new IST code

I run the bfc chain with the new version of StiIstDetectorBuilder from

current note

current version of the note on SSD efficencies during CuCu run V (work with Vi Nham Tram)

11/29 : update

Potential distortions at projected luminosities for different species

Under:

Here I show the expected distortions in the STAR TPC as represented by the pointing error of tracks to the primary vertex (otherwise known as the DCA) due to experienced (star symbols) and projecte

W Simulations

I produced some initial simulations for the W+- studies in the barrel. The MuDst are located in

/star/institutions/mit/seelek/Wsims/

Minutes/Action Items


Talk time : 13:32, Duration : 00:20

Action Items:

1) Jonathan to check Willie's fixes for UPG15 and prepare instructions

2) Data Set Production for LBL Workshop(?where?  BNL/PDSF?)

Efficiency calculation for new StiIstDetectorBuilder

The below plots were generated from 1000 single-pion events, using a version of the StiIstDetectorBuilder that treats each IST ladder as one big wafer (as was done for all previous IST geometries).

pi0 paper discussion log1

Hi all,

comparison IST hit position with track projection

Speaker : jonathan Bouchet


Talk time : 13:30, Duration : 00:02

As a follow-up of last meeting, I checked the IST hit positions (from GEANT) with respect

what the tracking (ITTF) is expecting at the IST layer.

LBL tracking workshop


Talk time : 13:10, Duration : 00:20

News


Talk time : 13:00, Duration : 00:10

HFT-Software

2008-11-14 13:30
2008-11-14 14:30
Etc/GMT-5
Friday, 14 November 2008
510-4867333, at 18:30 (GMT), duration : 01:00

TBD

TimeTalkPresenter
13:00News ( 00:10 ) 0 files
13:10LBL tracking workshop ( 00:20 ) 0 files
13:30comparison IST hit position with track projection ( 00:02 ) 2 filesjonathan Bouchet
13:32Minutes/Action Items ( 00:20 ) 0 files

Open Discussion

Prioritization Process for STAR R&D and Capital Needs for FY09

Speaker : Nu Xu


Talk time : 09:50, Duration : 00:25

Results from radiation monitoring inside STAR

Speaker : Howard Matis


Talk time : 09:25, Duration : 00:20

Expected Resource needs from STAR Operations for Upgrades in FY09

Speaker : Zhangbu Xu ( BNL )


Talk time : 09:00, Duration : 00:20

R&D and cap. funds

TimeTalkPresenter
09:00Expected Resource needs from STAR Operations for Upgrades in FY09 ( 00:20 ) 2 filesZhangbu Xu (BNL)
09:25Results from radiation monitoring inside STAR ( 00:20 ) 1 fileHoward Matis (BNL)
09:50Prioritization Process for STAR R&D and Capital Needs for FY09 ( 00:25 ) 0 filesNu Xu (BNL)
10:15Open Discussion ( 00:20 ) 0 files (BNL)

Discussion

Speaker : Group


Talk time : 16:40, Duration : 00:30

Management

Speaker : Tim Hallman & Bill Christie


Talk time : 16:20, Duration : 00:20

Magnet & Global Interlocks

Speaker : Bill Christie


Talk time : 16:10, Duration : 00:10

Software & Computing

Speaker : Jerome Lauret


Talk time : 15:35, Duration : 00:35