News from the run

Speaker : Bernd Surrow ( MIT )


Talk time : 12:00, Duration : 00:15

Software and Computing Meeting

2012-03-14 12:00
2012-03-14 13:00
America/New York
Wednesday, 14 March 2012
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the run ( 00:15 ) 1 fileBernd Surrow (MIT)
12:15Updates on HFT geometry and tracking development ( 00:20 ) 1 fileJonathan Bouchet
12:35AgML, closing the loop ( 00:15 ) 1 fileJason Webb (BNL)
12:50AOB ( 00:10 ) 0 filesAll (All)

Notes on Event Generator Frameworks

PPV test w/ and w/o BTOF with run12 real data

The PPV with BTOF included is tested with Run 12 real data(pp200, low luminosity fill).

The data file using in this test is (total events 19191)

Simple pi0 Mass Bkg Study

The method for estimating the combinatorial (decorrelated) background is described.  The invarient mass distribution is compared for the signal plus all backgrounds and the combinatorial background.  After subtracting the background, a few fits of the remaining distribution is considered.  These studies are meant to be simple inquiries to guide further study.


HLT Beamline convergence study

In trying to automate the offline montioring of the BeamLine position, I've done some tests of the convergence of the HLT BeamLine calibration code, which uses a BeamLine as input, and thus must it

RHIC Scheduling Meeting / March 13, 2012

Readiness for AgML-based simulation

EEMC Energy Calibration using MIPs - Update (12 March 2012)

I have gone through a few more 'passes' of calibrating the EEMC for 2009. An update is attached. Tower gains appear to be converging to stable values.

eSTAR Task Force biweekly meeting

2012-03-27 13:00
2012-03-27 14:00
America/New York
Tuesday, 27 March 2012
EVO 123569, at 17:00 (GMT), duration : 01:00

eSTAR Task Force biweekly meeting

2012-03-13 12:00
2012-03-13 13:00
America/New York
Tuesday, 13 March 2012
EVO 123569, at 16:00 (GMT), duration : 01:00

Agenda

 

1) simulation and plans

  a) software coordinating

  b) event generator inputs (updates)

  c) detector geometries

  d)simulation goals (reminder)

     Production list is 
  
http://drupal.star.bnl.gov/STAR/system/files/STAR_Upgrade_UCLA_eSTAR_Todolist.pdf
   
  
http://drupal.star.bnl.gov/STAR/event/2012/01/31/estar-task-force-biweekly-meeting

2) ETTIE and Inner TPC updates (Ming, Hao)

 

3) Detector R&D updates

 

4) June workshop (agenda and speakers)

 

Thanks!
 

Ernst and Zhangbu

FGT timing scan with the new gas

Presentation with results

 

APV by APV plots for

ZDC asymmetry, run 9 vs. run 12

 

 

FMS meeting 03/12/2012

QA as function of event multiplicity (RefMult) for UPC rho embedded in zero bias events

The aim of this blog is to demonstrate that in order to compare physical quantities like pseudo-rapidity and track quality parameters like the number of hits used to build the track (NHit) one has

Focus subject discussion

Speaker : pot pourri


Talk time : 16:30, Duration : 03:00

Each sub-­‐system should address:
    Critical items/tasks for run-­‐13 installation

Software

Speaker : S. Margetis


Talk time : 16:00, Duration : 00:30

Break


Talk time : 15:30, Duration : 00:30

SSD electronics

Speaker : M.J. LeVine


Talk time : 15:10, Duration : 00:20

SSD overview

Speaker : J. Thomas


Talk time : 14:45, Duration : 00:25