Run22 Trigger Rates
Updated on Wed, 2021-10-20 08:27. Originally created by akio on 2021-10-20 08:27.Reference
Speaker : Akio
Talk time : 12:00, Duration : 00:20
3GeV_Proton_Cumulants_Long_Paper_Webpage
Updated on Tue, 2023-02-21 21:17. Originally created by yuzhang1 on 2021-10-20 06:37.Global polarization at 19.6 GeV
Updated on Wed, 2021-10-20 07:40. Originally created by alpatov on 2021-10-20 03:28.QA Board Meeting
Updated on Fri, 2021-10-29 12:47. Originally created by tinglin on 2021-10-20 01:44.https://bnl.zoomgov.com/j/1618435669?pwd=L3B6M3JKcjRFMVFxQTNhaEdBdkZ5UT09, at 16:00 (GMT), duration : 01:00
1. 19.6 GeV Run-by-Run QA:
Comments:
1). RunID 450 to 500, the jump in eta/phi plot likely due to the RDO problems during this runing period.
2). At the beginning of the run, the beam is not centered, so there is shift in eta;
Things to do:
1). Compare the bad run-list to those points that outside the normal ranges, see if there is plotting issues;
2). Check the RunLog to find out the possible reasons for the bad runs;
3). Check other variables like Q;
4). Change the tolerance from 5sigma to 3sigma, to check the sensitivity of cuts.
Conclusion:
Need to do some checks, but the run list after this QA is good enough for centrality.
2. Summary of the variables from different working group
https://drupal.star.bnl.gov/STAR/pwg/common/bes-ii-run-qa
3. Discussion:
1). Centrality group is fine with using DCA, but will also monitor the sDCA. May change DCA to sDCA after having a good understanding of this variable.2). Yu Hu will update the code in Github.
3) We are 80% of the way through 14.6 GeV production. 14.6 GeV QA will start ASAP after the data production is done.
4) For FXT run QA, need a few changes eg. need to change RefMult to number of primary tracks, shift vr cuts. Each working group should think about the changes on QA.
Time | Talk | Presenter |
---|---|---|
12:00 | Run QA Progress ( 00:20 ) 0 files | Ashik |
12:20 | Classification of Different QA Variables proposed by PWGs ( 00:20 ) 0 files | Rongrong Ma |
12:20 | Run-by-run QA for centrality determination in Au$+$Au Collisions at BES-II 19.6 GeV (First Look) ( 00:20 ) 1 file |
QA Board Meeting
Updated on Fri, 2021-10-22 23:04. Originally created by tinglin on 2021-10-20 01:44.https://bnl.zoomgov.com/j/1618435669?pwd=L3B6M3JKcjRFMVFxQTNhaEdBdkZ5UT09, at 16:00 (GMT), duration : 01:00
Agenda:
1. List of variables from each working group to do this QA:
Daniel: centrality.
Chenliang: LF
Ashish: bulk cor,
Ashik: FCV
Kaifeng: HF
Tong: jet cor
A brief minutes for today's meeting:
https://drupal.star.bnl.gov/STAR/event/2021/10/22/qa-board-meeting
1. Centrality:
We have good agreement for centrality QA: 1. No pile-up cuts (like TOFMatch cut); 2. Lower nhits cut to 10; 3. Power pT cuts to 60 MeV. So the list of cuts and variables:
Cut used:
145 #MAX_AbsVz [cm] this is max |Vz|
145 #MAX_Vz [cm] this is max |Vz|
-145 #MIN_Vz [cm] this is max |Vz|
2 #MAX_Vr [cm]
10 #MAX_nHitsFit
3 #MAX_gDCA [cm]
0.06 #MIN_pT [GeV]
2 #MAX_pT [GeV]
Variables:
<RefMult>
<eta>
<phi>
<DCA>
dEdx
2. LF group:
Use the same cut as centrality, additional variables:
Event level: Mean Number of primary tracks, Mean bToFMult (number of btof hits)
Primary Track: Mean pT, Mean bToF 1/beta.
3. CF group:
same as LF group, with additional variables:
Mean of sDCAxy, Mean of sDCAxy RMS, <tofmatched>, <Bbc> , <Zdc> , <Nhitsfit>
4. FCV group:
additional variables:
Q1 and Q2 (x,y TPC EPD BBC ZDC), EPD east hits, EPD west hits.
