HFT Software
Updated on Thu, 2012-12-27 20:49. Originally created by margetis on 2012-12-27 20:49.510-4867333, at 18:30 (GMT), duration : 00:00
HFT Software
Updated on Fri, 2013-02-01 09:55. Originally created by margetis on 2012-12-27 20:49.510-4867333, at 18:30 (GMT), duration : 00:00
1) HFT Hit structures. Document to present to Thomas Ullrich and Jerome.
This also leads to:
2) Feedback to IST Hit/RawHit proposal
3) Geometry troubles/solutions
4) PxlFastSim: status after code pre-review interactions with S&C
5) AOB
Time | Talk | Presenter |
---|---|---|
13:30 | HFT structures in StEvent ( 00:20 ) 1 file | |
13:50 | Feedback on IST structures ( 00:20 ) 2 files | |
14:10 | geometry update ( 00:20 ) 1 file | |
14:30 | PXL Simulators ( 00:20 ) 2 files | Mustafa |
14:50 | pxl survey update ( 00:20 ) 1 file | Hao Qiu |
15:10 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2013-01-25 13:21 by bouchet. Originally created by margetis on 2012-12-27 20:49.510-4867333, at 18:30 (GMT), duration : 00:00
1) Geometry: It has been an intense week but F/J/A have something that even visually shows the work put into it. Need to update DEV13 asap
(S&C god will freeze geometry and create timestamp). There is still the open question of how many sectors are going to be there and where
are they going to be (Flemming with his cosmic argument re-opened an otherwise done deal, ie Xin's 12' o'clock cluster).
2) PXL Rawhit and Hit structures in StEvent.
3) PXL-fastsim in CVS and send for review. Mustafa is active here.
Ongoing business updates (verbal update ok):
4) Survey of finished sector
5) IST structures and FastSim
6) Alignment codes
7) AOB
Time | Talk | Presenter |
---|---|---|
13:30 | PXL Simulators ( 00:20 ) 1 file | Mustafa |
13:50 | sector update ( 00:02 ) 1 file | Videbaek |
13:52 | ist hit ( 00:20 ) 1 file | |
14:12 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2013-01-18 11:06. Originally created by margetis on 2012-12-27 20:49.510-4867333, at 18:30 (GMT), duration : 00:00
AGENDA
1) Geometry refinements for run-13
2) Hao/Jon et al came up with an initial version of two structures for StEvent inclusion Pxl-raw-hit and Pxl-hit. The simulation chain with Mustafa's cleaned up fast sim appears to work fine (we will hear more at the meeting). We will do the same for IST.
3) The first sector for the engineering run is done and under Hao's survey!
Time | Talk | Presenter |
---|---|---|
13:30 | Geometry ( 00:20 ) 1 file | |
13:50 | PXL Hit structures ( 00:20 ) 3 files | |
13:50 | Minutes ( 00:20 ) 1 file |
HFT Software
Updated on Fri, 2013-01-11 09:58. Originally created by margetis on 2012-12-27 20:49.510-4867333, at 18:30 (GMT), duration : 00:00
Since we cannot have an open discussion about every little detail the agenda items will be more general, detailed discussions need to happen in smaller groups. Also I willput first things with higher priority, as I see it or as it is communicated to me from above!
1) We need to focus and finish the Run-13 geometry. We will need to agree on who and when will deliver what. The 'what' parts I am aware of are:
a) pxl sensors on ladders
b) ladder placement on sectors
c) sector dove tail and holder modeling
d) IDS update: shapes and material
e) beam pipe connections
f) recheck materials with as-built hardware, include other massive shapes etc
2) We need to finalize the PXL and IST cluster and hit structures. There are discussion on both going on in the background but we need to check in CVS something soon and update later. This is holding the fast/slow simulator work and chain back.
3) We need to determine who is going to work on a cluster, hit finder for each detector. We need to be specific and realistic here, especially for PXLs.
4) I started working on updating the Web/Doc pages. I need feedback on what is missing on the general structure, now that I am building it. Go here first:
http://drupal.star.bnl.gov/STAR/subsys/hft
The click on SOFTWARE and go here:
http://drupal.star.bnl.gov/STAR/subsys/hft/software
and then click on OFFLINE and also on CURRENT ACTIVITIES/TASKS to go here:
http://drupal.star.bnl.gov/STAR/subsys/hft/software/offline
http://drupal.star.bnl.gov/STAR/subsys/hft/software/current-activitytask-list
As I said, at this point I need comments on overall structures and missing bullets. Many links are just directory dumps (better than nothing) and I started moving old things to 'old docs'.
