HFT Software

2011-11-04 13:30
2011-11-04 14:30
America/New York
Friday, 4 November 2011
510-4867333, at 17:30 (GMT), duration : 01:00


1) I made a short presentation at the S&C meeting yesterday:
http://drupal.star.bnl.gov/STAR/event/2011/11/02/software-and-computing-meeting/hft-software-status

2) Jonathan made progress on TPC+PXL tracking.

3) I got an email form Howard that the touch probe for the
  VIEW-3000 will ship Nov 11. There is no arrival date but
  we might be able to do something with it at the Collab.
  meeting. If not we will still learn about data formats
  etc of this device.

 

TimeTalkPresenter
12:30[very] preliminary look at the pixel patch efficiency ( 00:10 ) 2 filesjonathan

HFT Software

2011-10-28 13:30
2011-10-28 14:30
America/New York
Friday, 28 October 2011
510-4867333, at 17:30 (GMT), duration : 01:00

1) Geometry. Flemming produced a proportional sketch of the
   support structures. Posted it on Drupal's page.
2) Prototype tracking. Jonathan is getting close. He might
   post a couple of plots by the meeting's time.
3) PXL response. We got the DIGMAP code and some docs. What
   next?
4) The CERN beam test is successfully over. I put a picture
   he sent on Drupal

 

TimeTalkPresenter
12:30Geometry ( 00:20 ) 1 file
12:50prototype tracking ( 00:20 ) 1 file
13:10Minutes ( 00:20 ) 1 file

HFT Software

2011-10-21 13:30
2011-10-21 14:30
America/New York
Friday, 21 October 2011
510-4867333, at 17:30 (GMT), duration : 01:00

1) I updated the TPC-PXL sector overlap picture to reflect
   the true TPC arrangement, as per Xin's correction. I
   put the new picture in the meeting's Drupal page.
2) Flemming drafted a MS-Project schedule diagram for software
   and associated Milestones. I will at this in detail over
   the weekend.   
3) Flemming is preparing some drawings of the detector complex
   for the non-initiated folks, like me.
4) Jonathan is looking into tracking efficiency/ghosting with the
   prototype only. He has problems with every option he tries
   for the moment (some of them just resolved). There is going
   to be more discussion in this list about this stuff. It
   has been a while since we used this production chains and
   things got rusted.
5) I have asked for CMM time during the Collab. meeting since
   we are going to be there anyway.
6) I 've contacted Auguste about the slow simulator.
7) Jerome contacted me about updates. We are on in next week's
   S&C Wed meeting and also during the Friday morning plenary
   session at the Collab. meeting.

 

TimeTalkPresenter
13:30Geometry ( 00:05 ) 2 files
13:35Minutes ( 00:20 ) 0 files

HFT Software

2011-10-14 13:30
2011-10-14 14:30
America/New York
Friday, 14 October 2011
510-4867333, at 17:30 (GMT), duration : 01:00

1) I know that Jonathan re-run the prototype
efficiency (acceptance) for  pt>0.3
(which is to make sure we have a reasonable
track reconstr.in the TPC). He is going to post

his file soon.

2) We are looking into optimizing the TPC+3sector PXL
   configuration. TPC has 12 sectors the PXL 3 out of 10.

We need to take care of the gaps (put the 3sectors)
   so we have only one TPC gap shadowing, and also make
   sure we have healthy TPC sectors. He has some drawings
   and there is work in progress here (use TPC state in last
   run as a basis).

3) He is making a list of volumes in Y2013 'blank' geometry.
   We are waiting for a drawing to be available for that
   year's support material but Flemming/Jim are big helpers
   in this (thanks guys). Jonathan is playing with this
   geometry.

4) There is some progress in reprocessing the old, Yifei's
   files with BFC and mask out IST/SSD hits (no material)
   plus PXL sector (hits). Later I will coordiante with
   Yifei to start a production with Hijing+D0s in Y2013a,b
   (a=Mercedes, b=All adjacent) with proper material, for
   accurate tracking excercises.

5) I posted a WBS Software schedule Flemming prepared. I
   still need to talk to him so I can understand the notation.

