Forward Tracking

Speaker : Nikolai ( Yale )


Talk time : 10:30, Duration : 00:20

Forward EMC

Speaker : Oleg Tsai ( UCLA )


Talk time : 09:30, Duration : 00:20

MB luminosity dependent EMC tower multiplicity with threshold

  To study luminosity dependent BEMC/EEMC tower multiplicity with minimum bias (MB) data .

Very Forward Proposal and THICK GEM Status

Two files:  Very Forward Proposal and THICK GEM Status

Run 6 variable fit parameters as functions of PT

 Again, same plots as from run 9 but for run 6.

 

Run 6 PT bin fits

 These are the same plots as for run 9, but for run 6. The pion location is clearly around the accepted value, demonstrating the 5% difference in run 9.

TPC Hit Errors changes

For RT Ticket 2103, we would like to understand the changes in TPC hit errors which were introduced in January 2010 for the Run 9 pp500 data.

Pizza and such (Large Seminar Room Hall)

Speaker : Large Seminar Room Hall


Talk time : 18:00, Duration : 02:00

DAQ10K upgrade

Speaker : Zhangbu Xu ( BNL )


Talk time : 13:15, Duration : 00:20

Discussion of Upcoming Papers

Speaker : Stephen Trentalange


Talk time : 17:30, Duration : 00:20

WSC/ESC shroud electrical

upgrade R&D meeting

2011-03-09 09:15
America/New York
Wednesday, 9 March 2011
BNL room 2-84 PO, at 14:15 (GMT), duration : 00:00

As advertised earlier the main purpose is to have presentations, and discussion on various R&D project for the future, both for the later part of the decade and the eSTAR/EIC era.
Of particular importance are plans and ideas that fall within the STAR plans for the next decade as outlined in the decadal plan document, and the eSTAR era. This encompasses, as examples tracking, calorimetry, PID for STAR forward upgrades in the later part of the decade, and electron tracking and identification in the eSTAR era (i.e. low momentum (1-6 GeV/c) at backward rapidities.
 

The meeting will have short presentations, and there will be amble time for discussions.


Agenda


Welcome & Introduction

Oleg Tsai, UCLA
          “R&D for ScFi calorimetry andSTAR forward instrumentation upgrades"
 

Nikolai Smirnov, Yale
    “Upgrade in the Forward Direction”

Bernd Surrow, MIT
    “GEM Tracker Ideas”

Zhangbu Xu, BNL
            “DAQ10k for STAR”

Open Forum and Discussions:

Ernst Sichterman, LBNL
    “eSTAR Needs and Ideas”

 

The latter talk also forms the basis for the STAR presentations at the EIC workshop on the 11th  of March.
 

 

Speakers Please add your talks as file attachments.

 

EVO information:

Title: STAR R&D workshop
Description: upgrade meeting at BNL
Community: STAR
Password: star

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=M2MvMB2e2iD2D89e9iDM92

- Password: star
- Phone Bridge
ID: 303 7742
Password: 0952

Eastern Standard Time (-0500)
Start 2011-03-09  09:00
End   2011-03-09  20:30

Japan Standard Time (+0900)
Start 2011-03-09  23:00
End   2011-03-10  10:30

Central European Time (+0100)
Start 2011-03-09  15:00
End   2011-03-10  02:30

Pacific Standard Time (-0800)
Start 2011-03-09  06:00
End   2011-03-09  17:30


EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112

- Switzerland (CERN, Geneva)
+41 22 76 71400

- Slovakia (UPJS, Kosice)
+421 55 234 2420

- Italy (INFN, several cities)
http://server10.infn.it/video/index.php?page=telephone_numbers 
Enter '4000' to access the EVO bridge

- Germany (DESY, Hamburg)
+49 40 8998 1340

- USA (BNL, Upton, NY)
+1 631 344 6100

- United Kingdom (University of Manchester)
+44 161 306 6802

- Australia (ARCS)
+61
Adelaide  08 8463 1011
Brisbane  07 3139 0705
Canberra  02 6112 8742
Hobart    03 623 70281
Melbourne 03 8685 8362
Perth     08 6461 6718
Sydney    02 8212 4591

- Netherlands (Nikhef, Amsterdam)
+31 20 7165293
Dial '2' at the prompt

- Canada (TRIUMF, Vancouver)
+1 604 222 7700

- Czech Republic (CESNET, Prague)
+420 95 007 2386

- USA (MIT, Cambridge, MA)
+1 617 715 4691

- France (RAP, Paris)
+33 144 27 81 50

TimeTalkPresenter
09:30Forward EMC ( 00:20 ) 1 fileOleg Tsai (UCLA)
10:30Forward Tracking ( 00:20 ) 1 fileNikolai (Yale)
13:15DAQ10K upgrade ( 00:20 ) 1 fileZhangbu Xu (BNL)
13:35STAR in the eRHIC era ( 00:20 ) 1 fileErnst Sichtermann

Ultra Peripheral Collisions PWG

TimeTalkPresenter
13:30Agenda: UPC and pp2pp ( 00:10 ) 6 filesVarious

Run 11 Beam Background Study

See attached slides

EMC triggered data/simulation tower threshold studies

TOF OPS: HV_logger columns and GUI info

In the TOF Main GUI, the inner pie wedges are POSITIVE, outer wedges are NEGATIVE

in run-11, there are 49 columns in the HV log files: timestamp followed by 48 V,I values

TOF OPS: How to enable/disable o2/h2o monitoring

The small compressor is on top of the gas mixing rack (left side, small gray box).

The O2 analyzer is on top of the TOF rack (above the tofgas PC)

RSC Meeting Talk 3.4.11

QA plots for 3rd production

 Following are QA plots for the pico files processed.

Note : there is already some cuts applied to make the pico files 

EMC threshold study update