IST Meeting

2015-11-02 10:00
America/New York
Monday, 2 November 2015
, at 15:00 (GMT), duration : 00:00
IST Calibration I - Yaping
1. IstControl and IstGain and kIstTimeBinFrac vector need to revisit these two tables for simulation once the software is in place - Yaping
2. double check whether the offline reconstruction chain pick up the new DB entries with +1 second time stamps - Yaping
3. cross check the dead chip list between Yaping and Bingchu/Zach's list - Bingchu

IST Calibration II - Bingchu
1. TPC T0 not correct in produced data, let's wait for official reproduction of this data - Bingchu
2. check the fits - Bingchu

IST Software Readiness - Bingchu
1. work started

IST status - Bingchu
1. update the summary and plots


TimeTalkPresenter
10:00Run15 IST Calibration Status I (Pedestal Mean and RMS, Chip Status) ( 00:20 ) 1 fileYaping Wang
10:20Run15 IST Calibration Status II (Gain) ( 00:20 ) 1 fileBingchu Huang
10:40Run15 IST Offline Software Readiness ( 00:20 ) 1 fileBingchu Huang
11:002015 Summer IST Maintenance Work I (Patch Panel Boards, Chip Status) ( 00:20 ) 3 filesBingchu Huang, Zach Miller
11:202015 Summer IST Maintenance Work II (Cooling System) ( 00:20 ) 1 fileJason Bessuille
11:40Summary of Run15 Summer Maintenance Work ( 00:20 ) 1 fileZhenyu Ye for Jason Bessuille

Alignment revisited ( continuation)

Speaker : Bogdan Pawlik


Talk time : 11:40, Duration : 00:20

AOB

Speaker : All ( All )


Talk time : 12:40, Duration : 00:20

Current

  • HPSS downtime was a total "flop". Possible rescheduling perspective in December (??) TBC.

Recent Sti/SST integration activities, a review

Speaker : Jason Webb ( BNL )


Talk time : 12:20, Duration : 00:20

KNN Seed Finder, a review and status

Speaker : Victor Perevoztchikov ( BNL )


Talk time : 12:00, Duration : 00:20

Software and Computing Meeting

2015-10-28 12:00
2015-10-28 13:00
America/New York
Wednesday, 28 October 2015
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00KNN Seed Finder, a review and status ( 00:20 ) 1 fileVictor Perevoztchikov (BNL)
12:20Recent Sti/SST integration activities, a review ( 00:20 ) 2 filesJason Webb (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

SST run 15 calibration

Speaker : joanthan


Talk time : 11:40, Duration : 00:20

 

SSD Simulation

Speaker : Michael L


Talk time : 11:20, Duration : 00:20

 

Alignment revisited

Speaker : Bogdan Pawlik


Talk time : 11:20, Duration : 00:20

UPC PWG J/psi update

Speaker : Chanaka De Silva


Talk time : 11:20, Duration : 00:20

microDST

Speaker : Wlodek Guryn


Talk time : 11:00, Duration : 00:20

 

Altro cuts

Speaker : Irakli


Talk time : 10:00, Duration : 00:20

 
Draft circulated. Awaiting comments

IST/SSD Run15 Alignment

Speaker : Sanshiro


Talk time : 11:00, Duration : 00:20

 

Trigger Efficiency for 151028 MTD Phone Meeting

QA of Run15 Cosmic Run Production

STAR Tracking Focus Group

2015-11-25 09:00
America/New York
Wednesday, 25 November 2015
Phone: 510-4867333, at 14:00 (GMT), duration : 00:00

STAR Tracking Focus Group

2015-11-18 09:00
America/New York
Wednesday, 18 November 2015
Phone: 510-4867333, at 14:00 (GMT), duration : 00:00

STAR Tracking Focus Group

2015-11-11 09:00
America/New York
Wednesday, 11 November 2015
Phone: 510-4867333, at 14:00 (GMT), duration : 00:00

HFT Software

2015-11-04 11:00
America/New York
Wednesday, 4 November 2015
Phone: 510-4867333, at 16:00 (GMT), duration : 00:00
 

1) Next steps in Run15 Calibs

- pre-production sample readiness

- end of run alignment production

 

2) UPPs/DOE
   draft slides are attached. Let discuss what plots to have for efficiency and embedding

 
3) AOB

TimeTalkPresenter
10:00HFT Efficiencies ( 00:20 ) 1 fileMike/Xin
10:20Alignment ( 00:20 ) 1 fileSanshiro
10:40sst calibration run 15 update ( 00:20 ) 1 filejonathan
11:00Minutes ( 00:20 ) 0 files

STAR Tracking Focus Group

2015-10-28 10:00
America/New York
Wednesday, 28 October 2015
Phone: 510-4867333, at 14:00 (GMT), duration : 00:00
 

 

Hi , let’s have a meeting tomorrow to touch base on several things

 

0) Irakli’s draft to spokesman (overdue)

1) Workshop new dates - Draft agenda with S&C constrains

2) Data samples – progress/needs
http://www.usatlas.bnl.gov/~fisyak/star/MuMc/2014/

[ Progress:

    a) MC sample (with and without pileup)  is produced. 

    b) Reconstruction is done without HFT:

          - Sti+CA reconstruction efficiencies is ~10% than Sti.

          - there are some problems in QA plots (DCA_xy) associated with Do and UnDo Distortions.

    c) Reconstruction samples with ideal HFT is next step. ]

3) Other charge items we need to start working on

4) AOB (We need to address the timing comparison between Sti/StiCA and also ghosting )

5) Change of meeting time? 

EVO ID:101 5692

http://research.seevogh.com/joinSRN?meeting=MvM2Ml2D2sDIDu929eDe9v 

TimeTalkPresenter
10:00Altro cuts ( 00:20 ) 1 fileIrakli
10:20Minutes ( 00:20 ) 0 files