Proton in Run 10 Au+Au 62.4 GeV
Updated on Tue, 2013-01-22 14:33 by huck. Originally created by zhux on 2012-09-22 09:10.K- in Run 10 Au+Au 62.4 GeV
Updated on Tue, 2013-01-22 14:33 by huck. Originally created by zhux on 2012-09-22 09:05.Trigger ID: 270011,270021
|Vz| < 40 cm, |Vr| < 2cm
5% of the multiplicity
flat rapidity |y|<1.1
500k events with flat pT distribution 0.15 < pT< 5GeV/c
Request ID | 20123808 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, Stephen Horvat |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
K+ in Run 10 Au+Au 62.4 GeV
Updated on Tue, 2013-01-22 14:32 by huck. Originally created by zhux on 2012-09-22 09:05.Trigger ID: 270011,270021
|Vz| < 40 cm, |Vr| < 2cm
5% of the multiplicity
flat rapidity |y|<1.1
500k events with flat pT distribution 0.15 < pT< 5GeV/c
Request ID | 20123807 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, Stephen Horvat |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
pi- in Run 10 Au+Au 62.4 GeV
Updated on Sat, 2013-01-19 22:09. Originally created by zhux on 2012-09-22 09:03.Trigger ID: 270011,270021
|Vz| < 40 cm, |Vr| < 2cm
5% of the multiplicity
flat rapidity |y|<1.1
500k events with flat pT distribution 0.15 < pT< 5GeV/c
Request ID | 20123806 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, Stephen Horvat |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
pi+ in Run 10 Au+Au 62.4 GeV
Updated on Sat, 2013-01-19 22:08. Originally created by zhux on 2012-09-22 09:00.Trigger ID: 270011,270021
|Vz| < 40 cm, |Vr| < 2cm
5% of the multiplicity
flat rapidity |y|<1.1
500k events with flat pT distribution 0.15 < pT< 5GeV/c
Request ID | 20123805 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | zhux |
Contact email(s) | zhux@tsinghua.edu.cn, Stephen Horvat |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
survey update
Updated on Fri, 2012-09-21 12:33. Originally created by qiuh on 2012-09-21 12:33.Reference
Talk time : 14:00, Duration : 00:20
Run-13 and HFT
Updated on Fri, 2012-09-21 12:11. Originally created by margetis on 2012-09-21 12:00.Reference
Talk time : 13:40, Duration : 00:20
status : alignment code
Updated on Fri, 2012-09-21 12:05. Originally created by bouchet on 2012-09-21 11:56.ARM & ARC status and inventory
Updated on Fri, 2012-09-21 10:00. Originally created by gvisser on 2012-09-21 09:18.FGT Weekly Meeting
Updated on Fri, 2013-05-03 10:09. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
- FGT J-PLOT QA: Devika
- FGT Offline-QA / Offline Monitor: Danny
- Online QA status: Xuan and Devika
- Accounting for APV chips: Devika
(4) Simulation softare status
- Individual components: Geometry / Slow simulator
- Running complete simulation chain
(5) Summer shutdown activities
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-09-21 07:55. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
FGT Weekly Meeting
Updated on Fri, 2013-04-19 00:40. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
(1) Brief summary of Tuesday presentation: Bernd
(2) Survey needs: Akio et al.
