HFT Software

2012-01-20 13:30
America/New York
Friday, 20 January 2012
510-4867333, at 18:30 (GMT), duration : 00:00
TimeTalkPresenter
13:30Numbering conventions for HFT ( 00:20 ) 1 file
13:50Geometry ( 00:20 ) 2 filesjonathan/Jim
14:10AOB ( 00:20 ) 0 files
14:30Minutes ( 00:20 ) 1 file

HFT Software

2012-01-13 13:30
America/New York
Friday, 13 January 2012
510-4867333, at 18:30 (GMT), duration : 00:00

 

AGENDA


a) My presentation on the TC meeting last Tuesday is here:
http://drupal.star.bnl.gov/STAR/event/2012/01/10/hft-management-and-techinal-meeting/software

b) We will get an update on Geometry from Jonathan and see
what else needs to be done before we sign off the Y2013
geometry.

c) There has been a lot of discussion on numbering of the HFT
detector elements (on and off the list). I will post by noon
all relevant documents (STAR note, SSD, PXL etc). There is
agreement in most items but minor things are still to be
defined. We should probably write this up as an addendum to
the STAR note csn229B.

d) Other news (Slow sim., CERN data analysis etc)

 

TimeTalkPresenter
13:30Geometry ( 00:20 ) 1 filejonathan
13:50Numbering SSD/IST/PXL ( 00:10 ) 3 files
14:00AOB ( 00:20 ) 2 files
14:20Minutes ( 00:20 ) 1 file

FGT commissioning

2012-01-10 11:00
2012-01-10 12:00
America/New York
Tuesday, 10 January 2012
EVO bridge, at 16:00 (GMT), duration : 01:00

Present: Hal, Anselm, Bernd,Gerard,Ramiro,Will, Jan, Dave U., and Steve G.

 Milestones for FGT comissioning are :  

  1. ***DONE***  demonstarted 90% of channels work before collossions (pedestals are healthy)
  2. ***DONE***  FGT hold 3.6kV w/ ArCo2 gass
  3. demonstarted 90% of channels still work when beam circulates
  4. timing is set
  5. mapping in offline DB is correct
  6. set workig point for pp500 

 

FGT commissioning tasks  ver 2   (time ordered, [M]- denotes a milestone) 

 
------- FEE powered on, STAR DAQ operational ------ 
 
1) setup all control files and demonstarte all GUIs are operational
2a) ped+status table ,  [M1: 90% of APV works & 90% of channels/each APV works]
2b) adjust APV ped in fee , repeat - if needed 
3) access: fix broken hardware
4) HV test w/o beam , N2 gas, 1 day, Bernd, [M2: FGT holds 3.6kV]
5) swap gas , N2-->ArCo2, Bob S. , 1/2 day, just before collisions
------- require collision overnight ---------  
6) HV up/down w/ collisions, 6 days, Bernd+Gerrit
7a) ped+status table , 1 day  [M3: 90%-90% live channels under beam] 
7b)  access: fix broken hardware
------- minB trigger set -----
8)  attempt to catch FGT collision signal during ETOW timing using minB trigger
-------   EHT trigger, possible 3/4 of ETOW HV off to better use avaliable band width ----
10) set timing, 3 data sets taken 2 days apart, 1 week, Jan+Gerard , [M4: timing set]
* set 1 : disperse offsets for groups 5APV (per octant), scan TCD delay to catch collision in some 
* set 2 : adjust all APVs, determine residual corrections per APV
* set 3 : verify signal centered at 2nd time bin for all APV chips
11) re-adjust APV ped
12) verify quadrant mapping, 1 day , few data sets with quadrants HV on/off
13) verify APV mapping, take few data sets with alternative APVs on/off .
--------- regular pp200 physics data taking, many fills  ---------

13) study of FGT working point : multiple data sets, ~2 days per set, considered combinations:

     *gas mix: 70-30 , 90-10 
     * HV set to 3.4, 3.5, 3.6 kV
     * low gain ref data at  low HV with one gas mix
14) verify strip mapping using  large  data sets, needs non-existing software [M5: mapping in DB is correct]

------------ after few weeks of pp200 data taking -------

15) tune APV  params to optimize signal shape,  Criterium:   signal amplitude to noise RMS , no code for that  

16) enable ZS , requires Willie's online monitoring to work, and on-line peds computation (by Tonko's  code?) 

