PANIC 2011 poster

Run 11 pre-Set Update

 Preliminary analysis is compleded on 51 RunSets (numbered 0-50)

 

Summary of Run 9 W reco efficiency studies

Summary of Run 9 W reco efficiency studies

HIT-by-HIT comparison between AgML and AgSTAR geometries for tag y2009c

Abstract: A hit-by-hit comparison is made with STARSIM between the AgML and AgSTAR versions of the STAR geometry.

Run 11 AuAu27 calib status

Rough summary: AuAu27 calibration quality is near that of AuAu19.6 when it was produced last month.

STAR Management Meeting

2011-07-14 11:00
2011-07-14 12:00
America/New York
Thursday, 14 July 2011
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
                Thursday, 30 June 2011
                BNL, 50-I-189, at 13:00 (GMT), duration : 01:00

              EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

              Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 3714812 // Password: 0952

              Time:  11 - 12 noon EDT

 *--===================================================================--*

  I.  Agenda:

               1) Management team status - Nu

               2) Calibration/Production Run 11 data  - Jerome/Gene

               3) FGT status - Bernd

               4) SQM abstract sunmission - Bedanga

               5) TBD

*--===================================================================--*

 II. Brief Summary and/or Action Items:

               0) Attendency: Olga, Bedanga, Jerome, Gene,Flemming, Bill, Nu

               1) New team fornext term is ready. In Council discussion.

               2) Run11 production priorities: (1) AuAu 19.6 and 27 GeV; (2) AuAu 200GeV, HT, HLT triggered; (3) pp500 GeV 50% / AuAu 200 GeV MB 50%.

               3) FGT status:   2 quardrents, with spacer-grid, end of this week, July 15th. cosmic ray test at bnl, in the week of July 18

                  // all assembly progress well //  rest of the orders are out. By Aug. 15, all 12 quadrants, all materials will be ready. // Production of

                 whole 24 quadrants will be continued till all completed, by mid-December. // Schedule: not role out the STAR till Aug. 27th. // Bill prefers to roleout,

                if we decide so, by Aug. 12th. // Bernd: develop tracking for FGT in true environment. There will be sufficient people for both // will impact next

                summer activities: fully assembly FGT, quick role in/out. // Next meeting on July 25th, after 10 am.

 III. Note:

  ► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu XU

  ► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report

*--===================================================================--*

 IV. Future Meetings and Reviews:

  ► PANIC2011, Boston, July 24 - 29, 2011.

  ► STAR Analysis Meeting, August 22-26, 2011, UC Davis

  ► SQM2011, Cracow, September 18 - 24, 2011. Deadline for abstract submission July 1, 2011.

  ► DNP, October 26-29, 2011, MSU.

  ► CPOD2011, Wuhan, November 7 - 11, 2011.

  ► STAR Collaboration Meeting, November 14 - 19, 2011, LBNL

STAR Management Meeting

2011-07-21 09:00
2011-07-21 10:00
America/New York
Thursday, 21 July 2011
BNL, 50-I-189, at 13:00 (GMT), duration : 01:00

STAR Management Meeting

2011-07-28 09:00
2011-07-28 10:00
America/New York
Thursday, 28 July 2011
BNL, 50-I-189, at 13:00 (GMT), duration : 01:00

STAR Management Meeting

2011-08-04 09:00
2011-08-04 10:00
America/New York
Thursday, 4 August 2011
BNL, 50-I-189, at 13:00 (GMT), duration : 01:00

STAR Management Meeting

2011-08-11 11:00
2011-08-11 12:00
America/New York
Thursday, 11 August 2011
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00

              EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

              Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 10 6515 // Password: 0952

              Time:  11 - 12 noon EDT

 *--===================================================================--*

  I.  Agenda:

               1) Welcome to the New Management Team - Nu

               2) Calibration/Production Run 11 data  - Jerome/Gene

               3) Deputies and their primary responsities - Nu

               4) Shift reponsibilities and Author list - Jerome

               5) STAR Analysis meeting - Xin

               6) TBD

*--===================================================================--*

 II. Brief Summary and/or Action Items:

  0) Attendency: Bedanga, Xin, Jerome, Jamie, Scott, Huan, Nu, Bill, Gene

  1) RUn11 data process: 19.6 data production will start next week

  2) Deputy Primary Responsibilities: (a) Jamie: focuses/oversees on operation related issues, e.g. preparation for BUR, shifts, and period coordinators; 

      (b) Scott: working closely with PAC, focuses on spin physics related issues including talks, proceedings and publications;

      (c) Bedanga: focuses/oversees on HI data analysis and publication related issues.

