Spin Physics PWG meeting
Updated on Thu, 2010-12-16 09:37. Originally created by sichterm on 2010-12-16 09:37.631-344-6100 or 626-395-2112, ID 57310 passwd 7894, at 16:00 (GMT), duration : 00:00
Understanding the data with Hector
Updated on Wed, 2010-12-15 13:59. Originally created by jhlee on 2010-12-15 13:59.Run8 200GeV dAu Hijing with forward pi0 filtering for BEMC pi0 reconstruction efficiency study
Updated on Tue, 2010-12-28 12:51 by jeromel. Originally created by fqwang on 2010-12-15 13:50.AOB
Updated on Wed, 2010-12-15 12:34. Originally created by jeromel on 2010-12-15 11:58.Speaker : All ( All )
Talk time : 12:50, Duration : 00:10
- Progress since last week (review of action items)
- Preparation of production samples for the h+/h- - status: on the way (see »
Production status and stats
Updated on Wed, 2010-12-15 11:44. Originally created by jeromel on 2010-12-15 11:44.Speaker : Jerome Lauret ( BNL )
Talk time : 12:35, Duration : 00:15
Please, see You do not have access to view this node
Year 2011 geometry status and production intents for Y11
Updated on Wed, 2010-12-15 12:00 by jwebb. Originally created by jeromel on 2010-12-15 11:43.Speaker : Jason Webb ( BNL )
Talk time : 12:20, Duration : 00:15
-
Requests in motion
Multi-site Data transfer project - status
Updated on Wed, 2010-12-15 11:44 by zer0. Originally created by jeromel on 2010-12-15 11:42.Speaker : Michal Zerola ( NPI / ASCR )
Talk time : 12:00, Duration : 00:20
Software and Computing phone meeting
1-189, EVO, at 17:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Multi-site Data transfer project - status ( 00:20 ) 1 file | Michal Zerola (NPI / ASCR) |
12:20 | Year 2011 geometry status and production intents for Y11 ( 00:15 ) 0 files | Jason Webb (BNL) |
12:35 | Production status and stats ( 00:15 ) 0 files | Jerome Lauret (BNL) |
12:50 | AOB ( 00:10 ) 0 files | All (All) |
SSD Phone Meeting
Updated on Mon, 2010-12-13 17:18. Originally created by matis on 2010-12-13 17:18.1 510 486 7333 - 8 AM PST, at 13:00 (GMT), duration : 00:00
News - Howard
Ladder Board Testing and RDO FPGAs - Christophe Ladder Board Assembly and RDO Board - Micheal Cooling Cost and Schedule - Jim Project Cost and Schedule - Howard Should Nu and/or Flemming visit SUBATECH? Next meeting date
Run 11 preparation meeting #5
1-189, at 19:00 (GMT), duration : 01:00
Attendees: Leve H., Dmitry A., Jérôme L., Wayne B., Gene V.B., Jeff L.
Minutes:
Databases [Dmitry]:
- Conditions collectors started (all except beam information related ones)
- Everything running appears to be OK and status can be checked from web
- Beam info needs cdev, provided by C-AD once their operations get going for the Run (also includes magnetic field setting; expect data around the time we turn on the STAR magnet)
- Absence of this data means RunLog does not finalize runs and information is not migrated to Offline, but this is expected to be OK for now for anyone doing online-only tests (requested to post a note to rts-hn about this)
- No migration issues expected, but TPC anode voltage recording practices need to be ironed out in the context of the Run 11 data (discuss with Maxim)
- Online DBs flushed
- As expected, a few failed links and missing web pages were noted (by users too) and fixed
- Once cdev is running, will be ready for turn on / testing of FastOffline
ShiftLog [Leve]:
- As expected, excluded from and not affected by DB flush
- Manual updated for instructions on changing run status (may receive further review & changes from Jerome)
Online nodes [Wayne]:
- AFS has been stable on the newer evp machine since last Friday
- Jeff's been using the machine (and AFS) without incident
- Will likely switch OnlinePlots back to this machine (from evp2, the older machine) next week
- Documentation requested for switching between these machines
- Replacement of dean at the stage of OS installation on new hardware
- Timeline for replacement should be well before Run starts, as disk space on the new machine has been requested for online use
- Trigger commissioning is a high priority part of the request for online node resources (Wayne will contact Pibero directly)
- Nothing to report on OS upgrades
Online QA - jevp demo [Jeff]:
- Code
- Subsystems have an xxxBuilder class (e.g. tpcBuilder, eemcBuilder, etc.) which inherits from a jevp base class for plots
- Plot objects can have multiple histograms added to them, as well as other graphical objects like lines and circles (as long as they are of some "component" type?)