5. HF group:
additional variables:
VPD hits east, VPD hits west, bTofYLocal, bTofZLocal, eTof Delta X, eTof Delta Y, eTof Hits, eTof 1/Beta, number of MTD hits, number of MTD hits matched with TPC tracks
6. Jet Corr:
additional variables:
EMC cuts: average hit energy, number of bad towers from database;
Jet QA: jet pt, number of jets, eta, phi. Maybe should working with SpinGroup for pp runs in the next few years.
QA for centrality should start as soon as possible, check the setup with people from centrality group (Grigory). While for those that is specific for different working groups, will need to work with different groups to make things working.
Time | Talk | Presenter |
---|---|---|
12:20 | LFSUPC QA variables ( 00:10 ) 1 file | Chenliang Jin |
12:30 | QA variables from HF pwg ( 00:20 ) 1 file | Kaifeng Shen |
12:50 | QA_observables_CF ( 00:10 ) 1 file | Ashish Pandav |
Δdv1odd/dy for pions, kaons and protons in Au+Au collisions at 27GeV
Updated on Tue, 2021-10-19 19:13. Originally created by adash on 2021-10-19 19:11.Long small system flow paper
Updated on Tue, 2021-10-19 18:56. Originally created by slhuang on 2021-10-19 18:56.
FCV-paper proposal: observation of the nuclear octupole collectivity in relativistic isobar collisions at STAR
Updated on Tue, 2021-10-19 17:41. Originally created by chunjian on 2021-10-19 17:41.
AOB
Updated on Tue, 2021-10-19 17:22. Originally created by dongx on 2021-10-19 17:22.Calibration and Library Status
Updated on Tue, 2021-10-19 17:21. Originally created by dongx on 2021-10-19 17:21.Reference
Speaker : All
Talk time : 12:30, Duration : 00:15
- Calibration status (14.5 GeV, FXT)
- SL21d? (PR#170, PR#161, PR#160 etc.)
Status and Plans for Forward Upgrade Systems Software
Updated on Wed, 2021-10-20 10:57 by jdb. Originally created by dongx on 2021-10-19 17:10.Reference
Speaker : Daniel Brandenburg
Talk time : 12:00, Duration : 00:30
Run 21 EPD Calibrations for d+Au Days 185 to 188
Updated on Tue, 2021-10-19 17:07. Originally created by cracz on 2021-10-19 17:07.NOTE THAT TILE (WEST, PP02, TT04) IS MISSING IN ALL FOUR DAYS! This is marked in each nMIP file for each day.
Updated Presentation for the Diffusivity of Light Quarks
Updated on Tue, 2021-10-19 12:50. Originally created by westfall on 2021-10-19 12:50.This presentation has information about our work on the diffusivity of light quarks.
Updates on dielectron raw signal results at very low pT
Updated on Tue, 2021-10-19 09:19. Originally created by kshen on 2021-10-19 09:19.Speaker : Kaifeng Shen
Talk time : 09:40, Duration : 00:20
Update about the dimuon production at low pT
Updated on Tue, 2021-10-19 08:31. Originally created by zj1994 on 2021-10-19 08:31.Speaker : Jian Zhou
Talk time : 09:20, Duration : 00:20
FWD Software commissioning plan Oct-2021
Updated on Tue, 2021-10-19 07:26. Originally created by jdb on 2021-10-19 07:26.Speaker : Daniel Brandenburg
Talk time : 07:30, Duration : 00:20
Correlation-Function2
Updated on Mon, 2022-08-22 19:00. Originally created by fuchuan on 2021-10-19 05:48.A Brief Summary of FastOffline and Offline QA
Updated on Mon, 2021-10-18 23:57. Originally created by genevb on 2021-10-18 23:57.I was asked to talk on this subject at today's meeting on Forward subsystems, so I put a few slides together.
check on the pairEffAcc systematic uncertainties, flat vs CKTSum
Updated on Mon, 2021-10-18 22:33. Originally created by zye20 on 2021-10-18 22:29.Speaker : Zaochen Ye ( Rice university )
Talk time : 09:00, Duration : 00:20
- Compared the pairEff and pairAcc calculated with "flat pt-mass" or with "CKTSum pt-mass"