Mass, Mu and Mv -- IU Algo

In regard to Dave Underwoods post on Jan. 12th, 2012, I plot the Mu vs Mv and several related mass plots.

IST numbering


Talk time : 13:30, Duration : 00:20

HFT Software

2012-03-16 14:30
America/New York
Friday, 16 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00

HFT Software

2012-03-23 14:30
America/New York
Friday, 23 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00


510-4867333

Items for this Friday's meeting are:

1) Hao Qiu has prepared an informal presentation on his
     analysis of the single-thinned chip survey with the new
    CMM machine, optical probe. I asked him to present it to
    the group. We also had the chance at LBL to discuss a bit
    about the geometry structures in detail were I promised to
    provide some details on previous SVT work and details/examples
    on structures we use.

2) Jonathan made some progress (timing)  and managed to fix some bugs
    in reconstruction with new geometry.

Other Items:

a) Flemming provided some prelim drawings of the beam pipe. They are good
    to be used for modeling.

b) I talked to H.W. about big chunks of mass still missing from modeling. Some of
     his feedback is posted on the action-items of Geometry-review page:
http://drupal.star.bnl.gov/STAR/event/2012/03/09/hft-software/round-table-discussion-action-items-defined-20

c)  I talked to H.M. (with J.T and M.L) about a plan for SSD ladder survey at LBL.
     Ladder(s) are stuck in customs on their way to LBL, not for long I hope.
     We all have an understanding about what need to be done.

d) I had a discussion with Xin on the Offline structures/needs. There is
    a multitude of structures we need to touch or build from scratch and
    associated issues like:
    1) StEvent Hit containers -> move away from RnD to PXL, IST etc
      with proper structure, e.g. instead of layer, ladder, pixel have sector,
      ladder, pixel for PXL etc. The same for StMcEvent containers
    2) Hit info on Tracks. make sure it is done properly, e.g. possible # hits
    3) Is current MuDst info sufficient? We have made proposal to modify
        and update the info (+Evaluation, minimc info). Need to finalize/implement.
         We both agreed/emphasized the use of Dcageometry info in HF reconstruction
         as well as Kalman fitters (minimum work is needed to fully deploy this).
    4) Slow/Fast simulators: Move final scheme/products in place of current
         short-cut one.
This is the road map more or less, also by looking at the overall execution flow
of software.

e) There are two reviews coming up we need to keep in mind:
   i) One review for software/procedure that connects metrology to geometry
      structures in the Db. This is going to happen in about a month from now.
      By then we need to have the test-sector CMM data taken (this is a
     pre-requisite for the review).
   ii) Track Alignment structures/procedures in place (prototype run etc). This
      will happen sometime in the Fall.

TimeTalkPresenter
13:30Beam pipe etc pics ( 00:10 ) 4 files
13:40Single sensor CMM measurements ( 00:20 ) 0 filesHao
14:00item 2. : bfc timing ( 00:20 ) 0 files
14:20item d. : offline structures ( 00:20 ) 1 file

HFT Software

2012-03-02 13:30
America/New York
Friday, 2 March 2012
510-4867333, at 18:30 (GMT), duration : 00:00

Agenda for Internal Review of Y2013-base geometry

Place: BNL/EVO,  Date: March 9, 2012

Reviewers:  Eric Anderssen, Howard Wieman (rerp. by Leo Greiner),   Yuri Fisyak , Jason Webb, Xin Dong, +"Management" (not Flemming since he is an author)


Presentations/ Content

- Overview 10' Spiros
    * context but also what is this geometry for
    * This is not only about what the review is
      but also what we want from the product

- comparisons of SW model and Flemmings implementation
       20' Flemming

- Geant modeling and comparison with SW model
       20-30' Jonathan

- Comments after walkthrough of code (issues, clarity etc)
       10-15' Jason (?)

- Numbering schemes - 10' Spiros (?) Mostly restate what
       was agreed upon

- BFC-tests with simple tracks. Timing/Issues
      10-15' Jonathan

- Round table discussion. Action items defined.

 

TimeTalkPresenter
13:30IST numbering ( 00:20 ) 1 file
13:30Minutes ( 00:20 ) 1 file
13:50prototype patch Acceptance/Efficiency for D0s ( 00:20 ) 2 filesjonathan

HFT Y2013 Geometry Review

2012-03-09 13:30
America/New York
Friday, 9 March 2012
BNL/EVO, at 18:30 (GMT), duration : 00:00

You have BOOKED a meeting in EVO (http://evo.caltech.edu).

Title:        HFT Y2013 Geometry Review - 

PLACE: BNL,  Rm 1-189 from 1.30-3.30 Fri 3/9/2012
Description:    STAR-HFT detector internal review
Community:    STAR
Password:    geometry

Meeting Access Information:
- Meeting URL
    http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2I22D2Du9e98DI9a

- Password: geometry
- Phone Bridge
    ID: 487 6317
    Password: 1193

Eastern Standard Time (-0500)
    Start    2012-03-09  13:30
    End      2012-03-09  18:00

 

TimeTalkPresenter
13:30Overview 10' ( 00:20 ) 1 fileSpiros
13:40Comparisons of SW model and Flemmings implementation ~15' ( 00:20 ) 1 fileFlemming
13:50Geant modeling and comparison with SW model 20-30' ( 00:20 ) 3 filesJonathan
13:55Comments after walkthrough of code [in advance] (issues, clarity etc) 10-15' ( 00:20 ) 1 fileJason
14:00HFT-Numbering scheme/doc - 10' ( 00:20 ) 2 filesSpiros
14:15BFC-tests with simple tracks. Timing/Issues 10-15' ( 00:20 ) 3 filesJonathan
14:35Action items/Summary ( 00:20 ) 0 filesAll

IST prototype stave testing

Speaker : Dr. Gerrit J. van Nieuwenhuizen II ( Massachusetts Institute of Technology )


Talk time : 13:45, Duration : 00:20

new clustering on "/star/data03/daq/2012/054/13054059p_rf/st_physics_13054059_raw_0010001.daq"

Eta paper update Mar 2012

Increase of HV & gain for 10-90 gas mix

gas flow study, 6A

 We have switched to high gas flow around 2 pm on Tuesday, Feb 29. The purpose was to increase removal of the oxygen drifting in to detector due to diffusion.

Run 9 NPE Analysis in p+p collisions at 200 GeV

Dataset & cuts 

Run 9 p+p 200 GeV 105M vpdMB events after selection.

cluster file for st_physics_13057059_raw_4010002.daq

LHC writeup

First reco FGT track in pp200, 2012, gas mix 10-90, Feb 26

run 13057059, taken just before beam dump (no CNI background).

2nd check of Run12

 These plots include the data from the first check (i.e.

L2 Monitoring Comparison

Please see in the attachment.

Npe flow in Au+Au 200 GeV Run 10 - HF meeting, 02/28/2012

new cluster file for st_physics_13050045_raw_2010002 -

new format, dead strip masking enabled, dead strip jumping enabled

 

first 300 evts

 

new radio plots for st_physics_13050045_raw_2010002

 

The difference with the previous plots is:

-used seeded cluster algo