STAR Messaging Studies: Phase 1 Presentation

Here is a PDF of the STAR Messaging Studies: Phase 1 Presentation

Draft of the contribution to DSPIN'2013 proceedings. Version 4.

Find draft of my contribution to the proceedings of SPIN'2013 Workshop in Dubna, please.

Preliminary ROOT Plot for Qpid Performance

Here is a very preliminary ROOT plot for qpid performance.

QA report


Talk time : 10:30, Duration : 00:20

Embedding QA


Talk time : 12:00, Duration : 00:20

Azimuthal Femtoscoy in U+U - First Steps

AOB

Speaker : All ( All )


Talk time : 12:40, Duration : 00:20

Stv progress & status

Speaker : J. Webb & V. Perevoztchikov ( BNL )


Talk time : 12:30, Duration : 00:10

Calibrations Status

Speaker : Gene Van Buren ( BNL )


Talk time : 12:10, Duration : 00:20

 

TPC Twist & T0

Speaker : John Campbell ( OSU )


Talk time : 12:00, Duration : 00:10

https://drupal.star.bnl.gov/STAR/blog/campbell/2013/dec/12/tpc-twistt0-final-chapter

Software and Computing Meeting

2013-12-18 12:00
2013-12-18 13:00
America/New York
Wednesday, 18 December 2013
1-189, SRN, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00TPC Twist & T0 ( 00:10 ) 0 filesJohn Campbell (OSU)
12:10Calibrations Status ( 00:20 ) 1 fileGene Van Buren (BNL)
12:30Stv progress & status ( 00:10 ) 2 filesJ. Webb & V. Perevoztchikov (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

Beam structure in run 2009. Simulation of pp2pp setup (with triggering system) in 2009.

Speaker : Rafal Sikora ( AGH UST Cracow )


Talk time : 11:30, Duration : 00:30

 

Alignment 2009

Speaker : Bogdan Pawlik ( INP PAS )


Talk time : 11:10, Duration : 00:20

Alignment 2009 remake

Particle production in SDD

Speaker : Lukasz Fulek ( AGH-UST )


Talk time : 10:50, Duration : 00:20

 

Qpid Performance Graphs for 8 byte, 32 byte, and 64 byte message length

Here are graphs for Qpid performace measuring messages per second as a function of message length (8 bytes, 16 bytes, and 32 bytes).

EMC^2 Software Coordinator Yearly Task List

 This blog will be continually updated with a list of tasks required for the EMC^2 software coordinator to complete (from the BEMC coordinator point of view).

Rho Analysis report

Speaker : R. Debbe


Talk time : 10:30, Duration : 00:20

Qpid Sender with lockfile

Here is the sender executable with the lockfile

SSD DB tables

Geometry/ssd

Di-electron GPC meeting