Strangeness production in p+p 62 GeV
Updated on Tue, 2011-11-15 12:10 by gmagela. Originally created by tone421 on 2011-10-25 22:38.Reference
Speaker : Geraldo Vasconcelos
Talk time : 10:45, Duration : 00:30
Particle ratios in p+p 62 GeV
Updated on Wed, 2011-11-02 11:57. Originally created by tone421 on 2011-10-25 22:36.Reference
Speaker : Shikshit Gupta
Talk time : 09:45, Duration : 00:30
Paper progress for di-electrons in p+p 200 GeV
Updated on Tue, 2011-11-15 11:07 by huangbc. Originally created by tone421 on 2011-10-25 22:31.Reference
Speaker : Bingchu Huang
Talk time : 09:00, Duration : 00:15
Lfspectra parallel session
Updated on Fri, 2011-11-11 16:11. Originally created by tone421 on 2011-10-25 22:29.Time | Talk | Presenter |
---|---|---|
09:00 | Paper progress for di-electrons in p+p 200 GeV ( 00:15 ) 1 file | Bingchu Huang |
09:15 | Hypertriton low energy Au+Au ( 00:30 ) 0 files | Yuhui Zhu |
09:45 | Particle ratios in p+p 62 GeV ( 00:30 ) 0 files | Shikshit Gupta |
10:15 | Coffee break ( 00:30 ) | |
10:45 | Strangeness production in p+p 62 GeV ( 00:30 ) 1 file | Geraldo Vasconcelos |
11:15 | Run XI Offline dEdx Calibration and TOF seeds for HLT Tracker ( 00:30 ) 1 file | Yi Guo |
11:45 | Lunch break ( 01:45 ) | |
13:30 | di electrons with different triggers in Au+Au 200 GeV ( 00:30 ) 1 file | Kurt Jung |
14:00 | Phi -> e^{+} + e{-} in Au+Au 200 GeV ( 00:30 ) 1 file | Masa Wada |
14:30 | Di-electron production in Au+Au 200 GeV ( 00:30 ) 2 files | Jie Zhao |
15:00 | Di-electron production in Au+Au 39 GeV ( 00:30 ) 1 file | Patrick Huck |
15:30 | Coffee break ( 00:30 ) | |
16:00 | K* in Au+Au 200 GeV ( 00:30 ) 1 file | Chi Yang |
16:30 | di-lepton v2 in Au+Au 200 GeV ( 00:30 ) 1 file | Xiangli Cui |
Multi strange particle production in the BES
Updated on Thu, 2011-11-17 12:06 by fengzhao. Originally created by tone421 on 2011-10-25 22:23.Reference
Speaker : Feng Zhao
Talk time : 09:25, Duration : 00:25
Phi production and v2 in the BES
Updated on Thu, 2011-11-17 09:20 by xpzhang. Originally created by tone421 on 2011-10-25 22:19.Reference
Speaker : Xiaoping Zhang
Talk time : 09:00, Duration : 00:25
Particle ratios and spectra in Au+Au 19 GeV
Updated on Thu, 2011-11-17 13:10 by sgbrovko. Originally created by tone421 on 2011-10-25 22:13.Reference
Speaker : Samantha Brovko
Talk time : 10:55, Duration : 00:25
Freeze out conditions in Cu+Cu 22 GeV and Au+Au 19 GeV
Updated on Thu, 2011-11-17 12:45 by omall. Originally created by tone421 on 2011-10-25 22:09.Reference
Speaker : Orpheus Mall
Talk time : 10:30, Duration : 00:25
Beam Energy Scan: Joint lfspectra and bulkcorr session
Updated on Fri, 2011-11-11 14:00. Originally created by tone421 on 2011-10-25 22:07.Time | Talk | Presenter |
---|---|---|
09:00 | Phi production and v2 in the BES ( 00:25 ) 1 file | Xiaoping Zhang |
09:25 | Multi strange particle production in the BES ( 00:25 ) 1 file | Feng Zhao |
09:50 | Phi Meson V2 (Evo) ( 00:25 ) 1 file | Md. Nasim |
10:15 | Coffee break ( 00:15 ) | |
10:30 | Freeze out conditions in Cu+Cu 22 GeV and Au+Au 19 GeV ( 00:25 ) 1 file | Orpheus Mall |
10:55 | Particle ratios and spectra in Au+Au 19 GeV ( 00:25 ) 1 file | Samantha Brovko |
11:20 | Proton and anti-proton v2: centrality and energy dependence ( 00:25 ) 1 file | Hiroshi Masui (For Alexander Schmah) (LBNL) |
Naive alignment considerations
Reference
Speaker : Igor Alekseev ( ITEP )
Talk time : 11:00, Duration : 00:05
A very naive model of different misalignment effects is presented.
Associating mcTracks with reconstructed points in the EEMC
In any resolution or efficiency determination, one must have some method for associating which mcTrack corresponds to which reconstructed point. I feel the method which has been previously used for the EEMC (used by both Alice and Weihong) has some problems, and I suggest the following solution.
Tester results and questions
Updated on Tue, 2011-10-25 12:12. Originally created by genevb on 2011-10-25 12:12.Logistic forward: review material preparation -- AgML
Updated on Tue, 2011-10-25 13:39 by jwebb. Originally created by genevb on 2011-10-25 12:10.Reference
Speaker : Jason ( BNL )
Talk time : 15:40, Duration : 00:20
Pulling together AgML documentation here
Track-by-track evaluations -- Status
Updated on Tue, 2011-10-25 12:09. Originally created by genevb on 2011-10-25 12:09.Review of the production samples readiness
Updated on Tue, 2011-10-25 12:09. Originally created by genevb on 2011-10-25 12:08.Reference
Speaker : Lidia Didenko ( BNL )
Talk time : 15:10, Duration : 00:10
Review of past action items
Updated on Tue, 2011-10-25 12:07. Originally created by genevb on 2011-10-25 12:07.Run 9 200GeV Track Correction Investigation Presentation
Track correction presentation to the jet group (10/25/11)