Sti Geometry Check with SL14g - July 23, 2014

I tested the Sti HFT geometry again the SL14g library done on July 22, 2014. Please see the results below. Please refer to the earlier posts for preceeding studies.

Samhain and Beltane notes

Initial thoughts prior to any configuration or use:

Several configuration options to consider right away, some coming with costs...

--enable-suidcheck :

Testing stiscan with geant steps tree

The following images show energy deposited in some Sti volumes for what supposed to be a similar set of tracks, i.e. track generated at z=-3 cm perpendicular to the beam.

STAR Management Meeting

2014-07-31 10:50
2014-07-31 13:00
America/New York
Thursday, 31 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10

STAR Management Meeting

2014-07-24 10:50
2014-07-24 13:00
America/New York
Thursday, 24 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10

1) Roman Pot Upgrade status report (Wlodek)
https://drupal.star.bnl.gov/STAR/blog/videbaks/progress-reports-run-15-upgrades 

2) discussions/responses to ALD's requests


3) production/topic priority from PWGC

4) upgrade and collaboration meetings
Upgrade workshop October 2-3, Chicago
Collaboration meeting, November 3-8, BNL

5) new collaboration institutions, requests
https://drupal.star.bnl.gov/STAR/system/files/Info_to_join_STAR_letter_Yi_Yang.docx 

6) Other items

Thanks!

Zhangbu

Run 12 UU GridLeak vs. Sector

 In the midst of studies of using the new TPC alignment in SpaceCharge & GridLeak calibration of Run 12 UU data, I took a look at the remaining GridLeak distortion vs. sector.

EEMC Cal-07-23-2014

Recalibrate the SMD gains, compare to the final SMD gains get from database:

Bam halo and accidentals in 2009 (update)

Speaker : Leszek Adamczyk (AGH-UST cracow)


Talk time : 16:50, Duration : 00:10

Transition to ops, lessons leraned and Contingency expenditure

Speaker : F.Videbaek + all


Talk time : 13:40, Duration : 00:20

 

SSD status requirements and deliverables

Speaker : J.Thomas


Talk time : 13:20, Duration : 00:20

 

IST status, requirements and deliverables

Speaker : Zhenyu Ye


Talk time : 13:00, Duration : 00:20

 

PXL status, requirements and deliverables

Speaker : Leo Greiner


Talk time : 12:40, Duration : 00:20

 

Cost and Schedule

Speaker : Sarah Morgan


Talk time : 12:20, Duration : 00:20

 

HFT status and overview

Speaker : F.Videbæk


Talk time : 12:00, Duration : 00:20

 

HFT dry run

2014-07-24 13:00
America/New York
Thursday, 24 July 2014
2-219, at 17:00 (GMT), duration : 00:00
 The dry runs will be held over two days:
 Thursday and Friday Connection will be by phone bridge
Tlaks will not nesc be given in order


TimeTalkPresenter
12:00HFT status and overview ( 00:20 ) 2 filesF.Videbæk
12:20Cost and Schedule ( 00:20 ) 2 filesSarah Morgan
12:40PXL status, requirements and deliverables ( 00:20 ) 3 filesLeo Greiner
13:00IST status, requirements and deliverables ( 00:20 ) 2 filesZhenyu Ye
13:20SSD status requirements and deliverables ( 00:20 ) 2 filesJ.Thomas
13:40Transition to ops, lessons leraned and Contingency expenditure ( 00:20 ) 1 fileF.Videbaek + all
14:00Project Closeout report ( 00:20 ) 1 file

Particle spetra in SDD (2009 data)

Speaker : Lukasz Fulek ( AGH-UST )


Talk time : 16:30, Duration : 00:20

 

2013 - Barrel Noise Investigation

Testing/Setting up the Macro

Run - 13072016
MuDst file - st_physics_13072016_raw_5020004.MuDst.root

Run12 Inclusive Jet pT Shift Studies -- Using Run11 pp500 Embedding Sample

 

SSD Sti Geometry

SST Sti Geometry

Updated SST Sti geometry

/star/institutions/ksu/bouchet/S

Underlying Event For Run 9 pp500

 The Run 6 pp 200 GeV Underlying Event Anaylsis can be found at the following:

https://drupal.star.bnl.gov/STAR/files/APS_WEBB_UE_0.pdf