Run6T FPD Energy Scale Correction Update

Run6T FPD Energy Scale Correction Update

 

database monitor scheme

database monitor scheme

db intro diagrams

db intro diagrams

TPC Sector Alignment QA

The TPC sector alignment (SA) 2009 calibration was performed using low luminosity data, which reduces distortions from pile-up tracks and space charge accumulation.

Hadron09 Proceedings "Hadron Spectroscopy in DPE Processes with the STAR Detectors at RHIC"

  

High p_T Workshop Talk

Paper proposal - W Asymmetry PRL paper - Run 9

Title: Measurement of the parity violating longitudinal single-spin asymmetry for $W^{\pm}$&nbs

preparation for TDR, WBS and near term plans


Talk time : 14:30, Duration : 00:30

Documentation- storage and control


Talk time : 14:00, Duration : 00:30

 Adept, web server, control documents

Grounding plans


Talk time : 13:30, Duration : 00:30

Integration - interface specifications


Talk time : 11:00, Duration : 01:00

Overflow if need be


Talk time : 10:30, Duration : 00:30

HFT management


Talk time : 09:00, Duration : 01:30

HFT bi-monthly- day 2

2010-03-11
America/New York
Thursday, 11 March 2010
2-84 BNL, at 14:00 (GMT), duration : 00:00
TimeTalkPresenter
09:00HFT management ( 01:30 ) 1 file
10:30Overflow if need be ( 00:30 ) 2 files
11:00Integration - interface specifications ( 01:00 ) 4 files
13:30Grounding plans ( 00:30 ) 0 files
14:00Documentation- storage and control ( 00:30 ) 4 files
14:30preparation for TDR, WBS and near term plans ( 00:30 ) 0 files

CD-1 response and Software plans

Speaker : S.Margetis


Talk time : 16:20, Duration : 00:40

HFT-FGT integration issues

Speaker : J.Bessuille


Talk time : 15:50, Duration : 00:30

D.Beavis

Speaker : Beampipe - Safety ( BNL )


Talk time : 15:20, Duration : 00:30

BREAK


Talk time : 15:00, Duration : 00:20

IDS and integration

Speaker : E.Anderssen ( LBNL )


Talk time : 14:30, Duration : 00:30

SSD upgrade

Speaker : M.LeVine ( BNL )


Talk time : 13:45, Duration : 00:45