run9 inclusive jet cross section unfolding to particle level jet

After corrected the prescales for JP1 tr

Missing resistor for West OFC short

 Using sample of electron tracks (see Grigory Nigmatkulov blog) with all distotion correction on (ExB,OShortR,OBmap,OPr13,OIFC,OSectorAlign) and the latest analysis of Tpc survey I plotted

Upsilons in U+U 193 GeV, status report

 Please find the attached slides

Update on NPE-h correlations in AuAu 200 GeV

HFT Software Face-2-Face

2013-12-12 09:00
2013-12-12 21:00
America/New York
Thursday, 12 December 2013
BNL ITD seminar room; second floor Bdlg 515 (near stairs at south entrance), at 14:00 (GMT), duration : 12:00

ITD seminar room; second floor Bdlg 515  (near stairs at south entrance)

 AGENDA (Preliminary)

9:00 - 9:20 HFT Project Overview 20' Flemming  
[ ( Detector status/commissioning timeline/needs )]
9:30-9:50 Software Status Overview 20' Spiros
10:00- 10:20 Geometry Modeling   20' (?Flem/Jon?)
-----break-----
11:00-12:30   PXL Software (Hao convener)
- Offline chain  including Simulation and Review feedback
- Survey update
- QA
- Run14/Calib readiness/issues
++++Run13 Calibrations (ask Gene to participate)

lunch break

1:30- 2:30 IST Software (Yaping convener)
- Offline chain   including Simulation and Review feedback
- Survey update
- QA
- Run14/Calib readiness/issues
2:30- 3:00 SSD Software (Jonathan/Long Z.)
- Offline chain   including Simulation
- Survey update
- QA
- Run14/Calib readiness/issues
------break----------
3:30-4:30 Alignment  Status Spiros convener
- Methods
- Results
4:45-5:30  Simulations and Analysis software Shusu Shi convener
6:00-6:30 Run13 Analysis plans - Discussion Xin convener
6:30 Dinner

7:30 Evening session of focus items

Friday some of us start our trip back very early in the morning
sonothing can be scheduled for that day.

TimeTalkPresenter
09:00Project verview ( 00:20 ) 1 fileFlemming Videbæk
09:20Software Overview ( 00:30 ) 1 fileSpiros Margetis
09:50Geometry Status ( 00:20 ) 2 filesFlemming Videbæk
10:10PIXEL SOFTWARE ( 00:20 ) 1 file
10:30IST Software ( 00:20 ) 2 filesYaping, Zillay
10:50SSD Software ( 00:20 ) 3 files
11:10Alignment ( 00:20 ) 4 files
11:30Simulation/Analysis ( 00:20 ) 1 file
11:50Run13 Analysis ( 00:20 ) 1 file
12:10Minutes ( 00:20 ) 0 files

Summary of previous Drell-Yan studies

These Drell-Yan studies have previously been made for the PHENIX decadal plan and forward detector upgrades. They are pretty generic for the most part, though.

Offline QA to-do list before Run 14

Based on my presentation at the Run 13 critique meeting:
  • Histogramming codes:

SSD survey tables

 

SSD DAQ Maker update--2013-12-04

J/psi update

Speaker : L. C. De Silva ( Creighton University )


Talk time : 10:50, Duration : 00:20

 

Diffraction update

Speaker : R. Debbe


Talk time : 10:30, Duration : 00:20

Update on Inter-sector Alignment

Speaker : Xin Dong


Talk time : 04:05, Duration : 00:20

 

Draft Slides for the Indiana-Illinois Workshop on Fragmentation Functions

 

run9 trigger prescale

I looked at the prescale values for BBC-MB cat2, JP1 and L2JetHigh triggers in run9 p+p 200GeV data.

BEMC Status 2013 Documentation

 The attached document gives the summary of the work done for 2013 on the status tables. It will soon be loaded to the BEMC section of the sub-systems drupal page.

Inclusive jet cross section update - 20131203 jet meeting

Preshower Review

Compilation of comments from the review team in STAR.

Physics, simulations: Ernst
Detector design, readout: Dick, Craig
Integration: Rahul

FMS Meeting 12/02/2013 --Vertex Z cut

Run 13 W Task List

run13 W MC simulation

1. Test productio