Alignment note - working on the new version.
This is a new version of the alignment note. "Sheet1" was added. Need input from Wlodek
about beam position at roman pots calculations to finish.
Acceptance for FMS preshower
Comparison of the acceptance of FMS (black) and the proposed preshower (red).
Run12 Collins (All Plots) - Jet Meeting 11/26/2013
The first file below is the update for today outlining a few of the plots.
Difference in x quark vs gluon
The question is whether there is a difference in x when the final state parton is a gluon or a quark. This was done with the same set up and simulated data as my previous x,Z analyis.
Scalers
Protected Subdirectory:
http://www.star.bnl.gov/protected/spin/dilks/scalers2013/
Run-12 Transverse Jets: Collins-like Asymmetries Trigger-by-trigger
As a final first-look at trigger bias, I examine the Collins-like asymmetries trigger-by-trigger. The bias, here, should behave somewhat similar to the Sivers asymmetry.
Software Review: StFmsSimulatorMaker
1. Code Organization
StFmsSimulatorMaker should reside in its own directory, outside of a pool area: StRoot/StFmsSimulatorMaker/
BXing check before production
I spot-checked two runs to check the beam cogging. The offset of yellow beam at STAR is confirmed to be 80.
Run-12 Transverse Jets: Sivers Asymmetries Trigger-by-trigger
Using the same trigger definitions as described previously, I now
QPID Sender and Receiver Executables
I have attached both the sender and receiver executables. The code should be farily self-explanatory.
Data Alignment Update-All sectors
Updated on Fri, 2013-11-22 13:23 by margetis. Originally created by mlomnitz on 2013-11-22 13:17.Reference
Speaker : Michael Lomnitz
Talk time : 03:45, Duration : 00:20
SPIROS: My first quick analysis of Jonathan's simulations on DATA for
SECTOR-2 and 4 are:
IST offine update & survey tables
Updated on Fri, 2013-11-22 15:23. Originally created by ypwang on 2013-11-22 13:10.IST Online Software
Updated on Fri, 2013-11-22 13:00. Originally created by zillay on 2013-11-22 13:00.Run14 run preparation meeting #1
1-189, SRN, at 20:00 (GMT), duration : 01:00