Lambda in U+U 193 GeV

Request TypeStandard Embedding request (particle in real events)
Description Particle: Lambda
decay mode: p pi-
System & Energy:UU 193GeV
Trigger: 400005/400015/400025/400035
library: SL12id
production tag: P12id

|Vz| < 30 cm
|Vr| < 2 cm
flat rapidity[|y|<0.5],|eta|<1.1
0 < pT < 7GeV/c

5% of the multiplicity
250K events in flat pT,
T=350MeV ]
General Information
Request ID20144601
Priority: EC0
Priority: pwgHigh
StatusQA Sample Available, producing Base QA [4/7]
Physics Working GroupLight Flavor Spectra
Requested byhuangbc for Srikanta
Contact email(s)huangbc@rcf.rchi.bnl.gov, srikanta
Contact phone(s)
PWG email(s)lfspectra-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Standard Embedding request (particle in real events)
Number of events500000 = 500 K
Magnetic Field---- SELECT MAGFIELD ----
Collision TypeUU 193GeV
Centrality---- SELECT CENTRALITY ----
BFC tags
ProductionP12id
Geometry: simu---- SELECT GEOMETRY ----
Geometry: reco---- SELECT GEOMETRY ----
Library---- SELECT STAR LIBRARY ----
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Setnbsp;
Data Sources
Real Data
File lookup&nbsp;
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event5
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-1.1 < η < 1.1
Pt, GeV0 < Pt < 7

background-issue-cut_study-SET2-nearCone-Isolation-cut

Choose 286 runs of highghest zdc rate from run 13 period 1 production. Changed nearCone isolation cut and Et/Pt cut in both Barrel and endcap isolation.
nearCone isolation

beam-crossing-QA-period2-P14ig-production

 Total # of runs : 822 

Fill #s : F17479-F17601

muDst_QA_Run2013_P14ig_production

 Total # of runs 822

Fill # s :  F17479- F17601

Day : 129- Day 161

EEMC Cal Run9-11-14-2014

SSD geom. update

Speaker : jonathan, Flemming


Talk time : 15:00, Duration : 00:20

 

HFT soft effort steering meeting

2014-11-13 15:00
2014-11-13 16:00
America/New York
Thursday, 13 November 2014
1-165, at 20:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________

Agenda:
  • SSD geometry updates [Flemming/Jonathan, Jason, Dmitri]
  • Base QA with IST geometry updates [Jason, Zhenyu]
  • Review status of loss of primary tracks and disappearance of track nodes [Victor]
  • Code tagging/branching/propagation to DEV [all]
  • As time allows: any other pending action items' progress


TimeTalkPresenter
15:00SSD geom. update ( 00:20 ) 1 filejonathan, Flemming

Sanity check of the new IST and SSD geometries

Figure 1 -- LEFT:  Number of GEANT steps taken vs radius, for y2014a in SL14g.  RIGHT:  Number of GEANT steps taken vs radius for y2014a in DEV (11/13/14). 

Mac OSX working K5 config


Under mac OSX 10.10, no luck, DES is disabled by force and aklog will NOT work at least, not until we finish the OpenAFS server upgrade and make

Minutes


Talk time : 11:00, Duration : 00:20

HFT Software

2014-12-03 10:00
America/New York
Wednesday, 3 December 2014
510-4867333, at 15:00 (GMT), duration : 00:00
 
Agenda items

1) Run15: We have a new page for that linked from the subsystem pages
https://drupal.star.bnl.gov/STAR/subsys/hft/hft-run-15
where you can find Xin's presentation to the trigger board meeting about HFT needs
https://drupal.star.bnl.gov/STAR/system/files/TriggerBoard_Run15_HFT_11202014.pdf

2
) Amilkar is looking at SSD info in AuAu. He has some slides on it.

3) AOB
TimeTalkPresenter
10:00SSD hit correlation ( 00:10 ) 1 file
10:10KF vs Minuit vertex finder - performance in min-bias Au+Au 200 GeV with HFT ( 00:10 ) 1 fileDaniel Kikola

HFT Software

2014-11-26 10:00
America/New York
Wednesday, 26 November 2014
510-4867333, at 15:00 (GMT), duration : 00:00

HFT Software

2014-11-19 10:00
America/New York
Wednesday, 19 November 2014
510-4867333, at 15:00 (GMT), duration : 00:00

HFT Software

2014-11-12 10:00
America/New York
Wednesday, 12 November 2014
510-4867333, at 15:00 (GMT), duration : 00:00
 

Agenda

 

1) There is tangible progress in Geant geometries for IST and SSD (thanks

Flemming). Work is still needed for Sti geometry.

2) Hao's tracking changes and his plan (brief update)

3) Gamma tomography work

4) Cluster-based vertex in run14

5) SSD hit correlation with PXL+IST hits

6) AOB

 

7) (SSD workshop at KSU) <- I got some replies but still need an email if

you plan to attend for planning purposes.

TimeTalkPresenter
11:00Minutes ( 00:20 ) 0 files

Run 9 200GeV Dijet Cross Section: Pre/Post Day 153 Comparison

Here I look at the fully unfolded cross sections from the periods before and after day 153 ...

Run12 Calibration: Further HT Geometry Study

 

Welcome

 

Speaker : Spiros


Talk time : 09:00, Duration : 00:10

TOPICS/MAP

SSD meeting Kent State


Talk time : 08:00, Duration : 00:20

Run 12 Trigger Plots

500 GeV
 
Runs 13108001, ...002, ...007, ...008, ...010
 

Comments on Daniel's v2 NPE paper