Sti Geometry Check with SL14g - July 23, 2014
I tested the Sti HFT geometry again the SL14g library done on July 22, 2014. Please see the results below. Please refer to the earlier posts for preceeding studies.
Samhain and Beltane notes
Initial thoughts prior to any configuration or use:
Several configuration options to consider right away, some coming with costs...
--enable-suidcheck :
Several configuration options to consider right away, some coming with costs...
--enable-suidcheck :
Testing stiscan with geant steps tree
Updated on Wed, 2014-07-23 12:47. Originally created by smirnovd on 2014-07-23 12:38.The following images show energy deposited in some Sti volumes for what supposed to be a similar set of tracks, i.e. track generated at z=-3 cm perpendicular to the beam.
STAR Management Meeting
Updated on Wed, 2014-07-23 12:24. Originally created by xzb on 2014-07-23 12:24. 2014-07-31 10:50
2014-07-31 13:00
America/New York
Thursday, 31 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
STAR Management Meeting
2014-07-24 10:50
2014-07-24 13:00
America/New York
Thursday, 24 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
1) Roman Pot Upgrade status report (Wlodek)
https://drupal.star.bnl.gov/STAR/blog/videbaks/progress-reports-run-15-upgrades
2) discussions/responses to ALD's requests
3) production/topic priority from PWGC
4) upgrade and collaboration meetings
Upgrade workshop October 2-3, Chicago
Collaboration meeting, November 3-8, BNL
5) new collaboration institutions, requests
https://drupal.star.bnl.gov/STAR/system/files/Info_to_join_STAR_letter_Yi_Yang.docx
6) Other items
Thanks!
Zhangbu
Run 12 UU GridLeak vs. Sector
In the midst of studies of using the new TPC alignment in SpaceCharge & GridLeak calibration of Run 12 UU data, I took a look at the remaining GridLeak distortion vs. sector.
EEMC Cal-07-23-2014
Recalibrate the SMD gains, compare to the final SMD gains get from database:
Bam halo and accidentals in 2009 (update)
Updated on Wed, 2014-07-23 09:21. Originally created by adamczyk on 2014-07-23 09:21.Reference
Speaker : Leszek Adamczyk (AGH-UST cracow)
Talk time : 16:50, Duration : 00:10
Transition to ops, lessons leraned and Contingency expenditure
Updated on Tue, 2014-07-29 12:03. Originally created by videbaks on 2014-07-23 09:08.SSD status requirements and deliverables
Updated on Tue, 2014-07-29 20:23 by jhthomas. Originally created by videbaks on 2014-07-23 09:06.IST status, requirements and deliverables
Updated on Wed, 2014-07-30 20:31 by yezhenyu. Originally created by videbaks on 2014-07-23 09:06.PXL status, requirements and deliverables
Updated on Tue, 2014-07-29 12:57 by lcgreine. Originally created by videbaks on 2014-07-23 09:05.Cost and Schedule
Updated on Mon, 2014-07-28 09:45. Originally created by videbaks on 2014-07-23 09:03.HFT status and overview
Updated on Mon, 2014-07-28 18:17. Originally created by videbaks on 2014-07-23 09:02.HFT dry run
2014-07-24 13:00
America/New York
Thursday, 24 July 2014
2-219, at 17:00 (GMT), duration : 00:00
2-219, at 17:00 (GMT), duration : 00:00
The dry runs will be held over two days:
Thursday and Friday Connection will be by phone bridge
Tlaks will not nesc be given in order
Thursday and Friday Connection will be by phone bridge
Tlaks will not nesc be given in order
Time | Talk | Presenter |
---|---|---|
12:00 | HFT status and overview ( 00:20 ) 2 files | F.Videbæk |
12:20 | Cost and Schedule ( 00:20 ) 2 files | Sarah Morgan |
12:40 | PXL status, requirements and deliverables ( 00:20 ) 3 files | Leo Greiner |
13:00 | IST status, requirements and deliverables ( 00:20 ) 2 files | Zhenyu Ye |
13:20 | SSD status requirements and deliverables ( 00:20 ) 2 files | J.Thomas |
13:40 | Transition to ops, lessons leraned and Contingency expenditure ( 00:20 ) 1 file | F.Videbaek + all |
14:00 | Project Closeout report ( 00:20 ) 1 file |
Particle spetra in SDD (2009 data)
Updated on Wed, 2014-07-23 08:58. Originally created by lukfulek on 2014-07-23 08:58.Reference
Speaker : Lukasz Fulek ( AGH-UST )
Talk time : 16:30, Duration : 00:20
2013 - Barrel Noise Investigation
Testing/Setting up the Macro
Run - 13072016
MuDst file - st_physics_13072016_raw_5020004.MuDst.root
SSD Sti Geometry
Updated on Tue, 2014-07-22 10:37. Originally created by smirnovd on 2014-07-22 10:29.SST Sti Geometry
Updated SST Sti geometry
/star/institutions/ksu/bouchet/S
Underlying Event For Run 9 pp500
The Run 6 pp 200 GeV Underlying Event Anaylsis can be found at the following:
https://drupal.star.bnl.gov/STAR/files/APS_WEBB_UE_0.pdf