pp2pp analysis
1-189 Physics, at 14:00 (GMT), duration : 02:00
pp2pp analysis
1-189 Physics, at 14:00 (GMT), duration : 02:00
Time | Talk | Presenter |
---|---|---|
10:00 | Updates on field strength and more... ( 00:30 ) 1 file | Phil |
10:30 | Crossing angle effect ( 00:20 ) 1 file | Wlodek |
10:50 | Estimating overall systematic uncertainties ( 00:20 ) 1 file | JH |
11:10 | Updates ( 00:20 ) 1 file | Kin Yip |
pp2pp analysis
1-189 Physics, at 14:00 (GMT), duration : 02:00
Minutes
Updated on Fri, 2011-09-09 13:14. Originally created by margetis on 2011-09-09 13:14.Reference
Talk time : 12:35, Duration : 00:20
rho meson embedded in zerobias data UPC studies
Updated on Mon, 2012-06-18 17:06 by tjt. Originally created by ramdebbe on 2011-09-09 11:48.print out of minimc file
Updated on Thu, 2011-09-08 13:50. Originally created by bouchet on 2011-09-08 13:43.Reference
Speaker : jonathan
Talk time : 12:30, Duration : 00:05
- generalities about minimc files : here
HFT Software
Updated on Wed, 2011-09-07 11:49. Originally created by margetis on 2011-09-07 11:49.510-4867333, at 17:30 (GMT), duration : 00:00
* Software-day is September-26 @ BNL
* Preparation work for the Software meeting
* AOB
Time | Talk | Presenter |
---|---|---|
12:30 | print out of minimc file ( 00:05 ) 4 files | jonathan |
12:35 | Minutes ( 00:20 ) 1 file |
Turtle-Data Yellow DRAFT
Updated on Wed, 2011-09-07 09:01. Originally created by pile on 2011-09-07 09:01.pp2pp special
1-189, at 14:00 (GMT), duration : 02:00
1. Explanation and discussion of Igor's alignment - Igor + all
Description:
Community: STAR
Password: pp2ppweekly
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MMMeMn2v2aDIDs9D98D29M
- Password: pp2ppweekly
- Phone Bridge
ID: 397 0344
Password: 3964
Start 2011-09-07 10:00
End 2011-09-07 12:00
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | Turtle-Data Yellow DRAFT ( 00:20 ) 1 file | Phil Pile |
Summer 2011 BNL local group presentations #10: FMS-EEMC azimuthal correlations in pp and dAu
Updated on Thu, 2011-09-15 08:55. Originally created by jeromel on 2011-09-02 15:08.2-160, at 19:00 (GMT), duration : 01:00
Presenter: Xuan Li, Shandong University
Summer 2011 BNL local group presentations #9, Measurement of J/psi Elliptic Flow @ STAR
Updated on Fri, 2011-09-02 15:02. Originally created by jeromel on 2011-09-02 14:59.2-160, at 19:00 (GMT), duration : 01:00
Presenter: Hao Qiu, Institute of Modern Physics
slides for 4) Evaluation scheme.
Updated on Fri, 2011-09-02 09:58. Originally created by bouchet on 2011-09-02 09:58.Tracking Eval meeting #2
Updated on Fri, 2011-09-02 08:49. Originally created by jeromel on 2011-09-02 08:46.1-189, at 12:42 (GMT), duration : 00:00
In general, we should review the progresses and discuss the below:
- CA - plan for evaluation (do we need additional help as offered by our GSI colleagues)
- Geometry integration - were are we + plan forward (discussed with Jason and re-iterated the FGT goal)
- Stv - progress and code readiness for evaluation
- Vertex integration (previous thread on PPVF) - plan
Pxl Survey Plan
Updated on Fri, 2011-09-02 08:04. Originally created by margetis on 2011-09-02 08:03.Reference
Talk time : 13:40, Duration : 00:05
WBS1.6 part in the project
Updated on Fri, 2011-09-02 08:04. Originally created by margetis on 2011-09-01 10:50.Reference
Talk time : 13:35, Duration : 00:05
Meeting Notes
Updated on Thu, 2011-09-01 11:38. Originally created by rfatemi on 2011-08-31 19:56.Turtle study of y vs theta_y at RP4 compared to Yip Data
Updated on Wed, 2011-08-31 12:43. Originally created by pile on 2011-08-31 12:43.HFT-Software
Updated on Fri, 2011-09-02 14:42. Originally created by margetis on 2011-08-31 11:50.510-4857333, at 17:30 (GMT), duration : 00:00
* There is going to be a face-to-face management meeting
at BNL 9/27-28 (Tues-Wed). There is the idea of having
a software just before or just after this meeting. The
default is after but send me (not the list) your
availability for either.
The agenda will be on high priority tasks and institutional
participation:
1) Calibration infrastructure. This includes CMM measurements,
Data Bases and Structures. This part of software is
officially on (and tracked by) the project. I will draft
a plan for immediate actions by Friday.
2) Geometry Db. This is a lot of work and not for a single
person. Need to define the team and coordinate with
Jason actual implementation. Need to define degree of
details and for this establish the links with the
hardware experts.
3) Simulators. I will invite French experts with code for
the pixel det. to come or video-come to the meeting.
4) Evaluation scheme. Jonathan recently stumbled on this and
reminded us that we need to clarify/establish evaluation
of HFT performances the STAR-way.
5) Cleanup/Move somewhere the Kalman codes.
* Please let me know if you have a topic/presentation to make
this Friday.
Time | Talk | Presenter |
---|---|---|
13:35 | WBS1.6 part in the project ( 00:05 ) 1 file | |
13:40 | Pxl Survey Plan ( 00:05 ) 1 file | |
13:45 | slides for 4) Evaluation scheme. ( 00:20 ) 2 files | jonathan |
FGT geom in MC
Updated on Wed, 2011-08-31 10:29. Originally created by balewski on 2011-08-31 10:28.Reference
Speaker : Jan Balewski
Talk time : 11:43, Duration : 00:20
update on geometry