StGammaPointMaker
Updated on Wed, 2007-11-07 11:12. Originally created by ahoffman on 2007-11-07 10:56.I have been working on developing a point maker to work in conjunction with StGammaMaker. The idea (from my end) was that you would input gamma candidates to the point maker and you would get ou
Anything Else
Updated on Tue, 2007-11-06 14:33. Originally created by matis on 2007-11-06 14:33.Reference
Talk time : 01:20, Duration : 00:20
Status report on simulation
Updated on Wed, 2007-11-07 09:23 by bouchet. Originally created by matis on 2007-11-06 14:30.What's next?
Updated on Tue, 2007-11-06 14:29. Originally created by matis on 2007-11-06 14:29.Reference
Talk time : 00:20, Duration : 00:20
The SSD Proposal has been Submitted
Updated on Tue, 2007-11-06 14:33. Originally created by matis on 2007-11-06 14:29.Reference
Talk time : 01:00, Duration : 00:20
Summary of Technical Details for Run 5 analysis
Updated on Tue, 2007-11-06 14:31. Originally created by kocolosk on 2007-11-06 13:31.Data Collection
- MB || JP1 || JP2
- BBC timebin in {7, 8, 9} -- roughly equivalent to 60 cm offline vertex cut (see BBC Vertex)
Conformal String Breaking in QCD: Dima Kharzeev
Updated on Mon, 2007-11-05 21:18. Originally created by psoren on 2007-11-05 21:18.I'm attaching a pdf of the talk given by Dima Kharzeev and sent to the BES list by Helen Caines:
http://www.star.bnl.gov/HyperNews-star/protected/get/bescan/26/1/2.html
Radiation estimates for TOF rings
Updated on Mon, 2007-11-05 12:14. Originally created by psoren on 2007-11-05 12:14.Here I give rough estimates for the radiation we can expect for the inner ring on the currently considered forward TOF rings. Rates are taken from run 7.
2007 BEMC Calibration check with stgamma production electrons
Updated on Mon, 2007-11-05 12:41. Originally created by mattheww on 2007-11-05 11:15.To perform a check on the BEMC calibration for run 7, I began by looking over the electrons from the StGamma production.
Action items from last week
Updated on Mon, 2007-11-05 10:30. Originally created by lbarnby on 2007-11-05 10:30.Reference
Speaker : All
Talk time : 00:45, Duration : 00:10
Follow up on any of last weeks action items
Abridged from minutes:
Embedding requests and priority
Updated on Mon, 2007-11-05 10:25. Originally created by lbarnby on 2007-11-05 10:25.Reference
Speaker : Lee
Talk time : 00:40, Duration : 00:05
We have the following requests active or in the pipeline:
QM Poster Abstracts - Last Chance
Updated on Mon, 2007-11-05 10:16. Originally created by lbarnby on 2007-11-05 10:16.Reference
Speaker : Lee, Dhevan
Talk time : 00:35, Duration : 00:05
QM extended the deadline to November 8th so there could be a last chance for anyone considering a poster abstract.
20 GeV New production QA
Updated on Mon, 2007-11-05 10:08. Originally created by lbarnby on 2007-11-05 10:08.Reference
Speaker : Helen (not available) ( Yale )
Talk time : 00:25, Duration : 00:10
Helen can't make it but we can still discuss the plots she posted
Ridge in 62 GeV Au
Updated on Mon, 2007-11-05 10:04. Originally created by lbarnby on 2007-11-05 09:59.Reference
Speaker : Christine ( Yale )
Talk time : 00:10, Duration : 00:15
See:
First Look 62 GeV Cu V0
Updated on Mon, 2007-11-05 09:54. Originally created by lbarnby on 2007-11-05 09:54.Reference
Speaker : Pan Pan ( Yale )
Talk time : 00:00, Duration : 00:10
See:
http://rhig.physics.yale.edu/~fan/V0SpectraUpdateOct25.html
Generic Software Coordinator
General Position Description: detector sub-system software coordinator
Analysis Coordinator
STAR Physics Analysis Coordinator
Responsibilities:
1) To work with the physics working group convenors and as appropriate the Software and Computing Project Leader, Simulations L
Calibration Coordinator
Position and responsibilities Description: Calibration coordinator