FGT Weekly Meeting
Updated on Fri, 2012-09-21 07:55. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
FGT Weekly Meeting
Updated on Fri, 2012-12-07 10:58. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
1) Summary of installation : Bernd / Jason / Ross
2) Cabling / Connections : Xuan et al.
3) Discussion on next steps prior to commissioning period for Run 13 : ALL
4) Discussion on manpower needs for Run 13 : ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
Time | Talk | Presenter |
---|---|---|
10:00 | FGT run13 DAQ cable mapping ( 00:20 ) 1 file |
FGT Weekly Meeting
Updated on Fri, 2012-09-28 10:27. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) Update / News : Bernd
2) Status of production of remaining quarter sections : Jason / Ross / Bernd
3) DAQ (ARC / ARM status) : Gerard et al.
4) Summary of software activities : Anselm et al.
5) Manpower / Schedule :
a) Test / Debugging following full installation: November - December 2012
- Connections:
- Gas
- HV connections
- Signal cable connections
- Flush gas
- HV ramp
- Pedestal runs
b) Run 13 (Commissioning / On-site expert coverage during physics running): January - June 2013
- Commissioning: January - February 2012: Need offline crew
- Physics running: March - June 2013: On-site Expert coverage
c) Other lab tests:
- Source tests after installation
6) AOB : ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-10-05 07:30. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) Update / News : Bernd
2) Status of production of remaining quarter sections : Jason / Ross / Bernd
3) DAQ (ARC / ARM status) : Gerard et al.
4) Summary of software activities : Anselm et al.
5) AOB : ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-10-12 10:03. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) Status of production of remaining quarter sections : Ross / Jason
2) Status of tooling at BNL / Installation : Jason
3) Summary of software activities / Cosmic-ray test / MuDst : Anselm / Akio / Renee / Xuan
4) DAQ (ARC / ARM status) : Gerard
5) AOB : ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-10-19 08:26. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
1) Status of production of remaining quarter sections : Jason / Ross / Will
2) Status of tooling at BNL / Installation : Jason
3) Summary of software activities : Akio / Anselm / Renee / Xuan
- Cosmic-ray test
- MuDst
- Slow simulator
4) DAQ (ARC / ARM status) : Gerard
5) DNP FGT talks:
- Hardware: Bernd
- Software: Emily
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-10-26 09:52. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) Status of production of remaining quarter sections : Jason / Ross / Will
2) News on integration : Jason
3) Cosmic-ray testing : Akio / Bernd / Gerrit / Ramiro
4) Summary of software activities : Akio / Anselm / Renee / Xuan
- Cosmic-ray test
- MuDst
- Slow simulator
5) DAQ (ARC / ARM status) : Gerard
6) AOB : ALL
Time | Talk | Presenter |
---|---|---|
10:00 | First readout tests new 3 quadrants ( 00:20 ) 2 files | Gerrit |
FGT Weekly Meeting
Updated on Fri, 2012-11-02 09:57. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) Status of production and tests of remaining quarter sections : Bernd / Jason / Ross / Will
2) Clean-room status at BNL : Bernd / Gerrit / Xuan
3) Installation : Bernd / Jason
4) Summary of software activities : Akio / Anselm / Renee / Xuan
- Cosmic-ray test
- MuDst
- Slow simulator
5) DAQ (ARC / ARM status) : Gerard
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-11-09 11:00. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
1) Status of production and tests of remaining quarter sections : Bernd / Jason / Ross / Will
2) Clean-room status at BNL: Akio / Bernd / Ramiro / Xuan
- HV / Leakage current tests : Xuan
- Gas leak tests / fix : Bernd / Xuan
- Cosmic-ray setup (See below) : Xuan
4) Cosmic-ray test plan : Akio / Bernd
- Step 1: Fix APV parameters (Phase / Latency)
- Step 2: HV scan (3.2kV - 3.6kV in steps of 100V)
- Objective: Timing distribution / Cluster size / Residual / Efficiency for three sets of three quarter sections
5) Summary of software activities : Akio / Anselm / Renee / Xuan
- Cosmic-ray test
- MuDst
- Slow simulator
6) DAQ (ARC / ARM status) : Gerard
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
Picture taken by Xuan:
FGT Weekly Meeting
Updated on Fri, 2012-09-21 09:54. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
1) 2012 1st phase installation: Xuan / Bernd / Jason
2) DAQ (ARC / ARM status) : Gerard et al.
3) Production of remaining quarter sections : Jason / Bernd
4) Summary of software activities : Anselm et al.
