Run-11 Transverse Jets: Transverse Momentum Shifts, Part 2 (Full Embedding)
Here, I post the status of the pT-shift and uncertainty calculation. The uncertainties consider the full suite of systematics:
IST Hit Efficiency from Cosmic
Updated on Fri, 2014-08-01 12:47. Originally created by yezhenyu on 2014-08-01 12:46.Reference
Speaker : Zhenyu Ye
Talk time : 14:50, Duration : 00:20
Analysis details can be found at
https://drupal.star.bnl.gov/STAR/event/2014/07/11/hft-software/ist-hit-track-matching-efficiency
IST Slow Simulator
Updated on Fri, 2014-08-01 12:31. Originally created by yezhenyu on 2014-08-01 12:30.IST Pedestal DB status
Updated on Fri, 2014-08-01 12:33. Originally created by babakabi on 2014-08-01 12:28.IST Chip Status DB
Updated on Fri, 2014-08-01 12:32 by yezhenyu. Originally created by ypwang on 2014-08-01 10:52.SSD soft. status/progress
Updated on Fri, 2014-08-01 10:20. Originally created by bouchet on 2014-08-01 10:20.Reference
Speaker : jonathan/Long
Talk time : 13:30, Duration : 00:20
for 5) AOB
Changes in offline/hft/StRoot/StHftPool
Updated on Fri, 2014-08-01 09:59. Originally created by smirnovd on 2014-08-01 09:54.$git --no-pager log --pretty=format:"%h - %an, %ad : %s" --follow master -- hft/StRoot/StHftPool/ 0a2a177 - Dmitri Smirnov, 3 days ago : Switched to conventional return codes 70d973
RCF User Disk Space
Updated on Fri, 2014-08-01 09:40. Originally created by barannik on 2014-08-01 09:40.Speaker : Olga Evdokimov
Talk time : 10:00, Duration : 00:20
status and plan
Updated on Fri, 2014-08-01 08:40. Originally created by jlzhang on 2014-08-01 08:38.Reference
Talk time : 22:00, Duration : 00:20
EEMC Cal Run9-07-31-2014
Use the gain get before, I try to calibrate the tower with energy cuts on pre& postshower:
Energy cut: pMipRelEneLow = 0.5, pMipReleEneHigh=2.0;
timing/cpu tests StiSst
Updated on Thu, 2014-07-31 11:56. Originally created by bouchet on 2014-07-31 11:56.Speaker : jonathan
Talk time : 03:35, Duration : 00:20
Energy Loss Test with Sti (July 23)
Updated on Thu, 2014-07-31 12:29 by testadmin. Originally created by dongx on 2014-07-31 11:47.Speaker : Xin Dong
Talk time : 03:20, Duration : 00:15
HFT soft effort steering meeting
2014-07-31 15:00
2014-07-31 16:00
America/New York
Thursday, 31 July 2014
TBC, at 19:00 (GMT), duration : 01:00
TBC, at 19:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
03:20 | Energy Loss Test with Sti (July 23) ( 00:15 ) 0 files | Xin Dong |
03:35 | timing/cpu tests StiSst ( 00:20 ) 1 file | jonathan |
03:55 | plots of Eloss for different StiSst configs. ( 00:20 ) 1 file | jonathan |
EMC2: Electron Calibration First Look
Attached are:
- Summary slides (first)
- All fits WITH high tower geometry cut (second)
- All fits WITHOUT high tower geometry cut (third)
G3 dEstep Sanity Check
10/14/14
1000 Events
1 pi+ per Event
500 MeV pT (so approximately MIP energy)
IST simplified to air. IBMO + IBAM, and that is it.
1000 Events
1 pi+ per Event
500 MeV pT (so approximately MIP energy)
IST simplified to air. IBMO + IBAM, and that is it.