FPS meeting, July 28, 2014

Radiation damage test

Order/delivery status

Design

Construction 1st quadrant

Electronics status

Cable status

2013 Barrel Inv - More plots

Histograms attached:
1. Pedestal
2. Rms
3. h3 - detId filled if toweradc for that event for that tower is greater than (pedestal +3*rms)

EEMC Cal Run9-07-25-2014

Get slope SMD gains, find the SMD mask filelist:   51/6912

01U288 1 0 zero counts
01V288 1 0 zero counts
02U288 1 0 zero counts

FPS TUFF CCA JUL 25 2014

 

- re-mapped distribution connections on DB15

- added 1 wire temperature sensor

- single I2C bus chain for AD converters

Pedestal files - 2013 BEMC Noise study

The pedestal txt files are attached:

Run14 Remaining Calibration Tasks and Timelines


Talk time : 01:45, Duration : 00:15

 

Jet Meeting: pT Shifts for Run12 Collins Prelim

 

Weighted Asymmetry Error Calculation

 First worked out by Jim Sowinski too long ago now for me to remember.

EEMC Cal-07-24-2014

Multiply 1.46 to MPV, get the ratio of the SMD gain:

First look at new TPC alignment.

 I processed some of Run

2009 Online monitoring experience & some C-AD activities

Speaker : Kin Yip


Talk time : 11:15, Duration : 00:20

Sti vs Geant Energy Loss

First look at energy losses as seen by Geant and Sti. This is for a single slice at z=-3 cm

Instruction for HFT simulation

This instruction is a guidance of HFT simulation using STAR Geant and software.

FPS FEE BUS CONTROL CCA (TUFF CARD) Schematic JULY 23 2014

 

 This is nearing the final design for TUFF control box and power distribution to FPS FEE's

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

Sti Geometry Check with SL14g - July 23, 2014

I tested the Sti HFT geometry again the SL14g library done on July 22, 2014. Please see the results below. Please refer to the earlier posts for preceeding studies.

Samhain and Beltane notes

Initial thoughts prior to any configuration or use:

Several configuration options to consider right away, some coming with costs...

--enable-suidcheck :

Testing stiscan with geant steps tree

The following images show energy deposited in some Sti volumes for what supposed to be a similar set of tracks, i.e. track generated at z=-3 cm perpendicular to the beam.

STAR Management Meeting

2014-07-31 10:50
2014-07-31 13:00
America/New York
Thursday, 31 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10