EMC jet cone radius 0.6

D0 crossfeed

goal : study the contamination due to mis-identification of daughter in D0->K^{-}pi^{+}

High resolution graphics - by Alex Schmah

These settings are by Alex Schmah:

 

Compiling Herwig++ on Ubuntu

First compiling and installing LHAPDF:

Compiling and installing ROOT on Ubuntu

  1. First you need to download the source code package.

Low pT (0.5 - 10.0 GeV/c) simulation study

-simulation for 0.5 < pT < 10.0 GeV/c.

-only including energy loss in the simulation

20110329 Jet Meeting

AgML Sandbox Release 03-28-2011

New Features:
o Build system:
+ cons fully exports namespaces
o Export

Electrical Shroud

Speaker : Howard W.


Talk time : 07:00, Duration : 00:20

Differences in eta/pion centroids in run 6 and 9

For the first two plots, the points in red represent Run 9 data, black is run 6. 

Run 6 PT bin fits with more stats

4-5, 5-6, 6-7, 7-9, 9-30 respectively in PT

Run 9, 6 parameter side by side comparison with larger run 6 stats

Run 6:  Run 9:

Pion yields

We had a fairly stable trigger rate up to day 65 then, after some days of variablility, a stable rate after day 79.

FMS meeting 20110328 X-section etc 2

Cross-section and AN as of 3/28/2011 

 

To do list

Tpc alignment with Cosmic for Run X/XI

 Processing of Cosmic for alignment has not yet been completed but I would like to share preliminary results on Inner to Outer sector misalignment. The method is following:

New Code for LED Time Dependence

Time Dependence of FMS ADC

 I am working on a proceedure for including time dependenced as we read  FMS ADC data into the PSU analysis package.

EMC jet cut studies with cone radius 0.5

FGT Installation / Integration / Commissioning

Run 11 shift schedule before extending

The below is a snapshot of the shift planing before we extend Run 11 to +4 weeks.

Embedding/Data NFit mismatch in AuAu200 Run10

Embedding/Data NFit mismatch in AuAu200 Run10