Run 9, preparation meeting #5
Updated on Fri, 2008-11-21 13:16 by testadmin. Originally created by jeromel on 2008-11-21 10:36.1-189, HighSpeed conference bridge, at 21:00 (GMT), duration : 01:00
- purchase status - Wayne - list of nodes candidates for Osiris/Ganglia - Wayne/Matthew - RTS/EVP action status and plan (especially in view of EMC) - Valeri - ETA for QA (offline & student availability check + online and framework availability) - Gene - DB port rotation / preparation [RunLog, ShiftLog, ...] http://drupal.star.bnl.gov/STAR/comp/db/online-sever-port-map - AOB
Time | Talk | Presenter |
---|---|---|
16:00 | EVP/RTS and impact on EMC ( 00:20 ) 0 files | Valeri Fine |
Preparations for HFT 12/8-12 workshop at LBL
Updated on Fri, 2008-11-21 12:59. Originally created by margetis on 2008-11-20 18:35.Reference
Talk time : 00:10, Duration : 00:20
Here is a first attempt on a check-list for the production.
People should comment by email or the meeting.
GEANT
-----
News
Updated on Thu, 2008-11-20 18:34. Originally created by margetis on 2008-11-20 18:34.Reference
Talk time : 00:00, Duration : 00:10
HFT Software
Updated on Thu, 2008-11-20 18:34. Originally created by margetis on 2008-11-20 18:33.510-4867333, at 18:30 (GMT), duration : 01:00
TBD
Time | Talk | Presenter |
---|---|---|
00:00 | News ( 00:10 ) 0 files | |
00:10 | Preparations for HFT 12/8-12 workshop at LBL ( 00:20 ) 0 files | |
00:30 | Minutes/Action Items ( 00:20 ) 3 files |
13 MIP algo, ver=1.1 (example of towers)
Updated on Tue, 2009-03-10 14:45. Originally created by mattheww on 2008-11-20 15:55. Under:This is an illustration of improvement of MIP finding efficiency if ADC gates are set on BPRS & BTOW at the places matched to actual gains instead of fixed 'ideal' location.
FGT. . . . . . . . . . H A R D W A R E -- S L O W C O N T R O L S
Updated on Wed, 2012-02-15 11:44. Originally created by balewski on 2008-11-20 11:29. Under:Documentation of FGT Slow Controls Subsystem
(add child pages with specific documents below)
2005 BTOW QA
Updated on Thu, 2008-11-20 10:53. Originally created by mattheww on 2008-11-20 10:49.I looked at the QA that Murad did over the BTOW looking for hot towers for 2005: http://cyclotron.tamu.edu/star/2005Jets/QA/hotTowers/.
No Meeting Next two weeks??
Updated on Thu, 2008-11-20 00:25. Originally created by matis on 2008-11-20 00:25.Talk time : 00:40, Duration : 00:20
IST
Updated on Thu, 2008-11-20 00:24. Originally created by matis on 2008-11-20 00:24.Speaker : Gerrit
Talk time : 00:30, Duration : 00:20
Pixel Electronics
Updated on Thu, 2008-11-20 00:23. Originally created by matis on 2008-11-20 00:23.Speaker : Leo
Talk time : 00:20, Duration : 00:10
Pixel Mechanics
Updated on Thu, 2008-11-20 00:23. Originally created by matis on 2008-11-20 00:23.Speaker : Howard W.
Talk time : 00:10, Duration : 00:20
News
Updated on Thu, 2008-11-20 00:22. Originally created by matis on 2008-11-20 00:22.Talk time : 00:00, Duration : 00:05
STAR SVT-SSD Alignment methods and infrastructure
Updated on Thu, 2008-11-20 00:22 by matis. Originally created by margetis on 2008-11-19 21:13.Speaker : Spiros
Talk time : 00:45, Duration : 00:45
No abstract - Talk !!
12 MIP gains ver1.0 (all tiles, also BTOW)
Updated on Tue, 2009-03-10 14:45. Originally created by mattheww on 2008-11-19 15:54. Under:This is still work in progress, same algo as on previous post.
Handling stuck 1-second RICH scalers
Updated on Thu, 2008-12-04 21:55. Originally created by genevb on 2008-11-19 15:51.I have previously noted instances of "stuck" 1-second RICH scaler readings in Run 8 data [»
Reconstruction and Trigger Efficiency Correction Factor
Now that I have my raw pion spectrum (see here) I need to proceed
Jigsaw Inv Mass Plots (final)
As noted here and here, the pion peak is difficult to model using single-particle MC. In single particle studies, the pion inv mass peak is reconstructed to narrow.