The 2nd HFT+ Upgrade Discussion Meeting (LBNL)

2015-01-06 09:00
2015-01-07 18:00
America/Los Angeles
-
from Tuesday, 6 January 2015 to Wednesday, 7 January 2015
Nuclear Science Division, LBNL
Conference organizing committee information :  
Conference duration: 2 days

 This meeting is dedicated to discuss the science cases and technical details of the HFT+ proposal to STAR.

Run 11 Relative Luminosity Update

Trigger Board Meeting for Run15

2014-12-08 12:30
2014-12-08 14:00
America/New York
Monday, 8 December 2014
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 17:30 (GMT), duration : 01:30
- Machine and detector statue (Bill)

- Changes in the trigger/number of ticks (Hank)

- DAQ rates and limits (Jeff)

- Trigger requests summary (JH)  

- AOB

Tracking accounting for Sti materials update 2014-12-05

Run 9 200GeV Dijet Kinematics

Look at the initial kinematics probed in the dijet measurements ...

Erratum: Suppression of Υ production in d + Au and Au + Au collisions at √sNN =200 GeV

Erratum:
Suppression of Υ production in d + Au and Au + Au collisions at √sNN =200 GeV

Relevant links:

HFT soft effort steering meeting

2014-12-04 15:00
2014-12-04 16:00
America/New York
Thursday, 4 December 2014
1-165, at 20:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
(the BNL bridge is not currently active)

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________

Agenda:
  • Base QA and speed of SL14i as will be used for AuAu15 production [Jason]
  • Base QA and speed with SSD using more than 3 cylinders [Jason]
  • IST simplified geometry proposal [Jason, Dmitri]
  • Review status of loss of primary tracks and disappearance of track nodes [Victor]
  • Code tagging/branching/propagation to DEV [permanent topic; all]
  • As time allows: any other pending action items' progress


Spin Triggering in Run 15

HF PWG Meeting Minutes by Zhenyu - 2014/11/20

1. NPE in most central U+U collisions - Katarina

Run-11 Transverse Jets: Update to Spin-PWG (December 4, 2014)

 

Reviewed Proceedings

 

Run-11 Transverse Jets: Cut Optimization (Hadron Radius, part II)

As a follow-up from the jet call, I have revisited the resolution study.

TPC SC & GL Au-Au 15 and 200 GeV Update

 

Brief report figure updated

Speaker : R. Debbe BNL


Talk time : 11:30, Duration : 00:20

Simulation for gamma

 

Request for LHAPDF package for PYTHIA8

 From previous studies, the star HF tune has used LHAPDF package since 2008, which has been studied by Thomas Ullrich.

Run13_PP500Gev

 

pair loss correction for 2d correlations

 

Uncertainty of DcaXY splitting in Au+Au at 14.5 GeV

The DcaXY splitting issue for different charged tracks has been found in DEV for a long time, it still exists in DEV earlier than Nov 11th 2014.

KF vs Minuit vertex finder - performance in min-bias Au+Au 200 GeV with HFT

Speaker : Daniel Kikola


Talk time : 10:10, Duration : 00:10
  y2010 AuAu200 y2014 : AuAu14.6 (SL14i)