LINKS TO NON-BLOG CONTENT
Updated on Thu, 2021-03-11 16:01. Originally created by genevb on 2016-11-01 12:17.2021-03-08: You do not have access to view this node (STAR Collaboration Meeting)
2021-02-26: Padrow 13 and Padrow 40 static distortions (TPC Documentation)
2021-02-03: You do not have access to view this node (S&C Meeting)
K*0 meson directed flow in Au + Au Collisions at 3, 4.5 and 7.7 GeV
Updated on Tue, 2025-06-10 09:35. Originally created by gyz on 2025-06-10 09:35.
Kaon HBT FXT 2nd GPC meeting slides
Updated on Tue, 2025-06-10 05:18. Originally created by lazhang on 2025-06-10 05:18.
D0-jets Prague-Yale conference contribution
Updated on Tue, 2025-06-10 02:06. Originally created by lomicond on 2025-06-10 01:51.
EPD Bias Scan - Commissioning 2025
Updated on Tue, 2025-06-10 01:27. Originally created by lisa on 2025-06-10 01:27. Bias scan - done 9-10 june 2025
This is the standard bias voltage scan, intended to put all the MIP peaks at the same location in ADC.
This is the standard bias voltage scan, intended to put all the MIP peaks at the same location in ADC.
Yale-CTU Workshop Presentation: Searching for the Dead Cone Effect in D0-Reconstructed Jet Energy Correlators
Updated on Tue, 2025-06-10 00:53. Originally created by rjh78 on 2025-06-09 16:22.Submission for the Heavy Flavor session of the 2025 Yale-CTU STAR Workshop in Prague.
Yale-CTU STAR Workshop Presentation: Searching for the Dead Cone Effect in D0-Reconstructed Jet Energy Correlators
Updated on Mon, 2025-06-09 16:18. Originally created by rjh78 on 2025-06-09 16:18.Slides for presentation in the heavy flavor session (Day 2) of the Yale - CTU STAR workshop
EPD Timing Scan - Comissioning 2025
Updated on Mon, 2025-06-09 16:34. Originally created by lisa on 2025-06-09 12:29. 9 June 2025 - EPD Timing Scan
CTU YALE workshop - jet substructure
Updated on Mon, 2025-06-09 03:22. Originally created by robotmon on 2025-06-09 03:19.
Andrew's slides
Updated on Mon, 2025-06-09 01:17. Originally created by epottebaum on 2025-06-09 01:17.Jet Physics with the Star Forward Upgrade (survey of the Lund plane - CTU-Yale workshop)
Updated on Mon, 2025-06-09 01:08. Originally created by epottebaum on 2025-06-09 01:08.Preparation for EPD commissioning
Updated on Sun, 2025-06-08 10:26. Originally created by mstefaniak on 2025-06-08 10:26.We have to do three test. Here you can find the short instructions for the EPD commissioning 2025:
I) Timing Scan:
FST Meeting on 06/09/2025
Updated on Sat, 2025-06-07 21:08. Originally created by sunxuhit on 2025-06-07 21:08.update on the search for muonic atoms at STAR
Updated on Mon, 2025-06-09 07:51 by xwang1. Originally created by xgn1992 on 2025-06-07 04:55.7 pattern test - final check June6th 2025
Updated on Fri, 2025-06-06 16:33. Originally created by mstefaniak on 2025-06-06 16:33.Summary:
We have 2 dead tiles: WPP6TT1 (EQ3 Bd4 ch13) and WPP6TT1 (EQ2 Bd8 ch15)
One tile which responded with very wide pedestal (+neighboring channels) W PP6TT19 (EQ4 Bd10 ch27)
BESII_Jpsi_Analysis_note
Updated on Fri, 2025-06-06 10:29. Originally created by weizhang on 2025-06-06 10:29.
paper_draft_BESII_Jpsi_v1
Updated on Fri, 2025-06-06 10:19. Originally created by weizhang on 2025-06-06 10:19.
Run by Run QA for Au+Au 3 GeV (P24iy/SL24y)
Updated on Fri, 2025-06-06 10:13. Originally created by sharangrav on 2025-06-06 10:13.
Preliminary figure request of Coulomb dissociation cross-section of STAR Isobar and their ratio
Updated on Thu, 2025-06-05 09:24. Originally created by hudanasrulloh on 2025-06-05 09:21.This is a personal request for the preliminary results of the figures from my analysis on Coulomb dissociation measurements.