SSD hit correlation


Talk time : 10:00, Duration : 00:10

 

BES cross check

 

StPeCMaker event rejection cross check update

Speaker : L. Chanaka De Silva ( Creighton University )


Talk time : 11:10, Duration : 00:20

 

Trigger for the coming run.

Speaker : Igor Alekseev ( ITEP )


Talk time : 10:50, Duration : 00:20

A draft of the trigger document.

Brief report

Speaker : R.Debbe BNL


Talk time : 10:30, Duration : 00:20

Sampled x Plots For Inclusive Jets at 500 GeV

For preparing RHIC spin white paper, I try to plot the sampled x distributions by parton jets within the various detector jet pt bins.

Run-11 Transverse Jets: Update to Jet Group (December 2, 2014)

 

STAR Management Meeting

2014-12-12 11:00
2014-12-12 12:30
America/New York
Friday, 12 December 2014
BlueJeans Meeting ID: 260125137, BNL room 1-189, at 11AM, at 16:00 (GMT), duration : 01:30
Agenda:
1) Roman Pot II* status (Wlodek)
2) run15 readiness (Bill)
3) run14 production/readiness (Jerome/Gene)
    a) 14.5GeV production
    b) 200GeV preparation
4) shift sign-up (Renee/Jerome)
5) A_UT preliminary release strategy
6) other items

Thanks!
Zhangbu
TimeTalkPresenter
11:00RP Phase II* status ( 00:20 ) 1 fileWlodek Guryn

STAR Management Meeting

2014-12-19 11:00
2014-12-19 12:30
America/New York
Friday, 19 December 2014
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
agenda: 

1) run15 readiness
   a) detector (Bill)
   b) computing (Jerome/Gene)
   c) shift sign-up (Renee/Jerome)

2) run14 production (Jerome/Gene)
   a) 14.5 GeV
   b) 200 GeV w/ HFT

3) iTPC proposal and sector insertion tool status (Flemming/Zhangbu)
 An internal review was done 12/17/2014 on insertion tool design;  
 Internal review committee to be formed for the proposal.  

4) IST expert plan (Flemming/Zhangbu) 

5) no meeting next week 

Happy Holidays! 

Zhangbu

STAR Management Meeting

2014-12-05 10:00
2014-12-05 11:30
America/New York
Friday, 5 December 2014
BlueJeans Meeting, BNL room 1-189, at 15:00 (GMT), duration : 01:30
Agenda:

1) BlueJeans meeting

2) run14 production preparation
   a) 14.5GeV
   b) status of tracking and preparation

3) abstract submission strategy: (STC chair: Olga)

4) run16 discussions
    pp500 vs AuAu62

5) S&T review action items

6) User facility database




update on FMS code review

run13 W embedding request for period 2 , >=day 129

1) After runQA, we have runlist with 716 (612) runs for L2BW (L2EW) triggered dataset.

online plots

Run-11 Transverse Jets: Cut Optimization (Hadron Radius)

Here, I will show the result of attempting to optimize the cut on hadron ΔR. For this first attempt, I use only simulation.

Run 15 Mid-Rapidity Spin Triggers

Roman pots phase II*

Speaker : Igor Alekseev ( ITEP )


Talk time : 12:30, Duration : 00:20

IS2014 Slide on d+Au Ridge

comments on David 's ICNFP2014 proceedings

Concept of Automate Assembly for ALICE ITS

 

Speaker : X.M. Sun


Talk time : 11:00, Duration : 00:30

abstract for WWND

 The abstract for the 'Future STAR upgrades is attached to this blog

The comments by Frank and Danial has been included in the most recent version (11/30/14)