pp2pp analysis

2012-04-18 10:00
2012-04-18 12:00
America/New York
Wednesday, 18 April 2012
1-189 Physics, at 14:00 (GMT), duration : 02:00

pp2pp analysis

2012-04-25 10:00
2012-04-25 12:00
America/New York
Wednesday, 25 April 2012
1-189 Physics, at 14:00 (GMT), duration : 02:00

pp2pp analysis

2012-02-15 10:00
2012-02-15 12:00
America/New York
Wednesday, 15 February 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

1. Update from Ivan

 

2. Other updates: Krakow, ITEP...

Web link:

http://drupal.star.bnl.gov/STAR/event/2012/02/15/pp2pp-analysis

Title: pp2pp
Description:
Community: STAR
Password: elasticpp

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eueneeviveaBaDItaBIu

- Password: elasticpp
- Phone Bridge
ID: 12 5134
Password: 5158


- USA (BNL, Upton, NY)
+1 631 344 6100

- Skype (tm) (World-wide)
evo.phone
See: 
http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
 

 

TimeTalkPresenter
10:00Update ( 00:20 ) 1 fileIvan Koralt

pp2pp analysis

2012-02-22 10:00
2012-02-22 12:00
America/New York
Wednesday, 22 February 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

pp2pp analysis

2012-02-29 10:00
2012-02-29 12:00
America/New York
Wednesday, 29 February 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

pp2pp analysis

2012-01-25 10:00
2012-01-25 12:00
America/New York
Wednesday, 25 January 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00
TimeTalkPresenter
11:00run 9 theta_xy at IR actual minus calculated using Leff's, a Turtle Study ( 00:20 ) 1 filePhil Pile (BNL)
11:00run 9 theta_xy at IR actual minus calculated using Leff's, a Turtle Study ( 00:20 ) 1 filePhil Pile (BNL)

pp2pp analysis

2012-02-01 10:00
2012-02-01 12:00
America/New York
Wednesday, 1 February 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

pp2pp analysis

2012-02-08 10:00
2012-02-08 12:00
America/New York
Wednesday, 8 February 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

1. A_N GPC review preparation

2. Other updates: Phil, Krakow, ITEP...

Web link:

http://drupal.star.bnl.gov/STAR/event/2012/02/08/pp2pp-analysis

Title: pp2pp
Description:
Community: STAR
Password: elasticpp

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eueneeviveaBaDItaBIu

- Password: elasticpp
- Phone Bridge
ID: 12 5134
Password: 5158


- USA (BNL, Upton, NY)
+1 631 344 6100

- Skype (tm) (World-wide)
evo.phone
See: 
http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
 
TimeTalkPresenter
11:00theta_xy at IR error study ( 00:20 ) 0 filesPhil Pile (BNL)
11:20pp2pp, Run9, calculated theta_x,y error – a Turtle study (corrected) ( 00:20 ) 1 filePhil Pile (BNL)

pp2pp analysis

2012-01-18 10:00
2012-01-18 12:00
America/New York
Wednesday, 18 January 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00
TimeTalkPresenter
10:00AN paper ( 00:30 ) 2 files

pp2pp analysis

2012-01-11 10:00
2012-01-11 12:00
America/New York
Wednesday, 11 January 2012
1-189 Physics, at 15:00 (GMT), duration : 02:00

eSTAR Task Force biweekly meeting

2012-02-01 12:30
2012-02-01 13:30
America/New York
Wednesday, 1 February 2012
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00

eSTAR Task Force biweekly meeting

2012-01-18 12:30
2012-01-18 13:30
America/New York
Wednesday, 18 January 2012
EVO 109811 Wednesday 12:30PM, at 17:30 (GMT), duration : 01:00

 

eSTAR phone meeting:
 
EVO ID 109811 Wednesday 12:30--1:30PM
 
Agenda:
 
1) simulation progress
 a) event generator into starsim (Elke/Matt/Jason)
 b) Inner Sector TPC Upgrade (Hao)
 c) ETTIE simulation update (Ming)
     http://drupal.star.bnl.gov/STAR/system/files/eSTAR_simu_0118.pptx
 d) minimum setting for requesting eSTAR production
 
2) Report/update on Forward upgrade (Anselm et al.)
 
3) JET-sPHENIX mini-workshop (Nu Xu et al.)
4) new date for biweek meeting
 
5) June Workshop
 
 
Doodle poll for June workshop:
 
Thanks!
 