----------- before switch to pp500 ---------

17) chose final working point for FGT HV & gas-mix [M6: pp500 lworking point]

-----------  pp500, take production data: goal prove FGT works ---------

 18) operational L2W algo w/ monitoring , Ross works on it now

 

 

Minutes:

  •  overview of commissioning plan, revision follows (draft schedule in attachment, obsolete), main conclusions:
    • significant # of tasks can and should be accomplished before the first collisions - see green section
      • analysis of ped+stat of one taken already run should proceed now
    • we do not have schedule with dates & names, I'll not give up on this
    • there are 4 people who will be allowed to operate FGT HV are: Benrd,Gerrit,Ross,Ramiro
    • handling of FGT operation in to STAR crew is a very distant idea, the plan is this 4 people will support fgt operation on site as long as it is needed 
    • finding the collision signal in FGT data is perceived as very difficult (shown in red)
      • it is safer to require the EHT trigger (plan A), but also try to see FGT signal with minB trigger during EMC timing scan (very optimistic scenario)
      • FGT deadtime in the early weeks is ~700 us, e.g. 7% dead @ 100 Hz.
      •  may require lower EHT thres and turn of HV for 3/4 of ETOW - need dedictaed trig config & EMC settings
      • deveopement of not existing code fitting time dependence of individual pulses has  been elevated to the top
      • in parallel developement of nonexisting code fitting integrals will be pursued
    • verification of mapping in DB will have 3 phases: quadrant, APV, and strip-level
    • tuning of peds in APV will be done twice: ASAP, and after timing is adjusted
    • not decided what FGT gas pressuer & HV will be set for study of the best working point (days-long data sets in pp200)
      • analysis criteria were discussed: efficiency vs. HV; cluster size; efficiency vs. saturation of cluster energy; MIP signal to pedestal width;
      • with disconnect to avaliable software - there is no code do generate any of those observables nor people to schedule to work on it
    • identified need for software to evaluate signal/noise , needed to tune APV settings
  • the discussion about use of existing vs. developing new code was endless.  People remained faithful to their respective views. In my opinin the comissioning task #16 - enableing ZS for pp500 - requires Willie to finish up the code he started.  Many side benefits justify Willie does it now, not  in a month. 
  • questions from Jan:
    •  access dates  - Bernd will sent a note
    • will FEE be on 24/7 : yes, said Gerard
    • how do we deal with correlated noise : Gerard suspects it is not a big issue, we have ped file taken w/ STAR DAQ and a maker based software to compute sth. Limitted (to 1) possible manopwer. Analysis downgraded in priority, after code for items up to 13 is in hand.
    • when do we switch to ZS mode? G: at the end of pp200.
    • will we ever use  wave form readout mode? G: we do it already. 
  • NOT discuss status of FGT readout based on Willie's plots http://drupal.star.bnl.gov/STAR/node/23008/
 
 
 

 

Summary Discussion

Speaker : All


Talk time : 17:10, Duration : 00:20

Software

Speaker : S.Margetis


Talk time : 16:35, Duration : 00:35

J.Thomas

Speaker : SSD


Talk time : 16:00, Duration : 00:35

Break


Talk time : 15:00, Duration : 01:00

Budget&Schedule

Speaker : S.Morgan


Talk time : 12:50, Duration : 00:20

Integration

Speaker : D.Beavis


Talk time : 14:40, Duration : 00:20

E.Anderssen

Speaker : Global Structures


Talk time : 14:20, Duration : 00:20

IST status

Speaker : G.J. van Nieuwenhuizen ( MIT )


Talk time : 13:45, Duration : 00:35

PXL status

Speaker : L.Greiner


Talk time : 13:10, Duration : 00:35

intriduction and Overview

Speaker : F.Videbaek


Talk time : 12:30, Duration : 00:20

HFT management and techinal meeting

2012-01-10 12:30
America/New York
Tuesday, 10 January 2012
EVO, at 17:30 (GMT), duration : 00:00

 meet at BNL at 1-189

meet at LBNL ??