      All of us will work closely, openly among ourselves including the PAC.

     eSTAR leaders will join the management meeting once per month to discuss the progress in that direction.

  3) Shift and Author List: Jerome will prepare a pakage including the top three hit list, proposed time for the Council. We expect Ok from the    council. 

  4) Analysis Meeting: Xin will confirm the invited speakers. Nu:forward the recent online-registration info to the collaboration.

III. Note:

  ► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu XU

  ► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report

*--===================================================================--*

 IV. Future Meetings and Reviews:

  ► STAR Analysis Meeting, August 22-26, 2011, UC Davis

  ► SQM2011, Cracow, September 18 - 24, 2011. Deadline for abstract submission July 1, 2011.

  ► DNP, October 26-29, 2011, MSU.

  ► CPOD2011, Wuhan, November 7 - 11, 2011.

  ► STAR Collaboration Meeting, November 14 - 19, 2011, LBNL

STAR Management Meeting

2011-07-07 09:00
2011-07-07 10:00
America/New York
Thursday, 7 July 2011
BNL, 50-I-189, at 13:00 (GMT), duration : 01:00

calibration delivery timescale1 for Run11

Updates on the simulation

Speaker : Wlodek


Talk time : 12:50, Duration : 00:20

Finalizing the analysis...

Speaker : Kin


Talk time : 12:30, Duration : 00:20

How to estimate the systematic uncertainties

Speaker : JH


Talk time : 12:00, Duration : 00:30

20110726 PANIC11 Dijet Poster

Radius dependence of ZDC SMD asymmetry

Calibration Update

Reproducibility:

Filtered Dijet PYTHIA in pp500

Request TypeSimulated background embedding (generator with real data as background for noise / pile-up studies)
Description

This request is for trigger and partonic filtered pythia events to be embedded in zerobias events. 

There are 12 CKIN bins requests ranging from 4 - 75 partonic pT.

This request is documented in FilterTests_v2.pdf attached at the bottom of this page: http://drupal.star.bnl.gov/STAR/blog/gdwebb/2011/apr/19/embedding-comparisons-run-9-pp-500gev

Please note this geometry should be y2009g but this option is not currently available

General Information
  AV
Request ID20112801
Priority: EC0
Priority: pwgNormal
StatusQA Sample Available, producing Base QA [4/7]
Physics Working GroupSpin
Requested byrfatemi
Contact email(s)rfatemi@pa.uky.edu
Contact phone(s)
PWG email(s)starspin-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Simulated background embedding (generator with real data as background for noise / pile-up studies)
Number of events4420000 = 4.42 M
Magnetic Field---- SELECT MAGFIELD ----
Collision Typepp 500GeV
Centrality---- SELECT CENTRALITY ----
BFC tagsDbV20101215, OGGVoltErr, pp2009c, ITTF, VFPPVnoCTB, BEmcChkStat, beamLine, Corr4, OSpaceZ2, OGridLeak3D, -dstout, -evout, TpxClu, -VFMinuit, VFPPVnoCTB, beamLine, -hitfilt, Embedding, TpcMixer, GeantOut, MiniMcMk, McAna, -in, NoInput, useInTracker, nodefault, emcSim, EEfs, EEss
ProductionP09ig
Geometry: simu---- SELECT GEOMETRY ----
Geometry: recoy2009a
LibrarySL09g
Vertex optionLeave vertex to be reconstructed vertex, and use VFPPVnoCTB with beamline
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookup
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

PANIC 2011 Poster