SVT review data samples, overview

Speaker : Moi ( BNL )


Talk time : 12:30, Duration : 00:10

We will revisit the agenda You do not have access to view this node and especially You do not have access to view this node

Track parameters extension & vertex errors - proposal

Speaker : Yuri Fisyak ( BNL )


Talk time : 12:20, Duration : 00:10

Results from Cu+Cu vertex finding

Speaker : Anthony Timmins ( BHAM )


Talk time : 12:10, Duration : 00:10

Anthony has a page at
http://www.star.bnl.gov/protected/strange/atimmins/PileUpCuCu200GeV4/FakeVertexRanking.htm

News from the front

Speaker : Hal Spinka ( ANL )


Talk time : 12:00, Duration : 00:10

CuCu data sample production time estimates from 200605

Under:
CuCu data sample production time estimates from 200605

non-femtoscopic correlations in PYTHIA

Speaker : Zbigniew Chajecki ( OSU )


Talk time : 10:40, Duration : 00:10


http://www.star.bnl.gov/protected/hbt/chajecki/meetings/2006/0512/pythia_SH.gif

HQ06 - pp vs heavy-ions

Speaker : Zbigniew Chajecki ( OSU )


Talk time : 10:30, Duration : 00:10

http://www.star.bnl.gov/protected/hbt/chajecki/talks/hq2006/

Progress forward, missing code components

Speaker : All


Talk time : 15:00, Duration : 00:10

Self-Alignement discussion

Speaker : Victor Perevoztchikov ( BNL )


Talk time : 14:50, Duration : 00:10

Status and answers

Self-Alignement discussion

Speaker : Christine Nattrass ( Yale )


Talk time : 14:40, Duration : 00:10

Concerns and questions.

Geometry and Drift calibration status

Speaker : Spiros Margetis ( KSU )


Talk time : 14:30, Duration : 00:10

Production samples, statistics, time etc ...

Speaker : Jerome Lauret


Talk time : 15:40, Duration : 00:10
We would need to revisit all production requests and associate time and priorities for each of them. Estimates will be provided for the real data samples.

The numbers below were determined based on RealTime extraction

GatedGrid polarity test for GridLeak

Under:
On May 9-10, 2006, a test was performed where we reversed the polarity of the Gated Grid as shown in the top of Fig.3 in the GridLeak Simulations ["inverted" mode] for the west side of the TPC. Here are the results of that test.

Z-dependence

Below are plots of the distortion gap (as measured by track residuals) as a function of Z for normal runs (71290[234]*, 57 files) and test runs with the west GG reversed (71290[56]*, 39 files). Here one can see the slight improvement caused by reversing the polarity. At this time I have no explanation for why the distortion seems to abate near the central membrane (the distorting field should abate because of the boundary conditions, but the distortion is an integral in Z over this field).

Normal:
West reversed:

West/East Ratio

Using a linear fit to the distortion as a function of |Z| as a measure of the amount of leaked ions (distortion scales linearly with Z and with leaked current), I can take the ratio of the west side to east side to see if anything changed with the test. I find that the test appears to show a visible decrease of about 2-3% in the ion leakage, as seen in the following (normalized) histograms. I had more files available when I made this plot (70 normal, 69 reversed test files), and only fit over the range 25cm<|Z|<150cm.


Gene Van Buren
gene@bnl.gov

pp200 (2006)

Under:

Self-alignment and how to move forward

Speaker : Victor, Christine, all


Talk time : 15:20, Duration : 00:10
Status, what is realistic to get from now and then, how to best optimize manpower and time to reach a conclusion on feasability??

It would be really great to be able to show this approach can be

Calibration adjustment and recent changes

Speaker : Yuri Fisyak


Talk time : 15:10, Duration : 00:10

Where are we, are we misisng db entries, what timestamp? Geometry?

Status and readiness of the code

Speaker : All


Talk time : 15:00, Duration : 00:10
Are we missing components, are we all ready to go??
  1. Simulation reconstruction?
  2. Real data reconstruction?

SVT/SSD Review Coordination meeting 6

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meetings available at
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]
  4. [node:2299]
  5. [node:2298]
TimeTalkPresenter
15:00Status and readiness of the code ( 00:10 ) 0 filesAll
15:10Calibration adjustment and recent changes ( 00:10 ) 0 filesYuri Fisyak
15:20Self-alignment and how to move forward ( 00:10 ) 0 filesVictor, Christine, all
15:40Production samples, statistics, time etc ... ( 00:10 ) 0 filesJerome Lauret

SVT/SSD Review Coordination meeting 4

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meeting reference
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]

This meeting was restricted to discuss technical issues and show stoppers we may have had still. Topics included

  • Self-alignment progress / where are we (Victor)
  • Drift velocity (Yuri)
  • track ID issue ? Vertex issue ? (All)
  • Overview of other activities (Spiros)

SVT/SSD Review Coordination meeting 5

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meetings are available at
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]
  4. [node:2299]
TimeTalkPresenter
14:30Geometry and Drift calibration status ( 00:10 ) 1 fileSpiros Margetis (KSU)
14:40Self-Alignement discussion ( 00:10 ) 0 filesChristine Nattrass (Yale)
14:50Self-Alignement discussion ( 00:10 ) 0 filesVictor Perevoztchikov (BNL)
15:00Progress forward, missing code components ( 00:10 ) 0 filesAll