FGT Test stand SW Meeting

2011-09-19 14:00
America/New York
Monday, 19 September 2011
EVO, at 18:00 (GMT), duration : 00:00
Title:		FGT test stand SW meeting
Description:	
Community:	STAR
Password:	fgtin2011

Meeting Access Information:
- Meeting URL
	http://evo.caltech.edu/evoNext/koala.jnlp?meeting=M2MvMB2M2iDMDi9a9MDM92

- Password: fgtin2011
- Phone Bridge
	ID: 402 6594
	Password: 9215
TimeTalkPresenter
14:00Overview ( 00:20 ) 1 fileAnselm
14:20Q&A procedure/Plots ( 00:20 ) 1 fileBernd
14:40Test stand setup mapping issues ( 00:20 ) 0 filesWayne/Steve
15:00Minutes ( 00:00 ) 1 fileStephen Gliske

my talks

my talks

analysis meetings:

STAR analysis meeting, BNL, March 15
"Probing the QCD phase diagram using intensive normalized cumulants"

FMS-EEMC systematic studies

Falsifying the padrow-by-padrow T0s

When I studied cosmic rays taken during Run 11, I looked at the z residuals and

  • genevb's blog
  • Read more
  • significance study at the highest pt bin

    I fit run4 data with Maxwell func., then integrated the function within the bin range.

    The ststistic error of the integral was obtained from IntegralError() function of TF1.

    Minutes


    Talk time : 13:55, Duration : 00:01

    FGT Quadrant Status, Sept. 16, 2011

    Quadrants summary

    **********************

    Good quadrants, complete or in progress:

    -Quadrants 7-11, and 13 (6 quadrants) are at BNL.

    FGT HV Auto-reset Controls

     

    FGT - Status Update

    Theta vs coordinates plot (without Igor's corrections and no kicker subtraction)

    The following are the theta vs coordinate plot when we do not

    Chemical Freeze-out for Cu+Cu 22.4 GeV and Au+Au 19.6 GeV

     DEPRACATED.  PLEASE SEE UPDATE

     

    Geydar: lasers for alignment

    Presentation from Geydar Agakishiev for today's TPC meeting attached.

    cuts in the hit errors calibration procedure

     

    Procedure for finding TPC hit errors uses following creteria to select tracks:

    Another talk on Slow Sim work

    Speaker : C. Dritsa


    Talk time : 13:40, Duration : 00:05

    R cut for upsilon analysis

    In all upsilon analyses (pp 2006, AuAu 2007, dAu 2008, pp 2009, AuAu 2010) it is necessary to match candidate tracks with BEMC clusters/towers that could have fired the trigger.

    comparison between StRecTree and StMiniMcTree

    Speaker : jonathan


    Talk time : 13:50, Duration : 00:05

    Slow Simulator

    Speaker : A. Besson


    Talk time : 13:30, Duration : 00:20

    HFT Software

    2011-09-16 13:30
    America/New York
    Friday, 16 September 2011
    510-4867333, at 17:30 (GMT), duration : 00:00

    Hi, here a draft for Software-day, Sept 26 at BNL. This is
    not ordered and also no time-allocations. We should keep it
    free formated and take the time we need to discuss a topic.
    The only exception would be remote presentations, there we
    would need fixed times.

    Agenda/Topics
     
    1) News     
    2) Geometry model (update in XML) - Jason Webb et al.
    3) Slow simulators (path to useful module for us)
       see talks of A. Besson and C. Dritsa posted on Drupal
       I expect comments/ideas from Purdue and drafting doc
       on (our) requirements...but let's try to keep it simple.
    4) CMM/Survey measurements   - update on schedule,
       short/longer term
    5) Evaluation/Analysis work -> minimc.root et al.
       Jonathan and I will present some demo cases/examples
       Open discussion on clean-up (?), enhancement of present
       structures
    6) Software manpower...realistic estimates/relation to MOUs
    7) On-line environment - Initiated by Jerome here:

    http://www.star.bnl.gov/HyperNews-star/protected/get/rts/474.html
    8) DOE request for Software activities after installation
     

    TimeTalkPresenter
    13:30Slow Simulator ( 00:20 ) 1 fileA. Besson
    13:40Another talk on Slow Sim work ( 00:05 ) 1 fileC. Dritsa
    13:50comparison between StRecTree and StMiniMcTree ( 00:05 ) 1 filejonathan
    13:55Minutes ( 00:01 ) 1 file

    Neutral Pion Update 09/15/11

    My slides for today's meeting are attached below.  Since I won't be going into the details of my algorithm, I've also attached my presentation at last March's analysis meeting and my poster fo

    Boltmann Blast Wave Results Cu+Cu 22.4 GeV and Au+Au 19.6 GeV collisions