FTPC embedding - review of the problem

Speaker : Renee Fatemi ( UKY )


Talk time : 12:20, Duration : 00:15

You do not have access to view this node

 

VMC/Stv progress

Speaker : Victor Perevoztchikov ( BNL )


Talk time : 12:00, Duration : 00:20

Software and Computing Meeting

2011-06-22 12:00
2011-06-22 13:00
America/New York
Wednesday, 22 June 2011
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00VMC/Stv progress ( 00:20 ) 1 fileVictor Perevoztchikov (BNL)
12:20FTPC embedding - review of the problem ( 00:15 ) 0 filesRenee Fatemi (UKY)
12:35Embedding issue in Run8 data ( 00:15 ) 0 filesChristopher Powell (LBNL)
12:50AOB ( 00:10 ) 0 filesAll (All)

2009 Inclusive jet in pp200

Request TypeSimulated background embedding (generator with real data as background for noise / pile-up studies)
Description

This embedding request is for PYTHIA events, with trigger filtering applied and embedded into zerobias events from run 2009 FF+RF pp data. The request is summaried in the following pdf:

http://cyclotron.tamu.edu/pibero/jets/2011.06.02/

The summary for partonic pt and total events is:

3-4  5500K

4-5 3430K

5-7 1592K

7-9 1260K

9-11 829K

11-15 420K

15-25 297K

25-35 200K

>35  60K

General Information
Request ID20112401
Priority: EC0
Priority: pwgNormal
StatusNew
Physics Working GroupSpin
Requested bypibero
Contact email(s)rfatemi@pa.uky.edu, pibero@tamu.edu
Contact phone(s)
PWG email(s)starspin-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Simulated background embedding (generator with real data as background for noise / pile-up studies)
Number of events12000000 = 12 M
Magnetic Field---- SELECT MAGFIELD ----
Collision Typepp 200GeV
Centrality---- SELECT CENTRALITY ----
BFC tagsDbV20100301, pp2009c, ITTF, VFPPVnoCTB, beamLine, BEmcChkStat, btof, fmsdat, Corr4, OSpaceZ2, OGridLeak3D
ProductionP10ic
Geometry: simuy2009c
Geometry: recoy2009a
LibrarySL10c
Vertex optionLeave vertex to be reconstructed vertex, and use VFPPVnoCTB with beamline
Pileup optionNo
Detector SetTPC,EEMC,BEMC
Data Sources
Real Data
File lookup list of .daq files is at: /star/u/pibero/embedding/jet/st_zerobias_daq.list >> The FileCatalog query to retrieve the list is: >> >> get_file_list.pl -distinct -keys 'path,filename' -delim / -cond >> 'trgsetupname=production2009_200Gev_Single,filetype=online_daq,filename~st_zerobias_adc,storage=hpss' >> -limit 0
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

Other

Speaker : All


Talk time : 13:20, Duration : 00:20

Plans with MADX

Speaker : Janusz


Talk time : 13:00, Duration : 00:20

Results with new trasport

Speaker : Kin


Talk time : 12:30, Duration : 00:30

Alignment with new trasnport

Speaker : Igor


Talk time : 12:00, Duration : 00:30

TOF meeting

2011-07-08 11:00
2011-07-08 12:00
America/New York
Friday, 8 July 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

TOF meeting

2011-07-15 11:00
2011-07-15 12:00
America/New York
Friday, 15 July 2011
EVO, at 15:00 (GMT), duration : 01:00

TOF meeting

2011-07-22 11:00
2011-07-22 12:00
America/New York
Friday, 22 July 2011
EVO, at 15:00 (GMT), duration : 01:00

TOF meeting

2011-07-29 11:00
2011-07-29 12:00
America/New York
Friday, 29 July 2011
EVO, at 15:00 (GMT), duration : 01:00

TOF meeting

2011-08-05 11:00
2011-08-05 12:00
America/New York
Friday, 5 August 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda

 

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

TOF meeting

2011-08-12 11:00
2011-08-12 12:00
America/New York
Friday, 12 August 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda

* Status at BNL

* Calibration status

* Offline status

* AOB

 

EVO:

 look for TOF meeting in EVO STAR Community

phone bridges: 631 344 6100 (BNL) and 626 395 2112

meeting ID: 10 5828

TOF meeting

2011-06-17 11:00
2011-06-17 12:00
America/New York
Friday, 17 June 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda: 

 

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

TOF meeting

2011-06-24 11:00
2011-06-24 12:00
America/New York
Friday, 24 June 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda: 

 

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

TOF meeting

2011-07-01 11:00
2011-07-01 12:00
America/New York
Friday, 1 July 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda: 

 

 Agenda

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

TOF meeting

2011-06-10 11:00
2011-06-10 12:00
America/New York
Friday, 10 June 2011
EVO, at 15:00 (GMT), duration : 01:00

 Agenda: 

  • Status at BNL
  • Calibration status
  • Offline status
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 87098

HFT physics connection

Speaker : N.Xu


Talk time : 10:50, Duration : 00:10

Cost and Schedule

Speaker : S.Morgan


Talk time : 13:35, Duration : 00:20