20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_notInPi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_notInPi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

20080707_pp06l2gPre1lt5MeV__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

Overview for generating EEMC pedestals and status tables

Under:

This is an informal overview of the 'philosophy' used to generate pedestals and status tables for the STAR endcap EMC, a

10) SMD-P gain equalization , ver 1.1

Under:

Goal : predict BSMD-P relative gain corrections for every eta bin 

Method : find average slope per eta slice, fit gauss, determine average slope : avrSlope(iEta)

Disc. item 3: Makeup/schedule for Standing Technical Committee

Speaker : all


Talk time : 15:20, Duration : 00:30

Disc. item 2: Commissioning & Testing needs of Sub systems

Speaker : all


Talk time : 14:50, Duration : 00:30

Disc. item 2: Commissioning & Testing needs of Sub systems

Speaker : all


Talk time : 14:50, Duration : 00:30

Discussion Item 1: Assembly/maintanance space needs of

Speaker : all


Talk time : 14:20, Duration : 00:30

Further discussion of Strawman Int. plans/Schedules

Speaker : all


Talk time : 14:00, Duration : 00:20

Discussion

Strawman for Integration plans/Schedules

Speaker : Bernd Surrow ( MIT )


Talk time : 11:00, Duration : 00:20

East end Real Estate for HFT installation

Speaker : Howard Wieman ( LBNL )


Talk time : 10:40, Duration : 00:20

Cone Mechanical/Integration

Speaker : Eric Andersen


Talk time : 10:20, Duration : 00:20

FGT West Support Cone E-field calculations

Speaker : Dick Majka


Talk time : 10:00, Duration : 00:20

Mech. design of support struct. & Triple GEM detectors FGT

Speaker : Jim Kelsey ( MIT )


Talk time : 09:40, Duration : 00:20

General req. on space & Dead Material including schedule FGT

Speaker : Jan Balewski


Talk time : 09:20, Duration : 00:20

 Bernd show most of the slides from 

Here are my slides as PDF

Radiation measurements from run9

Speaker : Howard Matis


Talk time : 09:10, Duration : 00:10

Discussion on plans for rad measurements in the upcoming run

Welcome and review of Agenda

Speaker : Bill Christie ( BNL )


Talk time : 09:00, Duration : 00:10

Star Integration meeting

2008-07-23 00:00
Etc/GMT-5
Wednesday, 23 July 2008
Star exp conference room at 1006, at 04:00 (GMT), duration : 00:00
Meeting to discuss progress in defined envelope of future STAR upgrades
TimeTalkPresenter
09:00Welcome and review of Agenda ( 00:10 ) 0 filesBill Christie (BNL)
09:10Radiation measurements from run9 ( 00:10 ) 1 fileHoward Matis
09:20General req. on space & Dead Material including schedule FGT ( 00:20 ) 0 filesJan Balewski
09:40Mech. design of support struct. & Triple GEM detectors FGT ( 00:20 ) 0 filesJim Kelsey (MIT)
10:00FGT West Support Cone E-field calculations ( 00:20 ) 2 filesDick Majka
10:20Cone Mechanical/Integration ( 00:20 ) 1 fileEric Andersen
10:40East end Real Estate for HFT installation ( 00:20 ) 1 fileHoward Wieman (LBNL)
11:00Strawman for Integration plans/Schedules ( 00:20 ) 0 filesBernd Surrow (MIT)
14:00Further discussion of Strawman Int. plans/Schedules ( 00:20 ) 0 filesall
14:20Discussion Item 1: Assembly/maintanance space needs of ( 00:30 ) 0 filesall
14:50 Disc. item 2: Commissioning & Testing needs of Sub systems ( 00:30 ) 0 filesall
14:50 Disc. item 2: Commissioning & Testing needs of Sub systems ( 00:30 ) 0 filesall
15:20Disc. item 3: Makeup/schedule for Standing Technical Committee ( 00:30 ) 0 filesall

QA part II (Low Luminosity)

I have analysed the  "Low Luminosity"  production P08ic  (without any cuts) that was just produced with SVT+SSD+TPC and TPC only:

 

13) ver 1.2 : SMD-E, -P, status & relative gains, no Crate4

Under:

Automatic BSMD-E, -P   relative calibration and status tables. 

The second pass through both SMDE, SMDP was performed, learning from previous mistakes.

Main changes: