D0 crossfeed
goal : study the contamination due to mis-identification of daughter in D0->K^{-}pi^{+}
High resolution graphics - by Alex Schmah
These settings are by Alex Schmah:
Compiling and installing ROOT on Ubuntu
- First you need to download the source code package.
Low pT (0.5 - 10.0 GeV/c) simulation study
-simulation for 0.5 < pT < 10.0 GeV/c.
-only including energy loss in the simulation
AgML Sandbox Release 03-28-2011
Electrical Shroud
Updated on Tue, 2011-03-29 10:28. Originally created by matis on 2011-03-29 10:28.Differences in eta/pion centroids in run 6 and 9
For the first two plots, the points in red represent Run 9 data, black is run 6.
Run 6 PT bin fits with more stats
4-5, 5-6, 6-7, 7-9, 9-30 respectively in PT
Pion yields
We had a fairly stable trigger rate up to day 65 then, after some days of variablility, a stable rate after day 79.
FMS meeting 20110328 X-section etc 2
Cross-section and AN as of 3/28/2011
To do list
Tpc alignment with Cosmic for Run X/XI
Processing of Cosmic for alignment has not yet been completed but I would like to share preliminary results on Inner to Outer sector misalignment. The method is following:
New Code for LED Time Dependence
Time Dependence of FMS ADC
I am working on a proceedure for including time dependenced as we read FMS ADC data into the PSU analysis package.
Run 11 shift schedule before extending
The below is a snapshot of the shift planing before we extend Run 11 to +4 weeks.
Embedding/Data NFit mismatch in AuAu200 Run10
Embedding/Data NFit mismatch in AuAu200 Run10