1-189, HighSpeed conference bridge, at 21:00 (GMT), duration : 01:00
- purchase status  - Wayne
- list of nodes candidates for Osiris/Ganglia   - Wayne/Matthew
- RTS/EVP action status and plan (especially in view of EMC) - Valeri
- ETA for QA (offline & student availability check + online and
  framework availability)   - Gene
- DB port rotation / preparation  [RunLog, ShiftLog, ...]
  http://drupal.star.bnl.gov/STAR/comp/db/online-sever-port-map
- AOB

 

TimeTalkPresenter
16:00EVP/RTS and impact on EMC ( 00:20 ) 0 filesValeri Fine

Preparations for HFT 12/8-12 workshop at LBL


Talk time : 00:10, Duration : 00:20

Here is a first attempt on a check-list for the production.
People should comment by email or the meeting.

GEANT
-----

News


Talk time : 00:00, Duration : 00:10

HFT Software

2008-11-21 13:30
2008-11-21 14:30
Etc/GMT-5
Friday, 21 November 2008
510-4867333, at 18:30 (GMT), duration : 01:00

TBD

TimeTalkPresenter
00:00News ( 00:10 ) 0 files
00:10Preparations for HFT 12/8-12 workshop at LBL ( 00:20 ) 0 files
00:30Minutes/Action Items ( 00:20 ) 3 files

13 MIP algo, ver=1.1 (example of towers)

Under:

This is an illustration of improvement of MIP finding efficiency if ADC gates are set on BPRS & BTOW at the places matched to actual gains instead of  fixed 'ideal' location.

Yield Extraction and Correction systematic

Goal:

FGT. . . . . . . . . . H A R D W A R E -- S L O W C O N T R O L S

Under:

 Documentation of FGT Slow Controls Subsystem

(add child pages with specific documents below)

 

Capital Equipment Requests for FY09

2005 BTOW QA

I looked at the QA that Murad did over the BTOW looking for hot towers for 2005: http://cyclotron.tamu.edu/star/2005Jets/QA/hotTowers/.

No Meeting Next two weeks??


Talk time : 00:40, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 00:30, Duration : 00:20

Pixel Electronics

Speaker : Leo


Talk time : 00:20, Duration : 00:10

Pixel Mechanics

Speaker : Howard W.


Talk time : 00:10, Duration : 00:20

News


Talk time : 00:00, Duration : 00:05

STAR SVT-SSD Alignment methods and infrastructure

Speaker : Spiros


Talk time : 00:45, Duration : 00:45

No abstract - Talk !!

12 MIP gains ver1.0 (all tiles, also BTOW)

Under:

 This is still work in progress, same algo as on previous post.

Handling stuck 1-second RICH scalers

 I have previously noted instances of "stuck" 1-second RICH scaler readings in Run 8 data [»

Fully Corrected Yields

 Ok, now we're cooking.  Most of the ingredients are in place.

Reconstruction and Trigger Efficiency Correction Factor

 Now that I have my raw pion spectrum (see here) I need to proceed

Jigsaw Inv Mass Plots (final)

 As noted here and here, the pion peak is difficult to model using single-particle MC.  In single particle studies, the pion inv mass peak is reconstructed to narrow.