EEMC simulation studies

EEMC simulation studies

Energy and pseudorapidity dependence of sampling fraction in the EEMC

Figure 1 -- Sampling fraction vs. incident energy for an electron normally incident on the EEMC.  The fit is to a 3rd degree polynomial in x=log(E).

Spin Physics PWG meeting

2009-07-30 12:00
Etc/GMT-4
Thursday, 30 July 2009
phone 877-674-0006 1 077795# 1, at 16:00 (GMT), duration : 00:00

  Agenda may be found here

2005 Dijet Cross Section Figure

Attached to this post is a copy of the 2005 Dijet Cross Section Figure. The systematic analysis is not quite complete, but this figure shows approximately what it will look like.

Radiation Plans for FY10

Speaker : Howard M.


Talk time : 12:40, Duration : 00:20

Radiation in STAR

Speaker : Hannah/Howard M.


Talk time : 12:20, Duration : 00:20

Pixel Telescope

Speaker : Leo


Talk time : 12:00, Duration : 00:20

Phase I Testing

Speaker : Michal


Talk time : 11:40, Duration : 00:20

SSD


Talk time : 11:20, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 11:00, Duration : 00:20

Pixel Electrical

Speaker : Leo


Talk time : 10:40, Duration : 00:20

Pixel Mechanical

Speaker : Howard W.


Talk time : 10:20, Duration : 00:20

News

Speaker : Flemming


Talk time : 10:00, Duration : 00:20

FGT thermal model

I've just completed the first set of thermal model measurements, which have included two new channels:  temperature measurements of the input and exhaust.

STAR Management Meeting

2009-07-30 11:00
2009-07-30 12:00
Etc/GMT-7
Thursday, 30 July 2009
BNL, I-189 Conference room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 1154177 // Password: 0952

   Time:  11am - 12noon EDT

 * --===================================================================--*

  Agenda:

    1)    Status: QM09 proceedings - Bedanga
    2)    RHIC S&T Review: more on upgrade management -  Nu

    3)    AOB

* --====================================================================--*

               Brief Summary:

  0) Attendency: Bill, Jerome, Flemming, Jamie, Bedanga, Nu

  1) Upgrade management: watching more closely on costs and schedule, meet DoE's.

  2) Manpower/recourse for TPC: working in progress. Will need more effort to cover Run10.

  3) Run10 preparation: Expect shift starts 2nd week of Dec. 2009. Olga will send a message to the council for author list of each institute.

  4) QM09 proceedings: the organizers will be contacted to discuss the late submission of the two STAR jet-reconstruction proceegings.

  5) No management meetings next two weeks. The next regular meeting will be on Aug. 20th.  

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) FMS Review, P. Jacobs (chair)

  Future Meetings:

    1) STAR-DoE ToF Review, Aug. 10-11, BNL

    2) STAR FMS Review, Sept. 1-2, BNL

    3) STAR-DoE HFT CD-1 review, Sept. 10-11 or 14-15, BNL

    4) STAR Regional meeting: Sept. 25-26, Rio, Brazil

    5) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil

    6) STAR Collaboration meeting, Oct. 5-10, Berkeley

    7) DNP 2009, Oct. 13 - 17, Waikoloa

Polarizations for each fill

July 24 Comparison of C Means Weights

I ran a quick comparison study of C means weighting methods. I changed the weighting from being (|Dist|2+.1) to (|Dist|3+.1).

Debugging...

 

T0 Calibration Update