slides for 4) Evaluation scheme.
Updated on Fri, 2011-09-02 09:58. Originally created by bouchet on 2011-09-02 09:58.Tracking Eval meeting #2
Updated on Fri, 2011-09-02 08:49. Originally created by jeromel on 2011-09-02 08:46.1-189, at 12:42 (GMT), duration : 00:00
In general, we should review the progresses and discuss the below:
- CA - plan for evaluation (do we need additional help as offered by our GSI colleagues)
- Geometry integration - were are we + plan forward (discussed with Jason and re-iterated the FGT goal)
- Stv - progress and code readiness for evaluation
- Vertex integration (previous thread on PPVF) - plan
Pxl Survey Plan
Updated on Fri, 2011-09-02 08:04. Originally created by margetis on 2011-09-02 08:03.Reference
Talk time : 13:40, Duration : 00:05
Run 9 200GeV Dijet Track Correction Investigation
This page details my attempts to come up with a way to correct the bad spectra.
WBS1.6 part in the project
Updated on Fri, 2011-09-02 08:04. Originally created by margetis on 2011-09-01 10:50.Reference
Talk time : 13:35, Duration : 00:05
Looking at jgma's FMS Simulation program from last year
The following information has been found in jgma's working area on RCAS in the directory
/star/u/jgma/psudisk/sim/fpdsim6
The Czech and Slovak physicist conference presentation
The Czech and Slovak physicist conference presentation
Meeting Notes
Updated on Thu, 2011-09-01 11:38. Originally created by rfatemi on 2011-08-31 19:56.getting a DOEGrids https service cert for orion
Requesting a service certificate from DOEGrids:
J/psi in p+p run 6: production P06id vs P06ie
This is a comparison of J/psi signal in p+p run 6 for two productions: production P06id (pre-production) vs P06ie (final production)
Turtle study of y vs theta_y at RP4 compared to Yip Data
Updated on Wed, 2011-08-31 12:43. Originally created by pile on 2011-08-31 12:43.HFT-Software
Updated on Fri, 2011-09-02 14:42. Originally created by margetis on 2011-08-31 11:50.510-4857333, at 17:30 (GMT), duration : 00:00
* There is going to be a face-to-face management meeting
at BNL 9/27-28 (Tues-Wed). There is the idea of having
a software just before or just after this meeting. The
default is after but send me (not the list) your
availability for either.
The agenda will be on high priority tasks and institutional
participation:
1) Calibration infrastructure. This includes CMM measurements,
Data Bases and Structures. This part of software is
officially on (and tracked by) the project. I will draft
a plan for immediate actions by Friday.
2) Geometry Db. This is a lot of work and not for a single
person. Need to define the team and coordinate with
Jason actual implementation. Need to define degree of
details and for this establish the links with the
hardware experts.
3) Simulators. I will invite French experts with code for
the pixel det. to come or video-come to the meeting.
4) Evaluation scheme. Jonathan recently stumbled on this and
reminded us that we need to clarify/establish evaluation
of HFT performances the STAR-way.
5) Cleanup/Move somewhere the Kalman codes.
* Please let me know if you have a topic/presentation to make
this Friday.
Time | Talk | Presenter |
---|---|---|
13:35 | WBS1.6 part in the project ( 00:05 ) 1 file | |
13:40 | Pxl Survey Plan ( 00:05 ) 1 file | |
13:45 | slides for 4) Evaluation scheme. ( 00:20 ) 2 files | jonathan |
FGT geom in MC
Updated on Wed, 2011-08-31 10:29. Originally created by balewski on 2011-08-31 10:28.Reference
Speaker : Jan Balewski
Talk time : 11:43, Duration : 00:20
update on geometry
AOB
Updated on Wed, 2011-08-31 10:03. Originally created by jeromel on 2011-08-31 10:03.Speaker : All ( All )
Talk time : 12:45, Duration : 00:15
AgML into the BFC
Updated on Wed, 2011-08-31 10:11 by jwebb. Originally created by jeromel on 2011-08-31 10:02.Speaker : Jason Webb ( BNL )
Talk time : 12:35, Duration : 00:10
void runBfc()
{
TString opts = "y2011 agml ittf geant sti";
TString file = "/star/data16/simu/rcf11020/output/rcf11020_2000_
Simulation production news
Updated on Wed, 2011-08-31 10:39 by jwebb. Originally created by jeromel on 2011-08-31 10:02.Calibration status for Run 11, 27 GeV and remainder
Updated on Fri, 2011-09-16 12:20 by gdwebb. Originally created by jeromel on 2011-08-31 10:01.Speaker : Grant Webb ( UKY )
Talk time : 12:00, Duration : 00:20