pp summary


Talk time : 12:30, Duration : 00:20

 

Raw Yield Difference

left, from the comment 2 version, right from the original comments

Wire position measurement for MWC in iTPC

 Here we discuss the possibility of 2 dimenstional measurement of the position of wires in MWC.

Acceptance and Hot Tower Cleanup

BFC, and Gamma Simulation

 

Trigger Board Meeting for Run15

2015-04-27 12:30
2015-04-27 14:00
America/New York
Monday, 27 April 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 01:30
 
TimeTalkPresenter
12:30pp summary ( 00:20 ) 1 file

TMVA tests for D0

Following HF meeting (20150416) :

DIS 2015 talk about jets

 

Day113 Analysis

This is an initial analysis of 4 Runs 16133017, ..18, ..19, ..20 

Drell-Yan Summary QCD Bkg Suppression Simulation for 500GeV

Note on StTriggerSimuMaker usage 2015-04-24

Motivation:
StTriggerSimuMaker is used to tell whether bemc or eemc tower should be fired for given trigger.  

Run15 L2 Sample Plots/Docs

 The following plots are needed from these files:

L2Monitoring_ShiftCrew.pdf: All pages needed.

Charm Workshop

FMS Update April 23 2015

Here is an update on the 2015 for the FMS/FPS

HFT efficiencies

 Following the discussion at todays software I have put down some observations.
These raise more questions than the solve, but hopefully they can hep discussions.

Conference Talks : DIS 2015

DIS 2015 [03/31/15- 04/04/2015] - STAR 2013 W AL analysis 

Analysis method for paper

Run6 Gamma + Jet VI

Update on Sti Hit Efficiency Studies

 

Draft STAR note for Gamma + Jet Paper