5) AOB : ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
Time | Talk | Presenter |
---|---|---|
11:00 | ARM & ARC status and inventory ( 00:01 ) 2 files | gerard |
TPC charge distribution fit to power law
For many years, we have used the following distribution to model space charge in the TPC, taken from StRoot/StDbUtilities/StMagUtilities.cxx:
K+ (for Phi) in run 10 Au+Au 7.7 GeV
Updated on Wed, 2012-09-19 09:56. Originally created by zhux on 2012-09-19 09:56.K+ (for Phi) in run 10 Au+Au 11.5 GeV
Updated on Wed, 2012-09-19 09:54. Originally created by zhux on 2012-09-19 09:54.Minbias Trigger (310014)
Library: SL10h
flat pT: [0, 5] GeV
flat Eta: [-1.1, 1.1]
VertexZ: [-50, 50] cm
Vr < 2 cm
Events: 500 K
No. of Kaon+ per event: 5% remult
Request ID | 20123803 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | New |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, xpzhangnju@gmail.com |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
K+ (for Phi) in run 10 Au+Au 39 GeV
Updated on Wed, 2012-09-19 09:51. Originally created by zhux on 2012-09-19 09:51.Minbias Trigger (280001, 280002)
Library: SL10k
flat pT: [0, 5] GeV
flat Eta: [-1.1, 1.1]
VertexZ: [-40, 40] cm
Vr < 2 cm
Events: 500 K
No. of Kaon+ per event: 5% remult
Request ID | 20123802 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | New |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, xpzhangnju@gmail.com |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
Improving results on transerve double spin asymmetries in the CNI region at STAR
Updated on Wed, 2012-09-19 09:14. Originally created by yipkin on 2012-09-19 09:07.Reference
Speaker : Dima Svirida
Talk time : 09:00, Duration : 00:20
Dima's talk:
Upsilon 1s,2s,3s in p+p Run 9
Updated on Mon, 2013-01-21 12:00 by mstftsm. Originally created by bielcik on 2012-09-18 07:33.----------------------------------------- p+p 200 GeV (year 2009) fast stream data st_upsilon 30K events for each states (1s, 2s, 3s) flat in pT and y: pT= 0 - 10 GeV/c y= -2.0 - 2.0 no VertexZ cut 1 Upsilon per event let the Upsilon decay only into e+e- production version: P11id match data starver: SL11d geant geometry option: y2009 ------------------------------------------
Request ID | 20123801 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Closed |
Physics Working Group | Heavy Flavor |
Requested by | bielcik |
Contact email(s) | akesich@gmail.com, jaroslav.bielcik@fjfi.cvut.cz |
Contact phone(s) | |
PWG email(s) | heavy-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
Request type: | Standard Embedding request (particle in real events) |
Number of events | 30000 = 30 K |
Magnetic Field | Full-Field |
Collision Type | dau 200GeV |
Centrality | ---- SELECT CENTRALITY ---- |
BFC tags | st_upsilon |
Production | ---- SELECT PRODUCTION TAG ---- |
Geometry: simu | |
Geometry: reco | |
Library | SL11d_embed |
Vertex option | Force vertex as MC vertex |
Pileup option | No |
Detector Set |
File lookup |
Particle | Upsilon1S |
Particle settings | Flat in Pt |
Particles per event | 1 |
Vertex Z, cm | -150 < Vertex < 150 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.39 |
η (eta) | -2 < η < 2 |
Pt, GeV | 0 < Pt < 10 |
eSTAR
Updated on Mon, 2012-10-01 09:38. Originally created by xzb on 2012-09-17 10:54.EVO 14 3853 (Tuesday 10/02 noon), at 16:00 (GMT), duration : 01:00
Agenda:
1) Update on FCS
a) physics drives
(diject correlation mapping of CGC boundary)?
use in Heavy-ion runs (lighter ions?)
b) simulations
c) proposal (LoI)?
2) update on iTPC
a) simulation of tracking (Hui et al.)
different padrow configurations
b) proposal
Technically driven schedule
http://drupal.star.bnl.gov/STAR/system/files/STAR_iTPC_technical_schedule_09242012.pdf
DOE (3-4M$?)
possible 3 subprojects:
electronics (DOE) , East (NNSFC?), West(NSF associated with EEMC?)
need engineer cost estimate ;
proposal section contributions;
c) request for iTPC R&D in FY13 (Jim) (~200K$?)
i) design/build a prototype Aluminum Strongback (can we also reduce material)
ii) optimize pad sizes
iii) lab testing of the new pad and wire geometry
iv) winding machine setup/prototyping at IU(?)
v) Super-ALTRO prototyping and design for FEE
3) next EIC R&D calls
https://wiki.bnl.gov/conferences/index.php/EIC_R%25D
Deadline: October 26, 2012 (presentation around November 22, 2012)
4) STAR Analysis and Upgrade Meeting, Nov. 28 - Dec. 2, 2012, UCLA
5) other items
Ernst & Zhangbu
eSTAR
Updated on Tue, 2012-09-18 10:53. Originally created by xzb on 2012-09-17 10:54.EVO 14 3853 (Tuesday 09/04 noon), at 16:00 (GMT), duration : 01:00
Agenda:
1) Update on FCS
a) physics drives
(diject correlation mapping of CGC boundary)?
use in Heavy-ion runs (lighter ions?)
b) simulations
c) proposal (LoI)?
2) update on iTPC
a) simulation of tracking (Hui et al.)
b) proposal
DOE (3-4M$?)
possible 3 subprojects:
electronics (DOE) , East (NNSFC?), West(NSF associated with EEMC?)
need engineer cost estimate ;
proposal section contributions;
3) test beam proposal calls
http://www.star.bnl.gov/HyperNews-star/protected/get/estar/117.html
4) next EIC R&D calls
https://wiki.bnl.gov/conferences/index.php/EIC_R%25D
Deadline: October 26, 2012 (presentation around November 22, 2012)
5) STAR Analysis and Upgrade Meeting, Nov. 28 - Dec. 2, 2012, UCLA
6) other items
Ernst & Zhangbu
STAR Inner Detector Support pictures Sept 2012
A couple of pictures by BNL photography after IDS was lifted to platform.
dev14 misalignment
Updated on Fri, 2012-09-14 11:20. Originally created by bouchet on 2012-09-14 11:20.Reference
Speaker : jonathan
Talk time : 12:50, Duration : 00:20
- look at the Stipulls data when 1 PXL sector is shifted along Z axis by 1 cm