Data Jet Distributions in Eta and Pt with Vertex Cut ( |vz| < 60 cm) for Fill 7847
Updated on Wed, 2008-09-10 12:24. Originally created by cjones on 2008-09-10 12:24.Quadrupole analysis: the implications for physics and the latest hydro predictions (15+15)
Updated on Mon, 2008-10-06 14:10 by ray. Originally created by barannik on 2008-09-10 10:46.Reference
Speaker : Lanny Ray
Talk time : 15:30, Duration : 00:30
Quadrupole analysis: technique and results (20+5)
Updated on Wed, 2008-10-08 17:17 by dkettler. Originally created by barannik on 2008-09-10 10:44.Reference
Speaker : David Kettler
Talk time : 15:05, Duration : 00:25
Flow measurements and hints of incomplete thermalization (20+15)
Updated on Sat, 2008-09-27 14:01 by aihong. Originally created by barannik on 2008-09-10 10:41.Reference
Speaker : Aihong Tang
Talk time : 14:30, Duration : 00:35
Effects of eccentricity fluctuations and nonflow on elliptic flow methods (15+15)
Updated on Mon, 2008-09-29 15:13 by posk. Originally created by barannik on 2008-09-10 10:40.Reference
Speaker : Art Poskanzer ( LBNL )
Talk time : 14:00, Duration : 00:30
The status of flow measurements (15+15)
Updated on Mon, 2008-09-29 19:56 by voloshin. Originally created by barannik on 2008-09-10 10:38.Reference
Speaker : Sergei Voloshin
Talk time : 13:30, Duration : 00:30
Planning for efficient data transfer
Updated on Wed, 2008-09-10 10:57 by zer0. Originally created by jeromel on 2008-09-10 09:44.Speaker : Michal Zerola ( NPI/ASCR )
Talk time : 12:40, Duration : 00:20
DAQ event filtering
Updated on Wed, 2008-09-10 11:23 by fine. Originally created by jeromel on 2008-09-10 09:40.Speaker : Valeri Fine ( BNL )
Talk time : 12:20, Duration : 00:20
The goal: Produce smaller ".daq file" containing only events of giving events ID.
Post Crossing track cuts and flag
Updated on Wed, 2008-09-10 09:58 by testadmin. Originally created by jeromel on 2008-09-10 09:38.Speaker : Akio Ogawa ( BNL )
Talk time : 12:00, Duration : 00:20
See Akio's page Post Crossing Track Cuts
Software and Computing phone meeting
Updated on Wed, 2008-09-10 09:35 by testadmin. Originally created by jeromel on 2008-09-10 09:35. 2008-09-10 12:00
Etc/GMT-5
Wednesday, 10 September 2008
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 00:00
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
12:00 | Post Crossing track cuts and flag ( 00:20 ) 0 files | Akio Ogawa (BNL) |
12:20 | DAQ event filtering ( 00:20 ) 0 files | Valeri Fine (BNL) |
12:40 | Planning for efficient data transfer ( 00:20 ) 1 file | Michal Zerola (NPI/ASCR) |
Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Acceptance 2
Updated on Wed, 2008-09-10 15:02. Originally created by rjreed on 2008-09-09 23:07.Geometric acceptance was originally found to be much higher, ~0.5
pp2pp
Updated on Tue, 2008-09-09 15:48. Originally created by gorbunov on 2008-09-09 15:48.Reference
Speaker : Wlodek Guryn
Talk time : 14:45, Duration : 00:20
Status of 4-prong analysis
Updated on Tue, 2008-09-09 15:46. Originally created by gorbunov on 2008-09-09 15:45.Reference
Speaker : Boris Grube
Talk time : 14:25, Duration : 00:20
Status of the current analysis
Updated on Tue, 2008-09-09 15:44. Originally created by gorbunov on 2008-09-09 15:44.Reference
Speaker : Yury Gorbunov
Talk time : 14:05, Duration : 00:20
Welcome and general overview
Updated on Tue, 2008-09-09 15:43. Originally created by gorbunov on 2008-09-09 15:43.Reference
Speaker : Yury Gorbunov
Talk time : 14:00, Duration : 00:05
UPC Parallel Session
Updated on Tue, 2008-09-09 15:41. Originally created by gorbunov on 2008-09-09 15:41.Time | Talk | Presenter |
---|---|---|
14:00 | Welcome and general overview ( 00:05 ) 0 files | Yury Gorbunov |
14:05 | Status of the current analysis ( 00:20 ) 0 files | Yury Gorbunov |
14:25 | Status of 4-prong analysis ( 00:20 ) 0 files | Boris Grube |
14:45 | pp2pp ( 00:20 ) 0 files | Wlodek Guryn |
EMC calib accuracy for W program
Updated on Fri, 2008-09-26 14:03. Originally created by balewski on 2008-09-09 14:47.My thoughts about necessary calibration accuracy for a successful W program at STAR
2008.09.09 Maximum sided residual with shower shapes sorted by uv- and pre-shower bins
Ilya Selyuzhenkov September 09, 2008
Data sets: