20080906_bgJetsPre1lt0_01__20080905_gJetPre1lt0_01__20080906_pp06lPre1lt0_01__counts_deltaMaxFitResidualUV_pt1gt7pt2gt5_noPi0Cut

20080906_bgJetsPre1lt0_01__20080905_gJetPre1lt0_01__20080906_pp06lPre1lt0_01__counts_deltaMaxFitResidualUV_pt1gt7pt2gt5_noPi0Cut

Embedding status

Analysis issues in Year8, things to worry about ...

Vertex finder evaluation studies

Speaker : Rosi Reed & Akio Ogawa ( UCDavis & BNL )


Talk time : 09:15, Duration : 00:30

Production summary for Year7/Year8

BTOW calib 2008 w/ pi0 (by Alan)

 

 INPUT: 

  • Run=9047029
  • ideal gains
  • db status tables, peds
  • trigID=220520 = bht2-mb

Pio selection cuts:

TPC Phone Meeting

2008-09-08 15:40
2008-09-08 16:40
Etc/GMT-4
Monday, 8 September 2008
Phone, at 19:40 (GMT), duration : 01:00

Study of ET Correction Factor Gaussian Fit

ET Correction Factor Study using Gaussian Fits

 

Comparison between PPV revision 1.29 and track pT change

Under:

This compares the effiiciency of the current PPV vertex finder (revision 1.29 which includes PCT fix) to the suggested change of including tracks with 0.1 GeV < pT < 0.2 GeV to the algorithim

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L2 Trigger

There are 40482 Events in this analysis.  These are only the Upsilon 1S files and combine both trigger 117602 and 137602 together.  Since the L0 trigger has to have fired for the L2 trigg

Hard-pT 3to4 events in 2005 pT Shifts

 

GEANT tricks

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Acceptance

Using file list found here:

/home/rjreed/CurrentUpsTriggerEfficiency/upsilon1s600SeriesGeantRootFiles.list

2005 Inclusive Jet pT Shifts and Trigger/Reconstruction Bias TAKE 2

 

Anthony SQM talk overview

Speaker : Anthony Timmins


Talk time : 15:30, Duration : 00:59

Coffee Break

QM2009 analysis plans

Speaker : Jun Takahashi, everybody


Talk time : 14:10, Duration : 00:59

Welcome, and general overview

Speaker : Jun Takahashi


Talk time : 14:00, Duration : 00:10

Strangeness Parallel Session

TimeTalkPresenter
14:00Welcome, and general overview ( 00:10 ) 0 filesJun Takahashi
14:10QM2009 analysis plans ( 00:59 ) 0 filesJun Takahashi, everybody
15:30Anthony SQM talk overview ( 00:59 ) 0 filesAnthony Timmins

Minutes


Talk time : 14:20, Duration : 00:20

News:

1) HFT Tracking Workshop at LBL re-scheduled for November.  Not exact date yet

2) Selected dates from tentative CD1 review schedule (preliminary) will be posted to group