TOF OPS: Switching from N2 mode to freon-only purge mode
Close MV1
Check cylinder on gas pad - open TOP valve on bottle
Draft of the contribution to DSPIN'11 proceedings, second edition.
Here is the second edition of the ntribution to DSPIN'11 proceedings on the A_NN and A_SS.
Meetings
This page contains links to talks given at the following meetings/workshops:
Conferences
This page contains links to STAR Presentations. Talks can also be downloaded from the attachments below.
J/psi in Au+Au and Cu+Cu at 200 GeV Paper Proposal
Title: J/psi production at low pT in Au+Au and Cu+Cu collisions at sqrt(s_NN) = 200 GeV at the STAR detector
Author: Christopher Powell, Daniel Kikola, Grazyna Odyniec
Linux Arc Programmer
How to find and get started using the new Linux version of the ANL ARC firmware programmer.
SMD Yield vs. Tower Energy Plots
SMD Yield vs. Tower Energy Plots
Layer I Plots
Lilian's summary of the SSD survey efforts - Part I
Updated on Thu, 2011-12-01 12:48. Originally created by matis on 2011-12-01 12:48.Speaker : H. Matis
Talk time : 13:35, Duration : 00:20
Current status of SSD slow control
Updated on Thu, 2011-12-01 12:26. Originally created by yanwh on 2011-12-01 12:24.Speaker : Weihua Yan ( Tsinghua University )
Talk time : 13:30, Duration : 00:05
A simple summary of my work on SSD slow control last month.
EIC R&D close-out summary
Updated on Wed, 2011-12-14 19:13 by videbaks. Originally created by rexwg on 2011-11-30 15:05.Reference
Speaker : Flemming Videbaek
Talk time : 16:30, Duration : 00:30
Event generators and simulation needs for eSTAR
Updated on Wed, 2011-12-14 16:56 by macl. Originally created by rexwg on 2011-11-30 15:04.Reference
Speaker : Matt Lamont
Talk time : 16:00, Duration : 00:30
Coffee Break
Updated on Wed, 2011-11-30 15:03. Originally created by rexwg on 2011-11-30 15:03.Reference
Talk time : 15:30, Duration : 00:30
Detector Acceptance Coverage and Physics Topics
Updated on Wed, 2011-12-14 17:22 by dunlop. Originally created by rexwg on 2011-11-30 15:03.Reference
Speaker : James Dunlop
Talk time : 15:00, Duration : 00:30
EIC detector and eSTAR
Updated on Wed, 2011-12-14 17:03 by macl. Originally created by rexwg on 2011-11-30 15:02.Reference
Speaker : Elke Aschenauer
Talk time : 14:30, Duration : 00:30
Transverse Spin Program
Updated on Wed, 2011-12-14 16:55. Originally created by rexwg on 2011-11-30 15:02.Reference
Speaker : Feng Yuan
Talk time : 14:00, Duration : 00:30
Lunch Break
Updated on Wed, 2011-11-30 15:01. Originally created by rexwg on 2011-11-30 15:01.Reference
Talk time : 12:30, Duration : 01:30
Inner Sector Upgrade
Updated on Tue, 2012-02-07 14:21 by jhthomas. Originally created by rexwg on 2011-11-30 15:01.Reference
Speaker : Jim Thomas
Talk time : 12:00, Duration : 00:30