HFT soft effort steering meeting
TBC, at 19:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
03:20 | Energy Loss Test with Sti (July 23) ( 00:15 ) 0 files | Xin Dong |
03:35 | timing/cpu tests StiSst ( 00:20 ) 1 file | jonathan |
03:55 | plots of Eloss for different StiSst configs. ( 00:20 ) 1 file | jonathan |
EMC2: Electron Calibration First Look
Attached are:
- Summary slides (first)
- All fits WITH high tower geometry cut (second)
- All fits WITHOUT high tower geometry cut (third)
G3 dEstep Sanity Check
1000 Events
1 pi+ per Event
500 MeV pT (so approximately MIP energy)
IST simplified to air. IBMO + IBAM, and that is it.
Run-11 Transverse Jets: Transverse Momentum Shifts, Part 1 (Full Embedding)
Table 1: Particle-jet pT Shifts
PT BIN [GeV/c] | VPDMB
T0 using HFT - Run14 - new TPC alignmentThis is the first attempt at using HFT to provide a more precise T0. AOBSpeaker : All ( All )Talk time : 12:40, Duration : 00:20 Sti/geometry progressUpdated on Wed, 2014-07-30 10:47 by smirnovd. Originally created by testadmin on 2014-07-30 10:07.Speaker : Dmitri Smirnov ( BNL )Talk time : 12:20, Duration : 00:20 See blog entry: Sti vs Geant Energy Loss Calibration status for the multiple years productions ...Updated on Wed, 2014-07-30 10:52 by genevb. Originally created by testadmin on 2014-07-30 10:06.Speaker : Gene V. Buren ( BNL )Talk time : 12:00, Duration : 00:20 Recent R&D on which calibrations have dependence:
Software and Computing Meeting 2014-07-30 12:00
2014-07-30 13:00
America/New York
Wednesday, 30 July 2014 1-189, SRN, at 16:00 (GMT), duration : 01:00
Power spectrum in ultra-central Au+Au collisionsThis is the work of BNL Summer Intern Mamoudou Ba on the spectrum of flow harmonics in ultra-central Au+Au collisions. LPV search in central U+U collisionsThis is the work of BNL Summer Student Paul Glenn working with Hui Wang and Paul Sorensen. Lumi in 2009Updated on Sun, 2014-08-03 14:07 by jchw. Originally created by yipkin on 2014-07-30 09:35.EEMC Cal Run9-07-29-2014Preliminary Pre&PostShower analysis: Using the SMD I get before, as well as the ideal tower gain, I try to calibrate the pre & post shower with SMD & Tower cuts. FPS TUFF CCA JUL 29 2014Updated on Tue, 2014-07-29 19:21. Originally created by protected on 2014-07-29 19:21.
-- Layout in progress ~ 25% complete. -- Updated power input conditioning. - Mainly the 6v DC in Run-11 Transverse Jets: Additional EmbeddingI have supplemented the existing embedding sample with more statistics at lower partonic pT. Special STAR Management Meeting 2014-08-01 11:00
2014-08-01 12:00
America/New York
Friday, 1 August 2014 SeeVogh #ID: 702 2166, room 1-189, at 15:00 (GMT), duration : 01:00 Agenda: 1) report on users disk space allocation (Olga) 2) LRP town meeting (Paul) 3) committee on collaboration meeting program, committee on p+p/pA upgrade program in 2020+? BES II third year discussions? anything formal? 4) new institutions 5) discussions on Pb/Au, lighter system and run ordering for run15 6) other items? Thanks! Zhangbu
|