Send the list the items yoiu might have. S.

 

TimeTalkPresenter
12:30Minutes ( 00:20 ) 1 file
13:00WBS ( 00:10 ) 1 file
13:20Geometry acceptance update ( 00:10 ) 3 filesjonathan

HFT Software

2011-10-07 13:30
2011-10-07 14:30
America/New York
Friday, 7 October 2011
510-4867333, at 17:30 (GMT), duration : 01:00

1) HFT Geometry update. There several things going on.

   The highest priority item is to build a y2013 geometry
   for the prototype run. This needs the beam pipe, the
   support cones and the 3-sector PXL model. I asked
   Jonathan to be the liaison with the BNL group.

   The SSD ladders in geant have very nice detail (thanks
   Gerrit for remind me of that). Minor work on the ladder
   would be needed plus the re-mounting in the smaller
   radius.

   Some documents I posted on the meeting's page, Jonathan
   is going to also post snapshots of UPGR13 and UPGR15
   (current) geometry.

   I will created on the subsystem pages on Drupal directories
   (repositories) for Geometry information/drawing, Survey
   documents (eg fiducial mark position drawings etc) etc.

2) We started work on updating the prototype efficiency/
   acceptance of D0s to current sector specs. Some
   older calculations done by us and Howard Wieman are
   posted. This stuff is going to be the basis for a
   presentation to the HF group with the question of
   'What physics can we get out of the HFT prototype?'
   provided a lengthy/healthy run and also that
   tracking with TPC/PXL only is marginally o.k. (TBD)

3) I would like to start the discussion (Purdue needed)
   on what is next in implementing a Fast/slow sim in STAR.

 

TimeTalkPresenter
13:30Geometry Update/Prototype acceptance/efficiency ( 00:15 ) 9 filesAll
13:45geometry dev13 ( 00:20 ) 1 filejonathan
14:05Minutes ( 00:20 ) 1 file

Topic 1

Speaker : TBC


Talk time : 10:00, Duration : 00:20

LFS meeting

2011-10-07 10:00
2011-10-07 11:30
America/New York
Friday, 7 October 2011
EVO, at 14:00 (GMT), duration : 01:30
TimeTalkPresenter
10:00Topic 1 ( 00:20 ) 0 filesTBC

Update on Cosmic QA

Speaker : Stephen Gliske


Talk time : 11:05, Duration : 00:20

Brief update.  Includes raw QA plots and covariances/correlations for a run taken on Sept 26th with FGTs 10, 11 and 13

Resources/Timelines

Speaker : All


Talk time : 14:00, Duration : 00:20

Slow Simul. tool for MAPS

Speaker : Auguste/Wei/All


Talk time : 09:00, Duration : 00:30

Survey Tasks

Speaker : Spiros/All


Talk time : 11:40, Duration : 00:20

Evaluation/Analysis Structures

Speaker : Jonathan/Spiros/All


Talk time : 11:20, Duration : 00:20

Geometry Update

Speaker : Spiros/Jason/All


Talk time : 11:00, Duration : 00:20

Minutes

Speaker : Anselm


Talk time : 11:20, Duration : 00:20

crashes on LOG_DEBUG, LOG_WARN
Ticket filing for log_debug
steve provides mapping drawing

fgteventdisplay update docu, compile with cons

10.30 Wednesday Round table discussion on issues, organization prorities


Talk time : 21:00, Duration : 00:20

10.00 Wednesday Software

Speaker : Spiros margetis


Talk time : 20:40, Duration : 00:20

9.30 Wednesday - SSD electronics

Speaker : Micheal LeVine


Talk time : 20:20, Duration : 00:20

9.00 Wednesday - SSD overview

Speaker : Jim Thomas


Talk time : 20:00, Duration : 00:20

Sub meetings


Talk time : 15:00, Duration : 02:01

 smaller group meetings as needed:

-- integration - star ops

-- budgeting Sarah, Flemming, Bob Ernst

CF fabrication for PXL, IST and Global Structures

Speaker : Eric Andersen


Talk time : 14:30, Duration : 00:20