Some Additional band in dEdx vs p distribution in AuAu 200 RFF
I see some additional band in dEdx vs p distribution in AuAu 200 RFF(the left down corner).
Geometry Update/Prototype acceptance/efficiency
Updated on Sun, 2011-10-09 12:25 by bouchet. Originally created by margetis on 2011-10-05 13:22.jan - DB layout , charge sharing
Updated on Wed, 2011-10-05 09:53. Originally created by balewski on 2011-10-05 09:12.Reference
Talk time : 10:00, Duration : 00:20
AOB
Updated on Wed, 2011-10-05 10:58. Originally created by jeromel on 2011-10-05 08:48.Speaker : All ( All )
Talk time : 12:40, Duration : 00:20
- SUMS: The Action element
- ...
TpcRS updates, improvements on dE/dx
Updated on Wed, 2011-10-05 11:28. Originally created by jeromel on 2011-10-05 08:48.Speaker : Yuri Fisyak ( BNL )
Talk time : 12:20, Duration : 00:20
See You do not have access to view this node for more information.
Calibration updates, Run 11 and looking forward
Updated on Wed, 2011-10-05 09:31 by gdwebb. Originally created by jeromel on 2011-10-05 08:44.Speaker : Grant Webb ( UKY )
Talk time : 12:00, Duration : 00:20
Software and Computing Meeting
1-189, EVO, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Calibration updates, Run 11 and looking forward ( 00:20 ) 2 files | Grant Webb (UKY) |
12:20 | TpcRS updates, improvements on dE/dx ( 00:20 ) 0 files | Yuri Fisyak (BNL) |
12:40 | AOB ( 00:20 ) 1 file | All (All) |
End game
Updated on Tue, 2011-10-04 15:53. Originally created by wlodek on 2011-10-04 15:53.Fiducial cuts revisited ...
Updated on Wed, 2011-10-05 08:51 by yipkin. Originally created by jhlee on 2011-10-04 14:18.Final re-alignment...
Updated on Tue, 2011-10-04 14:17. Originally created by jhlee on 2011-10-04 14:17.HFT Software
Updated on Thu, 2011-10-20 11:06. Originally created by margetis on 2011-10-04 09:19.510-4867333, at 17:30 (GMT), duration : 01:00
1) I updated the TPC-PXL sector overlap picture to reflect
the true TPC arrangement, as per Xin's correction. I
put the new picture in the meeting's Drupal page.
2) Flemming drafted a MS-Project schedule diagram for software
and associated Milestones. I will at this in detail over
the weekend.
3) Flemming is preparing some drawings of the detector complex
for the non-initiated folks, like me.
4) Jonathan is looking into tracking efficiency/ghosting with the
prototype only. He has problems with every option he tries
for the moment (some of them just resolved). There is going
to be more discussion in this list about this stuff. It
has been a while since we used this production chains and
things got rusted.
5) I have asked for CMM time during the Collab. meeting since
we are going to be there anyway.
6) I 've contacted Auguste about the slow simulator.
7) Jerome contacted me about updates. We are on in next week's
S&C Wed meeting and also during the Friday morning plenary
session at the Collab. meeting.
Time | Talk | Presenter |
---|---|---|
13:30 | Geometry ( 00:05 ) 2 files | |
13:35 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2011-11-04 12:30. Originally created by margetis on 2011-10-04 09:19.510-4867333, at 17:30 (GMT), duration : 01:00
1) I made a short presentation at the S&C meeting yesterday:
http://drupal.star.bnl.gov/STAR/event/2011/11/02/software-and-computing-meeting/hft-software-status
2) Jonathan made progress on TPC+PXL tracking.
3) I got an email form Howard that the touch probe for the
VIEW-3000 will ship Nov 11. There is no arrival date but
we might be able to do something with it at the Collab.
meeting. If not we will still learn about data formats
etc of this device.
Time | Talk | Presenter |
---|---|---|
12:30 | [very] preliminary look at the pixel patch efficiency ( 00:10 ) 2 files | jonathan |
HFT Software
Updated on Fri, 2011-10-28 09:05. Originally created by margetis on 2011-10-04 09:19.510-4867333, at 17:30 (GMT), duration : 01:00
1) Geometry. Flemming produced a proportional sketch of the
support structures. Posted it on Drupal's page.
2) Prototype tracking. Jonathan is getting close. He might
post a couple of plots by the meeting's time.
3) PXL response. We got the DIGMAP code and some docs. What
next?
4) The CERN beam test is successfully over. I put a picture
he sent on Drupal
Time | Talk | Presenter |
---|---|---|
12:30 | Geometry ( 00:20 ) 1 file | |
12:50 | prototype tracking ( 00:20 ) 1 file | |
13:10 | Minutes ( 00:20 ) 1 file |