RHICBOS AL prediction for Transverse Mass

RHICBOS AL prediction for Transverse Mass

Time Dependency in BEMC Gains, Piecewise Linear Fit by Day

We are continuing to refine our characterizations of the time-dependence for BEMC gains.

Problems with applying TPC alignment

I ran a test (in SL09e) where I made the alignment of one sector grossly wrong.

Very Preliminary Run6 FPD AN with cuts

The following plots all show RAW cross ratio without polarization corrections.

Run6 FPD Fiducial cut

For all previous FPD analysis, fiducial volume cut of 0.5cell width has been used.

evaluation of TpcRS (new TPX slow simu)

A)----- Au+Au events @  sqrt(s)=200 GeV, no pileup simulation

Events samples were generated by Wei-Ming using: sqrt(s)=200 GeV, Relativistic Quantum Molecular Dynami

TCFIT eval.

  • code : starsim kumac and bfc reconstruction chain 

FMS meeting 11/02/2009

File attached

MoreEtaAnalysis

 New Analysis of Run 6 Eta Signal

STAR Management Meeting

2009-11-05 11:00
2009-11-05 12:00
Etc/GMT-5
Thursday, 5 November 2009
BNL, 50-Orange Room, at 16:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) Run10 preparation and TOF problem(?) - Bill

2) FGT instalations - Flemming, Bernd

3) ISMD Proceedings - Nu

4) TBD

* --====================================================================--*

               Brief Summary:

  0) Attendency:

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.

   4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report

              

               Future Meetings:

    1) STAR-DoE HFT CD-1 review, postpond to Nov. 12-13, BNL.

        The rehearsal is scheduled on Thursday and Friday, Oct. 29 and 30th.

    2) STAR Analysis Meeting, Jan. 11-15, 2010, UT Austin

    3) APS April meeting, Feb. 13-17, 2010, Washongton DC.

Correction for photon conversions in d+Au 2003 and p+p 2005 pi0 analysis

1. Photon conversions

Twist correction notes, pp2009 (FF)

 Data for the FullField twist correction was provided by Gene over the weekend:

 

 

HFT management

Speaker : Videbaek


Talk time : 15:15, Duration : 00:20

2005 BEMC status tables

I did a scan over all runs in my runlist to check the BEMC status tables over time.

2008 Junior survey: service work

Below is a list of polls we have assembled for YOU juniors to express YOUR opinions on service tasks in STAR.

STAR Junior Internal Documents

This page will hold the STAR junior internal documents.

List of STAR Juniors

Graduate Student Theses

Follow a link to see a list of STAR theses