Review of Transversity and Rellum Systematics
This is a summary of methods used at estimating systematic uncertainties for previous A_LL measurements. The information was obtained from the following theses:
TPC Calibration Run 12 UU (pass 1): bbcx+bbcbb
Results from Run 12 UU pass 1 TPC calibration using:
root -l 'Calib_SC_GL.C+("Run12_UU/pass1/input.dat",0,"bbcx+bbcbb")'
FMS Meeting 07/14/2014 --FMS inlcusive pi0 A_N vs E and pT
Last time I proposed to calculate signal/bkg. fraction run-by-run. Since now the raw asymmtries is caluclated fill-by-fill, here I compare the signal/bkg.
EEMC Cal-07-14-2014
Fitting the Pre& Post shower
Criteria for the bad fit from Scott:
1. Error of MPV/MPV > 0.5. (Label as sigL.)
TPC Calibration Run 12 UU (pass 1):All
Results from Run 12 UU pass 1 TPC calibration using:
root -l 'Calib_SC_GL.C+("Run12_UU/pass1/input.dat")'
TPC Calibration Run 12 UU (pass 1): bbcx
Results from Run 12 UU pass 1 TPC calibration using:
root -l 'Calib_SC_GL.C+("Run12_UU/pass1/input.dat",0,"bbcx")'
TPC Calibration Run 12 UU (pass 1): bbcx:bbcbb
Results from Run 12 UU pass 1 TPC calibration using:
root -l 'Calib_SC_GL.C+("Run12_UU/pass1/input.dat",0,"bbcx:bbcbb")'
Sti Volume Segmentation Test
Updated on Mon, 2014-07-14 10:12. Originally created by smirnovd on 2014-07-14 10:04.Without volume segmentation | With volume segmentation |
---|---|
Stephen Place CEU DNP Poster Abstract, 2014Proposed DNP CEU poster abstract. Submission deadline July ~25. v2 added based on comments from the SPIN PWG. GPC item II response for "Ridge" in d+Au: Global vs Primary track for Charge IdentificationAccording to June 5th, II GPC meeting, we analyze the global and primary tracks. In current paper status, we use the primary track. Now we are going to see how is the global track. SSD : offline reconstruction , cuts
data :
Embedding setupUpdated on Fri, 2014-07-11 12:33. Originally created by mstftsm on 2014-07-11 12:33.IST hit-track matching efficiencyUpdated on Fri, 2014-07-11 12:26. Originally created by ypwang on 2014-07-11 12:26.Simulation updateUpdated on Fri, 2014-07-11 12:08. Originally created by yfzhang on 2014-07-11 12:02.EEMC Cal-07-11-2014Compare the Pre & Post gain from MPV to those final gain post on Database. Gain from Eztree branches: Sti related check-point meetingUpdated on Fri, 2014-07-11 11:14. Originally created by jeromel on 2014-07-11 10:38. 2014-07-10 15:00
2014-07-10 16:00
America/New York
Thursday, 10 July 2014 1-189, at 19:00 (GMT), duration : 01:00 Meeting was Internal. Call for it follows Subject: Let's meet this afternoon ... ... between 3-4 PM at the usual place (1-189) and discuss what we have so far. I hope we can have some preview of the QA from SL14g, beamLine run etc ... Progress Reports for Run-15 upgradesThe status of the FMS re-installation, the FMS Preshower and the RP-phase II* will be gathered here. FMS #rho photo-production in Run-10 200 GeV AuAu ultra-peripheral eventsUpdated on Thu, 2014-07-10 23:24. Originally created by desilva on 2014-07-10 23:24. |