Time | Talk | Presenter |
---|---|---|
13:30 | Run-13 Geometry update ( 00:10 ) 1 file | Jonathan/Flemming/Amilkar |
13:40 | pxlHitPositionMaker ( 00:20 ) 1 file | Hao Qiu |
13:50 | SComments on Raw data ( 00:20 ) 2 files | Flemming Videbaek |
14:10 | AOB ( 00:20 ) 1 file |
PXL Simulators
Updated on Fri, 2012-12-21 13:25. Originally created by mstftsm on 2012-12-21 13:10.recent codes in CVS
Updated on Fri, 2012-12-21 12:51. Originally created by bouchet on 2012-12-21 12:51.Reference
Talk time : 15:10, Duration : 00:20
This week we have committed some updates ( StPixelFastSimMaker, StiRnD) to do simulation with dev13 and dev14 geometry.
StPixelHit
Updated on Fri, 2012-12-21 12:10. Originally created by rusnak on 2012-12-21 12:10.example of readout flow (from SSD)
Updated on Fri, 2012-12-21 11:39. Originally created by bouchet on 2012-12-21 11:39.StHftHit proposal
Updated on Fri, 2012-12-21 09:00. Originally created by bouchet on 2012-12-21 09:00.Reference
Speaker : jonathan
Talk time : 14:10, Duration : 00:20
proposal for StHftHit based on the comparison btw StRnDHit and existing structure (StSsdHit)
Pixel offline data chain (proposal)
Updated on Thu, 2012-12-20 19:54. Originally created by dongx on 2012-12-20 19:54.pxl alignmentMaker
Updated on Thu, 2012-12-20 19:48 by dongx. Originally created by qiuh on 2012-12-19 20:53.AOB
Updated on Wed, 2012-12-19 07:45. Originally created by jeromel on 2012-12-19 07:45.Speaker : All ( All )
Talk time : 13:00, Duration : 00:05
PPV Modification for 2012 W Production
Updated on Wed, 2012-12-19 11:22 by stevens4. Originally created by jeromel on 2012-12-19 07:19.Speaker : Justin Stevens ( MIT )
Talk time : 12:40, Duration : 00:20
HFT Software - update on activities
Updated on Wed, 2012-12-19 11:46 by margetis. Originally created by jeromel on 2012-12-19 07:18.Speaker : Spiros Margetis ( KSU )
Talk time : 12:20, Duration : 00:20
Embedding updates
Updated on Wed, 2012-12-19 11:47 by zhux. Originally created by jeromel on 2012-12-19 07:17.Speaker : Xianglei Zhu ( THU )
Talk time : 12:00, Duration : 00:20
Software and Computing Meeting
1-189, EVO, at 17:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Embedding updates ( 00:20 ) 1 file | Xianglei Zhu (THU) |
12:20 | HFT Software - update on activities ( 00:20 ) 1 file | Spiros Margetis (KSU) |
12:40 | PPV Modification for 2012 W Production ( 00:20 ) 1 file | Justin Stevens (MIT) |
13:00 | AOB ( 00:05 ) 0 files | All (All) |
eSTAR
EVO 14 3853 (Tuesday 12/18/2012 noon), at 17:00 (GMT), duration : 01:00
a) EIC R&D review report (impression from Flemming)
agenda available:
c) plan/help and deadlines for drafts
d) other progress:
http://drupal.star.bnl.gov/STAR/blog/leun/2012/dec/18/fcs-simulation-setup-2
iTPC simulation
Are we getting the right kinematics?
http://www.star.bnl.gov/HyperNews-star/protected/get/estar/129/1/1.html
http://www.star.bnl.gov/HyperNews-star/protected/get/estar/129/1/1/2/2/1.html
(impact on pp500)
TRD cosmic ray results
Thanks!
Ernst and Zhangbu
eSTAR
EVO 14 3853 (Tuesday 10/02 noon), at 17:00 (GMT), duration : 01:00