Ernst and Zhangbu

test 11


Talk time : 11:00, Duration : 00:20

 test 11

FGT commissioning+soft

2012-01-17 11:00
2012-01-17 12:00
America/New York
Tuesday, 17 January 2012
EVO bridge, at 16:00 (GMT), duration : 01:00

 FGT comissioning & software

Present: Stephen,Hal,Jan, Len,Paul,Anselm,Will

Minutes:

  • Stephen reported he can generate peds+status tables for arbitrary run. The strip QA criteria are based on the pedestal shpe, will evolve. Jan added: later one may incorporate absence of signal as yet more QA step.
  • There is discussion between Renee & Stephen what should be used as key in the offline DB for FGT. They will tell us what has been decided.
  • Ramiro reported he exercised changing of APVs peds or all but one assembly 
    • Action item:  fix not responding assembly 13, RDO=0, ARM=1, GRP=1 (serving 3DA) before STAR close donw on Friday 
    • no furtehr APV ped changes will be  done until a decision is made we want them at a different place than for  run 13016031
    • tenatively we want peds to be 3 sigma above zero for the lowest pedestal in given APV chip
    • Action item:  find peds +RMS for   run 13016031, Jan+Stephen
    • Action item:  Jan asked Ramiro for a series of 6 runs taken with varied pedestals level in selected APVs to verify the gross mapping in DB, details are here
  • Len presented the first stab in to understanding of the time structure of FGT pulses based on the cosmic data. It was welcome we see the raw shapes. It was not so clear if shape params extracted from the cosmic stand data can be used to decide  how to set the timing for STAR daq runs.  We certainly need to develope the tools analyzing those shapes before we will look at the STAR daq data. Len will continue, implementing the following:
    • exclude bad strips
      • Action item:  Stephen, can you please generate list of bad strips for this one cosmic data file we all play and hand it to Len
    • modify the fit function to allow varied T0 for every pulse - this should improve chi2/dof
    • apply constrain for the amplitude shape parameter for all (many) strips served by the same APV for all events - those will be one of the outputs used to decided which APV setting are the best
    • verify if sturated shapes (fig 8) are perhaps associated with a specific hardware
    • current method of finding pedestal as {min ADC} over 5 data values could be replaced by the actual pedestals comming out of the same code producing the status tables.
    • Jan asked to not ask Len to do anything else until we have fully functional tool finding timing shapes.
  • Ramiro and Willie are comissioning now (3pm) automatic generation of raw spectra plots using Willie's software
  • JPlot - awaiting update of plots as discussed earlier, no new plots were requested
  • HV GUI, 3 buttons: Paul reported on existing features of HV GUI (see HN mail),
    • Action item: Paul agreed to add the off/standby/run buttons within a week, to be ready by January 25, if we decide soon and do not ask for ferrari
    • Action item:  FGT folks need to agree what those buttons should do (and do not ask for too much), Jan sent proposal to fgt-hn , please comment within a ~day
  •  SOFTWARE meeting :
    • Action item: Tuesday meetings will be  discontinued, instead commissioning + software meeting will be held on Wednesday
    • it was understood software needed to evaluate pp200 data sets is critical, no clear plan what would it do and who would it develope, Anslem will continue  thinking about it tomorrow
    • Anselm will evaluate cluster finder he developed using geant tracks 

 

Reminder: last week we have agread on the FGT comissioing plan (here)

Agenda:

  1.  Run preparation (ongoing tasks) Jan's 4 slides
    1.  ped+stat determination, ; Stephen; example PDF ,  JAN-SLIDE 1 
      1.  list of broken APVs channels ; Stephen (CSV table?)
      2. exercise full cycle of upload to DB, confirmation (who)
    2.  pedestal adjustment in APV; Ramiro (post,  old settings  run 13015002 , new settings run 13016031),  JAN-SLIDE 2
    3. study of raw signal vs. time bin: Len, work in progress (blog)
    4.  coordination of deployment of Willie's FGT monitoring; Ramiro+Willie,  blog page, Jan-SLIDE-3
    5. missing/changes in FGT plots in JPLot ; All  (see JPlots in  Ramiro's tasks)
    6. status of HV GUI to command 14 quadrants in parallel; Paul
    7. mapping
      1. location of APV vs. Rxy ; Ben+Stephen
      2. mapping - gross check of APV , JAN-SLIDE 4
    8. automatization of the HV , FEE slow control : '3 buttons: on/off/standby'; Paul
    9. Identified manpower/dates/ HV test, gas mix swap; Jan calendar
    10. How will be assemble FGT OPS - use 'open Drupal' ?; Jan
  2.   Software tasks/issues, led by Anselm
    1. eval of pp200 data sets to set working point for pp500
    2.  eval of the cluster finder w/ geant tracks (residua)
    3.  software plan for next 2-3 months (with deadlines?)
    4. date of FGT offline code review


TimeTalkPresenter
11:00test 11 ( 00:20 ) 0 files

Prompt Photon Paper Proposal

Under:

Title: Measurement of the unpolarized cross section and double-helicity asymmetry for direct photon production in polarized proton-proton collisions at $\sqrt{s} = 200 \, \math

Minutes


Talk time : 14:20, Duration : 00:20

AOB


Talk time : 14:00, Duration : 00:20

Numbering SSD/IST/PXL


Talk time : 13:50, Duration : 00:10

Geometry

Speaker : jonathan


Talk time : 13:30, Duration : 00:20

HFT Software

2012-01-20 13:30
America/New York
Friday, 20 January 2012
510-4867333, at 18:30 (GMT), duration : 00:00
TimeTalkPresenter
13:30Numbering conventions for HFT ( 00:20 ) 1 file
13:50Geometry ( 00:20 ) 2 filesjonathan/Jim
14:10AOB ( 00:20 ) 0 files
14:30Minutes ( 00:20 ) 1 file