IST

 

NPE in Run14 Au+Au 200 GeV Meeting Minutes by Zhenyu - 2015/04/17

1. Data

J/ψ Invariant mass vs dphi vs pT

Investigating Single Spin Asymmetries

Relative Luminosities:

R5 = L-+ / L++
R4 = L-- / L++

Plot 1 : N-+/N++ vs R5
Plot 2 : N-+/N-- vs R5/R4

STAR Management Meeting

2015-05-08 12:00
2015-05-08 13:30
America/New York
Friday, 8 May 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1) production priority (MTD stream request)

2) p+Au run15 status and plan
Berndt also mentioned that May 26 there will be a discussion about switching to p+Al

3) BUR status

4) collaboration meeting and APS site visit

5) Heavy-Flavor PWG convenor three candidates; polls in, will select one

STAR Management Meeting

2015-05-01 12:00
2015-05-01 13:30
America/New York
Friday, 1 May 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
 
1) production status (run14) and plan 

2) run status (p+p completion and p+Au preparation)

3) collaboration meeting, and APS site visit 
    encourage everyone to take the survey

4)BUR 16-17

5) establish a "STAR Tracking Focus Group"

Thanks!

Zhangbu

STAR Management Meeting

2015-04-24 12:00
2015-04-24 13:30
America/New York
Friday, 24 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1. run status and preparation for p+A,
2. production status/updates,
3. PWGC updates,
4. Collaboration meeting
5. LRP news
6. AOB

STAR Management Meeting

2015-04-17 12:00
2015-04-17 13:30
America/New York
Friday, 17 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
 
1) run14 production 

2) run15 status and p+Au preparations 

3) BUR and beam species requested: 
    p+A for run16 is not possible, and difficult for run17 
   from Wolfram (nothing is impossible, but): 
   "p+Au and p+Cu in Run-17 is not compatible with the CeC undulator that we plan to install during the summer of 2015.

   Berndt had previously agreed not to schedule any asymmetric species in Run-16 (with the old multi-year run plan)." 

   Ru-96 is difficult to find for Isobar Zr-96. 

   https://drupal.star.bnl.gov/STAR/public/smd/star-bur-run16-17 


4) Quark Matter and BNL PAC meeting preparations 
    https://drupal.star.bnl.gov/STAR/blog/geurts/qm-2015-topics 

5) NSAC meeting (on-going); 

NPE in Run14 Au+Au 200 GeV Meeting Minutes by Zhenyu - 2015/04/10

 This is the first meeting.

Vertex Refitting

This is blog about vertex refitting

 

Motivation 

 

HF meeting 20150416

 

Run 15 drift velocity calibration efficiency

Roundtable on timelines/codes/who


Talk time : 16:40, Duration : 01:20

 

Subsystem usage/modification/implementatiion

Speaker : AQ+Subsystems


Talk time : 16:20, Duration : 00:20

 

QA tests/issues to address

Speaker : AQ+Embedd. coordinator


Talk time : 16:00, Duration : 00:20

 

Maker structure/calls/examples

Speaker : AQ


Talk time : 15:40, Duration : 00:20

 

Method Outline

Speaker : AQ


Talk time : 15:20, Duration : 00:20

 

Brief Overview [Problem, Issues]

Speaker : MM


Talk time : 15:00, Duration : 00:20

 

Roundtable

BREAK