterday (Dec. 16)
    • Nothing obvious, but suspicious of AFS, and coincided with mock data transfer challenge from counting house to HPSS
    • Paths forward discussed:
      • Remove outside AFS dependence using an online repository
      • Remove AFS dependence using local codes on evp
      • Write a new tool better identify AFS issues (i.e. more proactive than 'fs checkservers')
    • Problem doesn't seem to persist, not a priority for now (no action)
  • Yury G. requested networking support for the east FPD/FMS rack
    • Just extends the starp network geographically
    • Needs to be a fiber connection for proper grounding
  • Webserver replacement
    • Two redhat 5 machines given the ITD thumbs up
    • Shared filespaces in progress
    • No services started yet
    • Request for an account to test tomcat (Leve)

 

QA [Gene]:

  • Demo of the Offline QA with reference histogram comparison
    • Missing some features for flexibly defining reference histogram sets (will work on over the holidays)
    • Minor suggestion made for improving the "waiting..." display

Run 11 preparation meeting #7

2011-01-07 14:00
2011-01-07 15:00
America/New York
Friday, 7 January 2011
1-189, EVO, at 19:00 (GMT), duration : 01:00

 Minutes

Attendees: Leve H., Dmitry A., Jerome L., Wayne B., Gene V.B.

 

Databases [Dmitry]:

  • All DB collectors running now
    • Only TPC voltages absent due to no data yet
  • Slow Controls Archiver not yet running to avoid collecting value-less data
    • With Run start imminent, this needs to get going
    •  Dmitry will follow up with Yury G.
  • Potential to benefit from an unused EPICS feature to read multiple channels in one request (we have been reading one channel at a time across the board), which could cut down the overhead in obtaining data
    • Unknown why this wasn't previously used, so testing with caution to learn (perhaps the multiple channel data comes in a burst which could fail for some reason)
  • New shift sign-up release is imminent (possibly today)
    • Only minor features getting final adjustments (features have been [node:19902 "previously presented"])
  • RunLog working fine: new runs appearing, but all being marked bad
    • Jerome notes that bad runs won't come through FastOffline, which has been turned on already
  • New DB nodes
    • Tested and ready for use
    • New configuration (relevant for FastOffline use) not yet in place (Jerome and Dmitry will work this out)
  • Online DB plots working and logs show usage
    • Only unavailable quantities are those collected from the Slow Controls Archiver

 

ShiftLog [Leve]:

  • New manual is printed out and in place at the counting house
  • ShiftLeader desktop computer has all the necessary icons, correctly linked and tested, including making a ShiftLog entry
  • New web server not critical (stable operation on old web server)

 

Online infrastructure [Wayne & Jerome]:

  • OS upgrade
    • One critical: a replacement node for usage in monitoring chilled water (old machine is Windows 2000) is awaiting ITD processing.
      • Follow-up with ITD on Monday if nothing transpires by then
    • Other machines in the queue ("bond", "beatrice", "l3disp")
  • Online web server replacement
    • Currently replicating old machine on new one: file copying and version checking
      • ShiftLog request to continue with same Tomcat version (a known quantity) instead of upgrading in hopes of improved stability
    • Spin resource request involves storage to be delivered on new server
  • Uncertainty in status of UPS services for computers at the experiment
    • Testing today before the Run starts
  • Network request for east FMS/FPD racks completed
  • Online linux pool has been stable for the past ~3 weeks (after a couple weeks of apparently random reboots)

 

FastOffline [Jerome]:

  • Ready, running, and waiting for data

 

QA [Gene]:

  • OnlinePlots still running on older evp machine (but stable)
    • Will look into moving it back over to the new node
    • Need Jeff L. to flip some switches (and document it)
  • Offline QA
    • Finished implementing tools to update just specific histograms in reference set
    • QA Shift set of histograms will be flushed next week and started anew
      • Histograms only go into the set if given a description, and only stay in the set if a reference is set

 

We are expecting some collider operations imminently, so data will likely flow through the entire system over the next week.

 

Spin Physics PWG meeting

2011-04-28 13:00
2011-04-28 14:30
America/New York
Thursday, 28 April 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-04-21 13:00
2011-04-21 14:30
America/New York
Thursday, 21 April 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-04-14 13:00
2011-04-14 14:30
America/New York
Thursday, 14 April 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-03-31 13:00
2011-03-31 14:30
America/New York
Thursday, 31 March 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-03-24 13:00
2011-03-24 14:30
America/New York
Thursday, 24 March 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-03-17 13:00
2011-03-17 14:30
America/New York
Thursday, 17 March 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-03-10 12:00
2011-03-10 13:30
America/New York
Thursday, 10 March 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-04-07 13:00
2011-04-07 14:30
America/New York
Thursday, 7 April 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-03-03 12:00
2011-03-03 13:30
America/New York
Thursday, 3 March 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-02-24 12:00
2011-02-24 13:30
America/New York
Thursday, 24 February 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-02-17 12:00
2011-02-17 13:30
America/New York
Thursday, 17 February 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-02-10 12:00
2011-02-10 13:30
America/New York
Thursday, 10 February 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-02-03 12:00
2011-02-03 13:30
America/New York
Thursday, 3 February 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-01-27 12:00
2011-01-27 13:30
America/New York
Thursday, 27 January 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-01-20 12:00
2011-01-20 13:30
America/New York
Thursday, 20 January 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30

Spin Physics PWG meeting

2011-01-13 12:00
2011-01-13 13:30
America/New York
Thursday, 13 January 2011
631-344-6100 or 626-395-2112, ID 81036, at 17:00 (GMT), duration : 01:30