Investigation CPUtime > RunTime
Problem
Lidia reported on April 1st that some jobs seem to have CPUTime > RunTime, throwing off balance our efficiency calculation.
DIS 2011 Talk version 2
DIS 2011 Talk version 2
Chris Perkins
4/12/2011
"Small-x and Forward Measurements at STAR"
FMS meeting 20110404 X-section and AN
Today I have plots that should be pretty much final.
Fig. 1. Background correction
Residuals from simulations with ideal alignment
Using simulations of pT = 5 GeV/c pi+ and pi- from Maxim, I tried to understand a little better what lead
HFT pointing resolution
Comparison of the pointing resolution for THICK and THIN configuration.
I used MuDst files from :
Run 9 200GeV DiJet Kinematics: First Look
This is my first look at various dijet kinematic quantities using the 2009 200GeV dataset.
residuals in simulation
pi+ and pi-
5 GeV
physical processes are off in GEANT (except energy loss)
DiJet Filter Performance at 500GeV
Using the similar filtering procedure developed by Matthew Walker (see link), I examined the perform
2011.03.31 Spin PWG Analysis Meeting
Attached is a brief review of the final systematic strategy for both the prompt photon cross section and asymmetry.
Heavy flavor talk in High pT workshop in Utrecht 2011
Heavy flavor talk in High pT workshop in Utrecht 2011
NFit mismatch AuAu200GeV Run10 - NCommon Vs NHit
Processesed 46 minimc files /star/data14/embed/AuAu200_production/PiPlus_AuAu200GeV_11074049/PiPlus_*/*/*/*/*.minimc.root
Number of events : 24164
Data: AuAu200GeV
QRDO
Updated on Wed, 2011-03-30 12:32. Originally created by levine on 2011-03-30 12:32.Reference
Speaker : Micheal, Christophe
Talk time : 08:00, Duration : 00:20
Discuss the Quick RDO card, a test fixture for the ladder board. Picture attached.