Close-out

Speaker : All


Talk time : 15:40, Duration : 00:40

Production Plan and Schedule

Speaker : Eric Anderssen


Talk time : 15:00, Duration : 00:40

E-Field Shroud

Speaker : Dick Majka


Talk time : 11:45, Duration : 00:30

Requirements and Structual Performance

Speaker : Jason Bessuille ( MIT/Bates )


Talk time : 10:50, Duration : 00:45

Break for daily STAR ops meeting


Talk time : 10:00, Duration : 00:50

Requirements and Interfaces

Speaker : Eric Anderssen


Talk time : 09:11, Duration : 00:45

Overview

Speaker : F.Videbaek


Talk time : 09:01, Duration : 00:10

Introduction to meeting and brief overview of IDS HFT/FGT system

IDS requirement

2010-05-25 09:00
America/New York
Tuesday, 25 May 2010
3-192 Physics Department BNL, at 13:00 (GMT), duration : 00:00

The objective is to review and assess the requirement and readiness for construction of the new inner support structures
in STAR (named West Support Cone, East Support cone, and MSC ) that together will hold the new detector systems. In particular the FGT which
is scheduled to be installed in summer-11 for run-2 and then later HFT system. The meeting is primarily meant to review the requirements for the system,
mechanical, electrostatic etc, and is not a general integration meeting, though some issues may come up.
 

Title:        IDS requirements
Description:    requirements presentation and review
of Cone structures in STAR for FGT/HFT
Community:    STAR
Password:    star_hft
- Phone Bridge
    ID: 1942857
    Password: 7043

EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
    +1 626 395 2112

- USA (BNL, Upton, NY)
    +1 631 344 6100

 

 

TimeTalkPresenter
09:01Overview ( 00:10 ) 1 fileF.Videbaek
09:11Requirements and Interfaces ( 00:45 ) 1 fileEric Anderssen
10:00Break for daily STAR ops meeting ( 00:50 ) 0 files
10:50Requirements and Structual Performance ( 00:45 ) 1 fileJason Bessuille (MIT/Bates)
11:45E-Field Shroud ( 00:30 ) 2 filesDick Majka
15:00Production Plan and Schedule ( 00:40 ) 1 fileEric Anderssen
15:40Close-out ( 00:40 ) 0 filesAll

TOF meeting

2010-06-11 11:00
2010-06-11 12:00
America/New York
Friday, 11 June 2010
EVO, at 15:00 (GMT), duration : 01:00

 Agenda:

 

 

  • Operation status at BNL
  • 25ns shifts, update
  • Offline status
  • TOF QA
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 61494

TOF meeting

2010-06-04 11:00
2010-06-04 12:00
America/New York
Friday, 4 June 2010
EVO, at 15:00 (GMT), duration : 01:00

 Agenda:

 

  • Operation status at BNL
  • 25ns shifts
  • Offline status: TOF PID work
  • TOF QA
  • Simulation work
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 61494

TimeTalkPresenter
10:00PID STUDY UPDATE ( 00:20 ) 1 fileMasa

TOF meeting

2010-05-28 11:00
2010-05-28 12:00
America/New York
Friday, 28 May 2010
EVO, at 15:00 (GMT), duration : 01:00

 Agenda:

 

  • Operation status at BNL
  • Offline status
  • Simulation work
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 61494

 

TOF meeting

2010-05-21 11:00
2010-05-21 12:00
America/New York
Friday, 21 May 2010
EVO, at 15:00 (GMT), duration : 01:00

 Agenda:

  • Operation status at BNL
  • Offline status
  • Joint Spectra-TOF session at UCLA Analysis meeting
  • AOB

EVO:

  • look for TOF meeting in EVO STAR Community
  • phone bridges: 631 344 6100 (BNL) and 626 395 2112
  • meeting ID: 52078

 

Documentation


Talk time : 14:05, Duration : 00:15

Project NICA/MPD

What can we learn from energy scan at CERN SPS? (NA-61)

Two pion correlations from BES

First results on baryon correlations from BES at RHIC

Femtoscopy at WUT

Azimuthally-sensitive pion correlations in the Beam Energy Scan Program at RHIC