- Configuration
- Editor allows hierarchical arrangement of plots into tabs and sub-tabs, under larger Sets (e.g. Shift, 2009, ESMD)
- Features drag & drop for re-arrangement
- Tabs can have collective properties for all plots underneath (such as setting all to have the same maximum)
- Plots can have individual properties (such as log y scale)
- Editor allows hierarchical arrangement of plots into tabs and sub-tabs, under larger Sets (e.g. Shift, 2009, ESMD)
- Running
- One server starts up several builders as separate processes
- Data is sent to the builders from a file or an event pool
- Presenter runs separately to display plots
- Similar basic look & feel to current OnlinePlots presenter
- Clicking on a plot brings up a reference side-by-side
- Drag & drop to add new reference, or select a different reference from panel of choices
- Suggested: tag references with run from which they're made, and timestamp (already includes a comment)
- Deleting references is simple, but not so simple as to be done accidentally
- Mild concerns to be wary of reference bloat and organization as things evolve at the experiment (including collision species/energies change)
- PDFs generated and uploaded to RunLog DB for each Set
- Include table of contents
- Concerns of space this will consume on the onldb server and redundancy of plots
- Run 10 PDFs used more than half the available disk space, and it is reasonable to expect a doubling (or more) of the required space for Run 11
- Wayne & Dmitry will assess the current storage on onldb [post-meeting statement that space may be fine; follow up next week]
- Requirements still need to be more accurately defined
- Will depend on what gets axed/kept from review by subsystems & trigger board
- Would be helped by real data, but that's a bit late
Next week: demo of Offline QA for AutoQA with reference histograms [Gene]
TOF vs TPC PID in BES fluctuations
Updated on Fri, 2010-12-10 11:43. Originally created by geurts on 2010-12-10 10:59.Reference
Speaker : Hui Wang / Terry Tarnoswky
Talk time : 10:20, Duration : 00:20
Slides from BES meetings:
http://drupal.star.bnl.gov/STAR/system/files/STAR_Collab_Meeting_Nov_2010.pdf
TOF PID study
Updated on Fri, 2010-12-10 10:58. Originally created by geurts on 2010-12-10 10:58.Reference
Speaker : Masa Wada
Talk time : 10:00, Duration : 00:20
See http://drupal.star.bnl.gov/STAR/blog/masayuki/2010/dec/08/tof-time-resolution-model
http://www.star.bnl.gov/protected/lfspectra/yfzhang/hft/upgr15/cd2/QA/
Updated on Fri, 2010-12-10 10:58. Originally created by margetis on 2010-12-10 10:58.QA of the new Ds production
Updated on Thu, 2010-12-09 18:21. Originally created by rexwg on 2010-12-09 18:21.HFT Software
Updated on Thu, 2010-12-09 12:10. Originally created by margetis on 2010-12-09 12:09.510-4867333, at 18:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
14:30 | QA of the new Ds production ( 00:20 ) 1 file | Gang Wang |
14:50 | http://www.star.bnl.gov/protected/lfspectra/yfzhang/hft/upgr15/cd2/QA/ ( 00:20 ) 0 files | Yifei Ds QA |
AOB
Updated on Wed, 2010-12-08 12:04. Originally created by jeromel on 2010-12-08 10:46.Speaker : All ( All )
Talk time : 12:35, Duration : 00:20
Production status
Updated on Wed, 2010-12-08 11:47 by didenko. Originally created by jeromel on 2010-12-08 10:37.Speaker : Lidia Didenko ( BNL )
Talk time : 12:20, Duration : 00:15
Production Sta
Summary of the h+/h- meeting
Updated on Wed, 2010-12-08 12:08. Originally created by jeromel on 2010-12-08 10:36.Speaker : Grant Webb ( UKY )
Talk time : 12:00, Duration : 00:20
See You do not have access to view this node
Software and Computing phone meeting
1-189, EVO, at 17:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Summary of the h+/h- meeting ( 00:20 ) 0 files | Grant Webb (UKY) |
12:20 | Production status ( 00:15 ) 0 files | Lidia Didenko (BNL) |
12:35 | AOB ( 00:20 ) 0 files | All (All) |