- Discussion
- HV system: Paul / Xuan
- FGT J-PLOT QA: Devika
- FGT Offline-QA / Offline Monitor: Danny
- Online QA status: Xuan and Devika
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2013-03-29 07:06. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
(2) Trigger configuration for FGT and rates: Bernd
- FGT J-PLOT QA: Devika
- FGT Offline-QA: Danny
- Online QA status: Xuan and Devika
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2013-03-22 10:13. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
LINK TO: Commissioning plan
(1) Summary of commissioning activities / status: Bernd
(2) Hardware status / HV ramp : Xuan / Dick
(5) Triggers for FGT: Bernd
- FGT J-PLOT QA: Devika
- FGT Offline-QA: Danny
- Online QA status: Xuan and Devika
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
Time | Talk | Presenter |
---|---|---|
10:00 | HV Ramp Tests, Mar. 20, 2013 ( 00:20 ) 1 file | Dick Majka |
FGT Weekly Meeting
Updated on Fri, 2013-03-15 09:54. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
LINK TO: Commissioning plan
(1) Summary of commissioning activities / status: Bernd
(2) Hardware status: Xuan
- Pedestal study (J-Plot): Devika
- Online QA status: Xuan and Devika
- Run QA table: Bernd
(6) Next steps: ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2012-09-21 07:55. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
FGT Weekly Meeting
Updated on Fri, 2012-09-21 07:55. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
FGT Weekly Meeting
Updated on Thu, 2013-04-11 23:18. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
- HV system: Paul / Xuan
- FGT J-PLOT QA: Devika
- FGT Offline-QA / Offline Monitor: Danny
- Online QA status: Xuan and Devika
(4) Summer shutdown activities
Draft
- Introduction: Executive summary and FGT overview
- Assembly / Installation
- Commissioning and hardware status:
- HV / Gas
- DAQ
- Triggers
- Run 13 QA
- Software status
- Working point adjustment:
- Latency
- HV
- APV parameters
- Basic quarter section performance
- Straight line tracking results (Incl. prelim. residual estimates)
- Plans (Software / Shutdown / Physics)
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2013-04-05 10:49. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
- HV system: Bernd / Paul / Xuan
- Availbability of ARC-II and new ARM / Installation plans: Gerard
- EEMC related triggers (5): EHT0, EHT1, EHT0*EJP1*L2Egamma, EHT1*L2EW, EEMC-dijet
- JP triggers (2): JP0, JP1
- MB triggers (5): MB-base, ZEROBIAS, ZDCMB, BBCMB, VPDMB
- FGT J-PLOT QA: Devika
- FGT Offline-QA / Offline Monitor: Danny
- Online QA status: Xuan and Devika
(5) Summer shutdown activities: Bernd
- Will STAR roll out in summer 2014 in addition to summer 2013?
- Assumption: STAR rolls out and WSC is being extracted in summer 2013
- Take Disks 1-6 out and test for FEE performance and replace APV modules as needed
- Test leakage current / gas performance
- Fix gas flow for two quarter sections on disk 4
- Replace one quarter section on disk 6
- Test / repair of FGT where? HFT activities in clean room --> Therefore: Temple University similar to 2012 shutdown work at MIT Bates (Disks only) - Much easier access to resources e.g. 55Fe source and in particular availability of manpower
- Introduction: Executive summary and FGT overview
- Assembly / Installation
- Commissioning and hardware status:
- HV / Gas
- DAQ
- Triggers
- Working point adjustment:
- Latency
- HV
- APV parameters
- Basic quarter section performance
- Straight line tracking results (Incl. prelim. residual estimates)
- Run 13 QA
- Software status
- Plans (Software / Shutdown / Physics)
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------
FGT Weekly Meeting
Updated on Fri, 2013-02-22 00:23. Originally created by surrow on 2012-09-21 07:55.BNL , at 15:00 (GMT), duration : 00:00
Agenda:
LINK TO: Commissioning plan
2) Cosmic-ray analysis status: Akio
3) Online: Jplots : Anselm
4) Online monitor: Xuan / Devika
5) HV status: Xuan / Bernd / Paul
6) Gas system status / Documentation : Xuan / Bernd / Dick / Gerrit / Don
7) Schedule / Next steps / Commissioning meeting during collaboration meeting: ALL
EVO-------------------------------------------------------------------------------------------
People can connect via EVO (use the following link):
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e9eIeivevta2aiIaaaI9
The password is fgtin2011
You can also connect via phone. Phone bridge numbers can be found at:
http://evo.caltech.edu/evoGate/Documentation/telephone.jsp
The meeting ID is 14 1479 and password 9215.
You can also connect via Skype by adding "evo.phone" (without the
quotes) to your buddy list and calling that contact. Meeting ID and
password are the same as above.
EVO-------------------------------------------------------------------------------------------