Hot BEMC towers in jet reconstruction
To simply study the impact of hot tower on the jet finding, I pick up 50 runs ( 0.6M events) to see the difference of the jet and W yields before and after masking out the towers.
Run-11 Transverse Jets: Preliminary Results (PANIC 2014)
Here, I post proposed data for release at PANIC 2014. The current figures are not approved and may not reflect the final presentation. This page will be updated, frequently.
Run XIII pp 500p2 (days 127-161) dE/dx. The first look.
I have checked dE/dx results for the Part 2 (days 127-161) of Run XIII pp 510 data with calibration constrants obtained in Part 1 (days 074-126).
alignment/efficiency monitoring
Updated on Fri, 2014-08-08 12:38. Originally created by malong on 2014-08-08 12:38.Reference
Speaker : Long Ma
Talk time : 14:30, Duration : 00:20
IST software update -- slow simulator integration
Updated on Fri, 2014-08-08 12:46. Originally created by ypwang on 2014-08-08 11:47.Reference
Speaker : Yaping
Talk time : 14:10, Duration : 00:20
The chip status table detail can be found at:
https://drupal.star.bnl.gov/STAR/system/files/istChipStatusTable_Yaping_20140804_0.pdf
Masking and Alignment updates
Updated on Fri, 2014-08-08 11:40. Originally created by mlomnitz on 2014-08-08 11:35.StiSst update
Updated on Fri, 2014-08-08 10:06. Originally created by bouchet on 2014-08-08 10:06.Some simple tests of the efficiency results for finding direct gamma cross sections
In the attachment
August 8th W meeting , embedding QA + data by zdcx
Embedding done expect for 34 runs with more daq files. Have a glance at the QA sample at the attached slides.
Det_efficiency
Aug. 14, 2014
IST sensor efficiency
(empty sensors are excluded, bad ones are not rejected)
(empty sensors are excluded, bad ones are not rejected)
Run-11 Transverse Jets: Trigger Bias
Follow-up Notes (August 12, 2014)
After some discussions offline, I thought it useful to post some follow-up notes.