 

Connection via EVO

Title: HFT management and technical meeting
Description:
Community: STAR
Password: star

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MDMaM8292tDMDn929lD99D

- Password: star
- Phone Bridge
ID: 451 6228
Password: 0952

Eastern Standard Time (-0500)
Start 2012-01-10  12:00
End   2012-01-10  18:00

Japan Standard Time (+0900)
Start 2012-01-11  02:00
End   2012-01-11  08:00

Central European Time (+0100)
Start 2012-01-10  18:00
End   2012-01-11  00:00

Pacific Standard Time (-0800)
Start 2012-01-10  09:00
End   2012-01-10  15:00


EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112

- Switzerland (CERN, Geneva)
+41 22 76 71400

- Slovakia (UPJS, Kosice)
+421 55 234 2420

- Italy (INFN, several cities)
http://server10.infn.it/video/index.php?page=telephone_numbers 
Enter '4000' to access the EVO bridge

- Germany (DESY, Hamburg)
+49 40 8998 1340

- USA (BNL, Upton, NY)
+1 631 344 6100

- United Kingdom (University of Manchester)
+44 161 306 6802

- Australia (ARCS)
+61
Adelaide  08 8463 1011
Brisbane  07 3139 0705
Canberra  02 6112 8742
Hobart    03 623 70281
Melbourne 03 8685 8362
Perth     08 6461 6718
Sydney    02 8212 4591

- Netherlands (Nikhef, Amsterdam)
+31 20 7165293
Dial '2' at the prompt

- Canada (TRIUMF, Vancouver)
+1 604 222 7700

- Czech Republic (CESNET, Prague)
+420 95 007 2386

- France (RAP, Paris)
+33 144 27 81 50


- Skype (tm) (World-wide)
evo.phone
See: 
http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html

TimeTalkPresenter
12:30intriduction and Overview ( 00:20 ) 1 fileF.Videbaek
12:50Budget&Schedule ( 00:20 ) 1 fileS.Morgan
13:10PXL status ( 00:35 ) 1 fileL.Greiner
13:45IST status ( 00:35 ) 1 fileG.J. van Nieuwenhuizen (MIT)
14:20E.Anderssen ( 00:20 ) 1 fileGlobal Structures
14:40Integration ( 00:20 ) 1 fileD.Beavis
15:00Break ( 01:00 ) 0 files
16:00J.Thomas ( 00:35 ) 1 fileSSD
16:35Software ( 00:35 ) 1 fileS.Margetis
17:10Summary Discussion ( 00:20 ) 0 filesAll

SSD Shroud Clearances

Speaker : Jim Thomas


Talk time : 13:20, Duration : 00:20

Yield report and VHDCI testing status

Speaker : L. Greiner


Talk time : 13:00, Duration : 00:20

eSTAR Task Force biweekly meeting

2011-12-21 12:30
2011-12-21 13:30
America/New York
Wednesday, 21 December 2011
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00

eSTAR Task Force biweekly meeting

2012-01-04 12:30
2012-01-04 13:30
America/New York
Wednesday, 4 January 2012
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00

eSTAR phone meeting:

 
EVO ID 109811 Wednesday 12:30--1:30PM
 
Agenda:
 
1) Discussions on workshop summary and to-do list:
Page5, again all talks are available at:
 
2) simulation discussions/progresses:
 a) event generator inputs
 b) ETTIE upgrade simulation progress (Ming Shao) 
    http://drupal.star.bnl.gov/STAR/system/files/eSTAR_simu_0104.pptx
 c) Inner TPC GEANT geometry update and progress (Hao Qiu)
d) Material in TPC wheels and conversions (Dave Underwood)
 
3) R&D project progresses/status
 
4) Forward upgrade tracking resolutions and Detector choices
   See discussions by Carl, Bernd, Jamie, Elke and Ming
   Summary/Conclusions/consensus?
 
5) June upgrade workshop (around RHIC/AGS User Meeting?)
   Possible Time slots: June 8-9, 9-10, 16-17
 
Thanks!
 
Ernst and Zhangbu
 

eSTAR Task Force biweekly meeting

2011-12-21 12:30
2011-12-21 13:30
America/New York
Wednesday, 21 December 2011
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00

eSTAR Task Force biweekly meeting

2011-12-14 12:30
2011-12-14 13:30
America/New York
Wednesday, 14 December 2011
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00