run9 inclusive jet cross section unfolding to particle level jet
After corrected the prescales for JP1 tr
Missing resistor for West OFC short
Using sample of electron tracks (see Grigory Nigmatkulov blog) with all distotion correction on (ExB,OShortR,OBmap,OPr13,OIFC,OSectorAlign) and the latest analysis of Tpc survey I plotted
HFT Software Face-2-Face
Updated on Tue, 2013-12-10 16:19. Originally created by margetis on 2013-12-04 17:15.BNL ITD seminar room; second floor Bdlg 515 (near stairs at south entrance), at 14:00 (GMT), duration : 12:00
ITD seminar room; second floor Bdlg 515 (near stairs at south entrance)
AGENDA (Preliminary)9:00 - 9:20 HFT Project Overview 20' Flemming
[ ( Detector status/commissioning timeline/needs )]
9:30-9:50 Software Status Overview 20' Spiros
10:00- 10:20 Geometry Modeling 20' (?Flem/Jon?)
-----break-----
11:00-12:30 PXL Software (Hao convener)
- Offline chain including Simulation and Review feedback
- Survey update
- QA
- Run14/Calib readiness/issues
++++Run13 Calibrations (ask Gene to participate)
lunch break
1:30- 2:30 IST Software (Yaping convener)
- Offline chain including Simulation and Review feedback
- Survey update
- QA
- Run14/Calib readiness/issues
2:30- 3:00 SSD Software (Jonathan/Long Z.)
- Offline chain including Simulation
- Survey update
- QA
- Run14/Calib readiness/issues
------break----------
3:30-4:30 Alignment Status Spiros convener
- Methods
- Results
4:45-5:30 Simulations and Analysis software Shusu Shi convener
6:00-6:30 Run13 Analysis plans - Discussion Xin convener
6:30 Dinner
7:30 Evening session of focus items
Friday some of us start our trip back very early in the morning
sonothing can be scheduled for that day.
Time | Talk | Presenter |
---|---|---|
09:00 | Project verview ( 00:20 ) 1 file | Flemming Videbæk |
09:20 | Software Overview ( 00:30 ) 1 file | Spiros Margetis |
09:50 | Geometry Status ( 00:20 ) 2 files | Flemming Videbæk |
10:10 | PIXEL SOFTWARE ( 00:20 ) 1 file | |
10:30 | IST Software ( 00:20 ) 2 files | Yaping, Zillay |
10:50 | SSD Software ( 00:20 ) 3 files | |
11:10 | Alignment ( 00:20 ) 4 files | |
11:30 | Simulation/Analysis ( 00:20 ) 1 file | |
11:50 | Run13 Analysis ( 00:20 ) 1 file | |
12:10 | Minutes ( 00:20 ) 0 files |
Summary of previous Drell-Yan studies
These Drell-Yan studies have previously been made for the PHENIX decadal plan and forward detector upgrades. They are pretty generic for the most part, though.
Offline QA to-do list before Run 14
- Histogramming codes:
J/psi update
Reference
Speaker : L. C. De Silva ( Creighton University )
Talk time : 10:50, Duration : 00:20
Diffraction update
Updated on Wed, 2013-12-04 09:06. Originally created by ramdebbe on 2013-12-04 09:06.Update on Inter-sector Alignment
Updated on Tue, 2013-12-03 18:19. Originally created by dongx on 2013-12-03 18:19.run9 trigger prescale
I looked at the prescale values for BBC-MB cat2, JP1 and L2JetHigh triggers in run9 p+p 200GeV data.
BEMC Status 2013 Documentation
The attached document gives the summary of the work done for 2013 on the status tables. It will soon be loaded to the BEMC section of the sub-systems drupal page.
Preshower Review
Compilation of comments from the review team in STAR.
Physics, simulations: Ernst
Detector design, readout: Dick, Craig
Integration: Rahul